Pages that link to "05000423/LER-1996-021, Forwards LER 96-021-02 Re Components Not Included in IST Program as Result of Programmatic Deficiencies.Status of NNECO Commitments from Previous LER Suppl Are Contained in Attachment 1.Addl Commitments Contained in Attachment"
Jump to navigation
Jump to search
The following pages link to 05000423/LER-1996-021, Forwards LER 96-021-02 Re Components Not Included in IST Program as Result of Programmatic Deficiencies.Status of NNECO Commitments from Previous LER Suppl Are Contained in Attachment 1.Addl Commitments Contained in Attachment:
Displayed 50 items.
- 05000245/LER-1996-063, Forwards LER 96-063-01,documenting Event Occurred at Unit 1 on 961126.Commitments Made within Ltr Listed as Submitted (← links)
- 05000423/LER-1996-009, Submits Table of Commitments Re LER 96-009-02 Per 10CFR50.73(a)(2)(ii) (← links)
- 05000336/LER-1996-031, Forwards LER 96-031-01,documenting Event Occurred at Unit 2 on 961003.Commitments Made within Ltr Listed (← links)
- 05000245/LER-1996-020, Forwards LER 96-020-02,documenting Event Occurred at Unit 1 on 960322.Supplemental Rept Provides Update to Vol Calculations.Commitment B15674-3 Updated (← links)
- 05000245/LER-1996-037, Forwards Supplemental LER 96-037-02 Which Documents an Event That Occurred at Mnps,Unit 1 on 960327,per 10CFR50.73(a)(2)(ii) (← links)
- 05000423/LER-1996-045, Forwards LER 96-045-00,documenting Condition That Was Determined at Millstone Unit 3 on 961107.LER Submitted Pursuant to 10CFR 50.73(a)(2)(ii).Commitments Encl (← links)
- 05000423/LER-1996-044, Forwards LER 96-044-00,documenting Condition That Was Determined at Millstone Unit 3,on 961108.Commitments,encl (← links)
- 05000423/LER-1996-042, Provides Util Revised Plans for Implementation of Commitment Made in LER 96-042-00 (← links)
- 05000423/LER-1996-047, Revises Commitment Made in Response to LER 96-047-00 Re Seismic Qualification Training (← links)
- 05000423/LER-1996-050, Revises Commitments Previously Submitted to NRC in LER 96-050-00 Re Range of Control Bldg Chilled Water Pump Gauges Used for Surveillance Not in Accordance W/Asme Chapter XI Requirements (← links)
- 05000245/LER-1996-009, Forwards LER 96-009-01 Per 10CFR50.73(a)(2)(ii).Submits Remaining Commitment in Ltr (← links)
- 05000423/LER-1996-031, Forwards LER 96-031-01 Per 10CFR50.73(a)(2)(v).Commitments Contained within Attachment 1 to Ltr (← links)
- 05000245/LER-1996-054, Submits Change to Commitment Made in LER 96-054-01,dtd 961216.Listed Commitment Is Same Except for Change in Completion Date (← links)
- 05000423/LER-1996-049, Forwards LER 96-049-01,documenting an Event That Occurred at Mnps,Unit 3 on 961211.Commitments Made within Ltr,Encl (← links)
- 05000336/LER-1996-029, Forwards LER 96-029-01,providing Update on Analyses & Investigation for Event.Commitments Made within Ltr,Listed (← links)
- 05000423/LER-1996-037, Revises Commitment Previously Submitted to NRC in LER 96-037-00, SFP Cooling Sys Potentially Inoperable Following SSE Due to Failure of Non Seismic Connecting Piping (← links)
- 05000423/LER-1996-021 (redirect page) (← links)
- ML20140B338 (redirect page) (← links)
- 05000423/LER-1996-021, Clarifies Commitments & Revises Schedule for Commitments, Previously Submitted to NRC in LER 96-021-01 Re Components Not Included in in-service Test Program as Result of Programmatic Deficiencies (redirect page) (← links)
- ML20132F926 (redirect page) (← links)
- ML20132F931 (← links)
- 05000245/LER-1996-046, Forwards LER 96-046-03,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 960627 Per 10CFR50.73(a)(2)(i).Util Commitments Made within Ltr, Listed (← links)
- 05000423/LER-1996-028, Informs of Rev to Commitment Made in LER-96-028-01 Re Temporary Mod of Cce Sys.W/Revised Commitment (← links)
- 05000423/LER-1996-048, Provides Commitments Re LER 96-048.Surveillance Procedures Used to Test Load Shed & re-energizing Feature for Both Trains of Charging Sys Pumps Will Be Revised to Conform W/ TS 4.8.1.1.2.g.6 (← links)
- 05000245/LER-1996-055, Forwards LER 96-055-00 Re Failure to Verify Emergency Diesel Air Start Requirements.Commitments Submitted (← links)
- 05000423/LER-1996-026, Forwards LER 96-026-02 Which Documents Condition That Was Determined at Plant,Unit 3 on 960730 (← links)
- 05000245/LER-1996-053, Forwards LER 96-053-00,documenting Event Occurred at Unit 1 on 961002.Util Will Develop Necessary Procedures to Perform Monthly Source Checks for Monitors & Instrument Calibrs Will Be Performed Monthly to Satisfy TS Requirement (← links)
- 05000336/LER-1996-043, Fowards LER 96-043-00,documenting Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 961231.Util Commitments Made within Ltr,Listed (← links)
- 05000423/LER-1996-019, Forwards LER 96-019-01 Documenting Event That Occurred at Millstone Nuclear Power Station Unit 3 on 960627.Util Commitments Made within Ltr,Listed (← links)
- 05000336/LER-1996-042, Forwards LER 96-042-00,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 2 on 961218.Commitments Made within Ltr (← links)
- 05000245/LER-1996-064, Forwards LER 96-064-00,documenting an Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 961220.Commitments Made within Ltr,Listed (← links)
- 05000423/LER-1996-051, Forwards LER 96-051-00 & Util Commitments in Response to Event (← links)
- 05000336/LER-1996-041, Forwards LER 96-041-00,documenting Event at Plant on 961217.Commitments Made Re Event Listed (← links)
- 05000336/LER-1996-023, Forwards Suppl LER 96-023-01,providing Update on Analysis & Investigation of Event That Occurred at Milestone Station on 960425 (← links)
- 05000336/LER-1996-040, Forwards LER 96-040-00,documenting Event That Occurred at Mnps,Unit 2 on 961212.Commitment Made within Ltr,Listed (← links)
- 05000245/LER-1996-049, Forwards LER 96-049-01,documenting Event That Occurred at Mnps,Unit 1 on 960524,per 10CFR50.73(a)(2)(i) & 10CFR50.73(a)(2)(v).Util Commitments Listed (← links)
- 05000245/LER-1996-003, Forwards LER 96-003-02 Which Documents an Event That Occurred at Mnps,Unit 1 on 960111,per 10CFR50.73(a)(2)(i) & 10CFR50.73(a)(2)(ii).Commitments Made in Ltr,Submitted (← links)
- 05000245/LER-1996-056, Forwards LER 96-056-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 961212,per 10CFR50.73(a)(2)(i). Commitments Made within Ltr,Submitted (← links)
- 05000336/LER-1996-039, Forwards LER 96-039-00 Which Documents Event That Occurred at Mnps,Unit 2 on 961106.Commitment Made within Ltr,Listed (← links)
- 05000336/LER-1996-037, Provides List of Commitments Re LER 96-037 (← links)
- 05000336/LER-1996-038, Forwards LER 96-038.Commitments Made Re LER Submitted (← links)
- 05000245/LER-1996-062, Submits List of Commitments Made Re LER 96-062-00.Util Commits to Perform Engineering Calculations to Quantify Consequences of Failure of 1-AC-10 During Fuel Handling Accident (← links)
- 05000245/LER-1996-060, Forwards LER 96-060-00 Which Documents an Event That Occurred at Mnps,Unit 1 on 960408.Commitment Listed (← links)
- 05000245/LER-1996-061, Submits List of Commitments to LER 96-061-00.Util Will Document Containment Isolation Design Requirements for RWCU Sys Auxiliary Pump Operation Mode (← links)
- 05000423/LER-1996-007, Forwards LER 96-007-02 Which Supplements Rept Submitted on 960502,per 10CFR50.73(a)(2)(ii)(B),10CFR50.73(a)(2)(v)(B&D), 10CFR50.73(a)(2)(vii)(B&D).Commitments in Response to Event, Encl (← links)
- 05000245/LER-1996-026, Forwards LER 96-026-01,documenting Event Which Occurred on 960321.Commitments Listed (← links)
- 05000245/LER-1996-051, Forwards Suppl LER 96-051-01.Commitments Listed,Including Implementation of Mods to Restore Each Identified Piping Sys to Design Basis (← links)
- 05000245/LER-1996-031, Forwards LER 96-031-01.Util Commits That All DC Circuits within Fuse Control Program Will Have Fuses W/Properly Certified DC Rating Prior to Startup for Operating Cycle 16 (← links)
- 05000245/LER-1996-059, Forwards LER 96-059-00.Util Commits That Design Basis of Reactor Feed Pump High Level Trip Circuitry Will Be Reevaluated to Verify Proper Applicability of Physical Separation,Redundancy & Single Failure Requirements (← links)
- 05000245/LER-1996-057, Submits Commitments Made Re LER 96-057.Breakers Which Are Racked Down Will Be Secured within Cubicle to Prevent Movement Using Existing Hardware Associated W/Elevator Mechanism by 961230 (← links)
- 05000423/LER-1996-046, Fowards LER 96-046-00.Licensee Commitments Listed,Including Containment Fuel Drop Radiation Monitor Design Reviewed & TS Change Request Will Be Submitted to NRC for Approval (← links)
- 05000336/LER-1996-035, Forwards LER 96-035-00,documenting Occurrence on 961009. Commitments Listed (← links)
- 05000423/LER-1996-035, Forwards LER 96-035-00.MOV Calculations Will Be Revised Based on Bounding Application Factor/Pullout Efficiency or MOV Specific Performance Characteristics Prior to start-up from Current Outage (← links)
- 05000423/LER-1996-032, Forwards LER 96-032-00 Re 960909 Event.Listed Commitments Will Be Completed Including Performance of Hydrostatic Test of Sih Relief Valves (← links)