Pages that link to "PNO-I-86-055, on 860723,worker Accumulated High Quarterly Radiation Exposure While Changing Video Camera Position for Witnessing Hydrostatic Test in Steam Generator.Caused by Health Physics Technician Monitoring Error"
Jump to navigation
Jump to search
The following pages link to PNO-I-86-055, on 860723,worker Accumulated High Quarterly Radiation Exposure While Changing Video Camera Position for Witnessing Hydrostatic Test in Steam Generator.Caused by Health Physics Technician Monitoring Error:
Displayed 27 items.
- PNO-I-96-085, on 961204,board of Directors of Connecticut Yankee Atomic Power Co Voted to Retire Haddam Neck Nuclear Power Generating Station,After Nearly 29 Yrs of Svc.Nrc Responding to Media Inquires & Present at Press Conference (← links)
- PNO-I-97-014, on 970227,retrieval of Contaminated Matl at Vendor Facility Made.Licensee Dispatched Survey Team, Consisting of HP Supervisor,Hp Technician & Radioactive Matl Handler to Vendor Facility to Survey & Retrieve Matl (← links)
- PNO-I-96-080, on 961102,two Radiation Workers Entered Reactor Cavity & Fuel Transfer Canal Area to Inspect & Collect Debris in Preparation for Flooding Cavity to Accomplish Defueling Operation Causing Airborne Contamination (← links)
- PNO-I-80-041, on 800313,radiological Surveys of Site Grounds Uncovered Three Small Patches of Contaminated Soil Outside Controlled Area.Approx Three Tablespoons Soil Removed.Survey Continuing to Determine If Other Areas Contaminated (← links)
- PNO-I-86-021, on 860226,fuel Element Dropped 3 Ft After Being Lifted W/Upper Guide Structure Out of Reactor Vessel for Refueling.Insp in Progress.Recovery Will Be Attempted on 860227 (← links)
- ML20151Y350 (← links)
- PNO-I-97-049, on 970807,inadvertent Actuation of Halon Sys Occurred Affecting CR & Adjacent Central Alarm Station. Personnel Took Photographs of Panel of Halon Actuation Panel,Prior to Actuation.Root Cause of Actuation Evaluated (← links)
- PNO-I-97-074, on 971203,licensee Announced Senior Mgt Restructuring,Which Included Naming New Chairman,President, Chief Executive Officer,Chief Financial Officer & Promotion of Director of Site Operations (← links)
- PNO-I-86-050, on 860711,plant Shut Down Due to Repairs on Charging Pump a Not Completed within 72 H Limit.Delay Caused by Galling of Rotating Element Locking Nut.Further Delays Expected Due to Tube Cracking Problems (← links)
- ML20212A437 (redirect page) (← links)
- PNO-I-86-055 (redirect page) (← links)
- ML20249A747 (← links)
- ML20249A021 (← links)
- ML20248L292 (← links)
- ML20248J903 (← links)
- ML20248H944 (← links)
- ML20248H781 (← links)
- PNO-I-89-078, notifies of Potential Strike by Svcs Personnel on Weekend of 890909-10.Personnel from Bargaining Unit Will Assist Util Staff in Certain Maint & Const Activities & Util Developed Contingency Plan (← links)
- PNO-I-98-033, on 980728,licensee Identified Leak of Approximately 1,000 Gallons of Demineralized Water & Chemical Agents Used for Decontamination of Plant Sys.Region I Radiation Specialist Will Be Onsite to Review Licensee (← links)
- ML20236P504 (← links)
- PNO-I-89-013, on 890224,licensee Identified Unmonitored Release Path from Uncontrolled Spent Fuel Bldg Drain Through Switchyard Drain Sys.Caused by Radwaste Water Being Erroneously Discharged Into Floor Drain.Drain Plugged (← links)
- PNO-I-87-056, on 870620,security Guard Found in Possession of half-smoked Marijuana Cigarette.Guard Escorted Offsite & & Site Access Terminated.State of CN Police Notified. Addl Drug Screening of Personnel Under Consideration (← links)
- PNO-I-86-096, on 861130,reactor Tripped from Full Power Due to Low Water Level & Steam/Feed Mismatch in Steam Generator 3.Caused by Technician Shorting Out Control Power.Cracked Check Valve Replaced (← links)
- PNO-I-99-039, on 990831,Haddam Neck Plant CR Was Notified by Transportation Contractor,Hittman Transportation Svcs,That Driver of Truck,Left Plant Earlier in Day Noticed Water Leakage from from sea-land Container He Was Transporting (← links)
- PNO-I-86-050A, on 860715,plant Taken to Cold Shutdown. Preparations for Tube Plugging of Approx 70 Steam Generator Tubes w/50% or Greater through-wall Indications in Top Inch of Rolled Area of Tubes Continuing (← links)
- PNO-I-97-073A, on 971210,update of Offsite Surveys for Contaminated Blocks Made.Total of 114 Blocks Out of 3032 Indicated Radioactive Contamination at Greater than Two Times Background Levels.Licensee Plans to Return to Sites (← links)
- PNO-I-97-073, survey Identified Former Cask Wash Down Area Needing Further Characterization & Remediation within Licensee Control Area.Concrete Blocks Used for Temporary Shield Wall Was Used by 15 Households as of 971130 (← links)