Letter Sequence Request |
---|
|
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval
Other: JAFP-17-0083, Report of Full Compliance with March 12, 2012, Commission Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, ML17306A484, ML18156A151, ML18180A314, ML18249A169
|
MONTHYEARNRC 2017-0037, High Frequency Seismic Evaluation Confirmation Report2017-08-0202 August 2017 High Frequency Seismic Evaluation Confirmation Report Project stage: Request ML17230A0882017-08-10010 August 2017 Submittal of High Frequency Supplement for Information Per 10CFR50.54(f) Re Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident Project stage: Supplement ML17234A4782017-08-22022 August 2017 Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.4 Path 4: GMRS ≪ 2xSSE Project stage: Request JAFP-17-0083, Report of Full Compliance with March 12, 2012, Commission Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2017-08-29029 August 2017 James a Fitzpatrick, Report of Full Compliance with March 12, 2012, Commission Order to Modify Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other ML17244A2692017-08-29029 August 2017 Catawba Nuclear Station High Frequency Supplement to Seismic Hazard Screening Report, Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Re Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima D Project stage: Supplement ML17256A7752017-09-11011 September 2017 NRR E-mail Capture - (External_Sender) Seabrook Flooding MSA Project stage: Request MNS-17-040, (Mns), Units 1 and 2 - Supplement to the High Frequency Supplement to Seismic Hazard Screening Report, Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force ..2017-09-27027 September 2017 (Mns), Units 1 and 2 - Supplement to the High Frequency Supplement to Seismic Hazard Screening Report, Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force .. Project stage: Supplement ML17291A7082017-10-23023 October 2017 Staff Review of Mitigating Strategies Assessment Report of the Impact of the Re-evaluated Seismic Hazard Developed in Response to the March 12, 2012, 50.54(f) Letter Project stage: Approval ML17277B1092017-10-23023 October 2017 Staff Review of Mitigating Strategies Assessment Report of the Impact of the Reevaluated Seismic Hazard Developed in Response to the March 12, 2012, 50.54(F) Letter Project stage: Approval ML17310B5312017-11-16016 November 2017 Staff Review of Mitigating Strategies Assessment Report of the Impact of the Re-Evaluated Seismic Hazard Developed in Response to the March 12, 2012, 50.54(f) Letter Project stage: Approval ML17306A4842017-11-29029 November 2017 Flood Hazard Mitigation Strategies Assessment Project stage: Other NL-17-1889, NEI 12-06, Appendix H, Revision 4, H.4.5 Path 5: GMRS Greater than 2 X SSE, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information2017-12-0505 December 2017 NEI 12-06, Appendix H, Revision 4, H.4.5 Path 5: GMRS Greater than 2 X SSE, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information Project stage: Request ML17349A9912017-12-21021 December 2017 Units 1 and 2 - Staff Review of Mitigating Strategies Assessment Report of the Impact of the Re-Evaluated Seismic Hazard Developed in Response to the March 12, 2012, 50.54(f) Letter (CAC Nos. MF7843 and MF7844, ... Project stage: Approval CNS-17-058, Supplement to the High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukus2017-12-28028 December 2017 Supplement to the High Frequency Supplement to Seismic Hazard Screening Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushi Project stage: Supplement ML17313A8812018-01-22022 January 2018 Staff Review of Mitigating Strategies Assessment Report of the Impact of the Reevaluated Seismic Hazard Developed in Response to the March 12, 2012, 50.54(f) Letter (CAC Nos. MF7809 and MF7810; EPID L-2016-JLD-0006) Project stage: Approval ML18017A1212018-01-30030 January 2018 Staff Review of Mitigating Strategies Assessment Report of the Impact of the Reevaluated Seismic Hazard Developed in Response to the March 12, 2012, 50.54(f) Letter Project stage: Approval ML18033A2092018-02-0707 February 2018 Staff Review of Mitigating Strategies Assessment Report of the Impact of the Re-Evaluated Seismic Hazard Developed in Response to the March 12, 2012, 50.54(F) Letter Project stage: Approval ML18040A4542018-02-20020 February 2018 Staff Review of Mitigating Strategies Assessment Report of the Impact of the Re-Evaluated Seismic Hazard Developed in Response to the March 12, 2012, 50.54(F) Letter Project stage: Approval ML18068A6542018-03-22022 March 2018 Staff Review of Mitigating Strategies Assessment Report of the Impact of the Re-Evaluated Seismic Hazard Developed in Response to the March 12, 2012, 50.54(F) Letter Project stage: Approval CNL-18-007, Seismic Probabilistic Risk Assessment Supplemental Information2018-04-10010 April 2018 Seismic Probabilistic Risk Assessment Supplemental Information Project stage: Request ML18115A5082018-04-30030 April 2018 Staff Review of Mitigating Strategies Assessment Report of the Impact of the Reevaluated Seismic Hazard Developed in Response to the March 12, 2012, 50.54(F) Letter Project stage: Approval ML18130A7502018-05-0909 May 2018 Report of Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements of Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Request ML18159A2892018-06-13013 June 2018 Staff Review of Mitigation Strategies Assessment Report of the Impact of the Reevaluated Seismic Hazard Develop in Response to the March 12, 2012, 50.54(f) Letter Project stage: Approval NL-18-0684, Fukushima Near-Term Task Force Recommendation 2.1: Seismic Supplemental Information Regarding NEI 12-06. Appendix H. Revision 4. H.4.5 Path 5 Mitigating Strategies Assessment (MSA) Report2018-06-25025 June 2018 Fukushima Near-Term Task Force Recommendation 2.1: Seismic Supplemental Information Regarding NEI 12-06. Appendix H. Revision 4. H.4.5 Path 5 Mitigating Strategies Assessment (MSA) Report Project stage: Supplement ML18180A3142018-07-10010 July 2018 Seismic Hazard Mitigation Strategies Assessment (CAC Nos. MF7888 and MF7889; EPID L-2016-JLD-0006) Project stage: Other ML18156A1512018-07-12012 July 2018 Seismic Hazard Mitigation Strategies Assessment (CAC Nos. MF7891 and MF7892; EPID L-21016-JLD-0006) Project stage: Other ML18184A2732018-07-18018 July 2018 Staff Review of Mitigation Strategies Assessment Report of the Impact of the Reevaluated Seismic Hazard Developed in Response to the March 12, 2012, 50.54(f) Letter (CAC No. MF7819; EPID L-2016-JLD-0006) Project stage: Approval ML18173A1652018-07-19019 July 2018 Staff Review of Mitigation Strategies Assessment Report of the Impact of the Reevaluated Seismic Hazard Developed in Response to the March 12, 2012, 50.54(f) Letter (CAC No. MF7828; EPID L-2016-JLD-0006) Project stage: Approval ML18207A8542018-08-14014 August 2018 Staff Review of Mitigating Strategies Assessment Report of the Impact of the Reevaluated Seismic Hazard Developed in Response to the March 12, 2012, 50.54(F) Letter Project stage: Approval ML18236A1912018-08-29029 August 2018 Staff Review of Mitigation Strategies Assessment Report of the Impact of the Reevaluated Seismic Hazard Developed in Response to the March 12, 2012, 50.54(f) Letter (CAC No. MF7875; EPID L-2016-JLD-0006 Project stage: Approval ML18249A1692018-09-0707 September 2018 Seismic Hazard Mitigation Strategies Assessment (CAC Nos. MF7800 and MF7801; EPID L-2016-JLD-0006) Project stage: Other ML18262A4152018-09-27027 September 2018 Staff Review of Mitigating Strategies Assessment Report of the Impact of the Reevaluated Seismic Hazard Developed in Response to the March 12, 2012, 50.54(f) Letter (CAC No. MF7893; EPID No. L-2016-JLD-0006) Project stage: Approval 2018-02-20
[Table View] |
|
---|
Category:Letter type:NL
MONTHYEARNL-24-0031, Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R232024-01-29029 January 2024 Inservice Inspection Program Owner'S Activity Report (OAR-1) for Outage 2R23 NL-24-0020, Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report2024-01-22022 January 2024 Plan, Unit 1 Responses to NRC Request for Additional Information for Refueling Outage 1R24 Steam Generator Tube Inspection Report NL-23-0926, Correction of Technical Specification Typographical Error2024-01-12012 January 2024 Correction of Technical Specification Typographical Error NL-23-0878, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0827, Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.142023-11-17017 November 2023 Response to Requests for Additional Information for a License Amendment Request and a Proposed Alternative Related to TS 3.4.14 NL-23-0750, Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr2023-10-0404 October 2023 Response to Second Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the Colr NL-23-0745, Refueling Outage 1R24 Steam Generator Tube Inspection Report2023-09-22022 September 2023 Refueling Outage 1R24 Steam Generator Tube Inspection Report NL-23-0695, Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002S2)2023-08-31031 August 2023 Response to Round 2 Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters Operating, Completion Time Extension (LAR-22-002S2) NL-23-0666, License Amendment Request: Remove Combined License Appendix C (LAR 23-008)2023-08-28028 August 2023 License Amendment Request: Remove Combined License Appendix C (LAR 23-008) NL-23-0670, Response to Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-144832023-08-11011 August 2023 Response to Request for Additional Information Regarding License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-14483 NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0672, Licensee Guarantees of Payment of Deferred Premiums2023-08-10010 August 2023 Licensee Guarantees of Payment of Deferred Premiums NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0611, Core Operating Limits Report, Cycle 11 Version 12023-07-19019 July 2023 Core Operating Limits Report, Cycle 11 Version 1 NL-23-0584, Preservice Inspection Program Owner'S Activity Report2023-07-10010 July 2023 Preservice Inspection Program Owner'S Activity Report NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement NL-23-0506, to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications2023-07-0505 July 2023 to Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications NL-23-0541, Inservice Inspection Program Owners Activity Report for Outage 1R242023-06-28028 June 2023 Inservice Inspection Program Owners Activity Report for Outage 1R24 NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal NL-23-0339, Response to Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters - Operating, Completion Time Extension (LAR-22-002S1)2023-06-13013 June 2023 Response to Request for Additional Information Regarding License Amendment Request for Technical Specification 3.8.3, Inverters - Operating, Completion Time Extension (LAR-22-002S1) NL-23-0455, Report of 10 CFR 50.59 Changes, Tests, and Experiments and 10 CFR 52 Appendix D Departure Report2023-06-12012 June 2023 Report of 10 CFR 50.59 Changes, Tests, and Experiments and 10 CFR 52 Appendix D Departure Report NL-23-0467, Response to Request for Additional Information Regarding License Amendment Request: Timing of Unit 4 Technical Specifications Effectiveness Prior to Initial Criticality (LAR-23-005S1)2023-06-0909 June 2023 Response to Request for Additional Information Regarding License Amendment Request: Timing of Unit 4 Technical Specifications Effectiveness Prior to Initial Criticality (LAR-23-005S1) NL-23-0346, License Amendment Request for Exception to Regulatory Guide 1.163 (LAR 23-007)2023-05-25025 May 2023 License Amendment Request for Exception to Regulatory Guide 1.163 (LAR 23-007) NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. NL-23-0385, License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006R1)2023-05-17017 May 2023 License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006R1) NL-23-0398, Withdrawal of Request of License Amendment Request Regarding More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006)2023-05-16016 May 2023 Withdrawal of Request of License Amendment Request Regarding More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006) NL-23-0372, Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 20222023-05-10010 May 2023 Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 2022 NL-23-0360, Supplement to License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel2023-05-0505 May 2023 Supplement to License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel NL-23-0326, Response to Apparent Violation in NRC Inspection Report 05000424, 425/2023090; EA-22-1082023-05-0101 May 2023 Response to Apparent Violation in NRC Inspection Report 05000424, 425/2023090; EA-22-108 NL-23-0217, License Amendment Request to Revise Technical Specification Surveillance Requirement 3.4.14.1 and Proposed Inservice Testing Alternative ALT-VR-022023-05-0101 May 2023 License Amendment Request to Revise Technical Specification Surveillance Requirement 3.4.14.1 and Proposed Inservice Testing Alternative ALT-VR-02 NL-23-0330, Core Operating Limits Report, Cycle 25, Version 12023-04-26026 April 2023 Core Operating Limits Report, Cycle 25, Version 1 NL-23-0310, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20222023-04-25025 April 2023 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2022 NL-23-0135, License Amendment Request: Timing of Technical Specifications Effectiveness Prior to Initial Criticality (LAR-23-005)2023-04-17017 April 2023 License Amendment Request: Timing of Technical Specifications Effectiveness Prior to Initial Criticality (LAR-23-005) NL-23-0019, GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2023-04-12012 April 2023 GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI NL-23-0152, License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-144832023-04-11011 April 2023 License Amendment Request: Technical Specification Revision to Adopt TSTF-339-A, Relocate Technical Specification Parameters to the COLR Consistent with WCAP-14483 NL-23-0263, Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report2023-04-0505 April 2023 Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report NL-23-0136, License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006)2023-04-0505 April 2023 License Amendment Request: More Restrictive Action for Technical Specification 3.1.9 (LAR-23-006) NL-23-0132, License Amendment Request: Remove Combined License Appendix C (LAR 23-001)2023-04-0404 April 2023 License Amendment Request: Remove Combined License Appendix C (LAR 23-001) NL-23-0014, Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding2023-03-29029 March 2023 Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding NL-23-0208, Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update2023-03-29029 March 2023 Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update NL-23-0193, Request for License Amendment: Relocation of TS 3.7.9, Spent Fuel Pool Makeup Water Sources (LAR-23-003)2023-03-24024 March 2023 Request for License Amendment: Relocation of TS 3.7.9, Spent Fuel Pool Makeup Water Sources (LAR-23-003) NL-23-0196, Response to Request for Additional Information Regarding License Amendment Request for Alternative Source Term, TSTF-51, TSTF-471, and TSTF-4902023-03-24024 March 2023 Response to Request for Additional Information Regarding License Amendment Request for Alternative Source Term, TSTF-51, TSTF-471, and TSTF-490 NL-23-0228, Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21)2023-03-20020 March 2023 Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21) NL-22-0977, License Amendment Request to Modify Technical Specification 5.5.11.c Acceptance Criteria for Charcoal Filter Testing2023-02-0909 February 2023 License Amendment Request to Modify Technical Specification 5.5.11.c Acceptance Criteria for Charcoal Filter Testing NL-23-0010, Response to Request for Additional Information Regarding License Amendment Request for Alternative Source Term, TSTF-51, TSTF-471, and TSTF-4902023-02-0606 February 2023 Response to Request for Additional Information Regarding License Amendment Request for Alternative Source Term, TSTF-51, TSTF-471, and TSTF-490 NL-23-0076, Exigent License Amendment Request: Technical Specification Exceptions for In-containment Refueling Water Storage Tank Operability Prior to Initial Criticality (LAR-23-004)2023-01-31031 January 2023 Exigent License Amendment Request: Technical Specification Exceptions for In-containment Refueling Water Storage Tank Operability Prior to Initial Criticality (LAR-23-004) NL-23-0013, Response to Request for Additional Information Related to 10CFR 50.75 Decommissioning Funding Assurance Requirements2023-01-30030 January 2023 Response to Request for Additional Information Related to 10CFR 50.75 Decommissioning Funding Assurance Requirements NL-23-0068, Responses to NRC Request for Additional Information Related to the Refueling Outage 2R22 Steam Generator Tube Inspection Report2023-01-27027 January 2023 Responses to NRC Request for Additional Information Related to the Refueling Outage 2R22 Steam Generator Tube Inspection Report NL-23-0012, Post-Audit Supplement to License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel2023-01-20020 January 2023 Post-Audit Supplement to License Amendment Request and Exemptions to Allow Use of Lead Test Assemblies for Accident-Tolerant Fuel 2024-01-29
[Table view] Category:Report
MONTHYEARML23325A2022024-01-16016 January 2024 CFR Part 52 Construction Lessons-Learned Report NL-23-0926, Correction of Technical Specification Typographical Error2024-01-12012 January 2024 Correction of Technical Specification Typographical Error ML24004A2192024-01-0808 January 2024 Construction Reactor Oversight Process Performance Metric Report for Calendar Year 2023 ND-23-0025, Compliance with Order EA-12-0492023-08-21021 August 2023 Compliance with Order EA-12-049 ML22348A0932023-07-28028 July 2023 Finding That the Acceptance Criteria in the Combined License Are Met ML22348A0882023-07-25025 July 2023 VEGP Unit 4 - 103g - Basis Document ML23184A0472023-07-0303 July 2023 Dashboard Report 7-3-2023 ML23156A1882023-06-0505 June 2023 Construction Reactor Oversight Process Resources Report June 5, 2023 ML23121A0392023-05-0101 May 2023 Dashboard Report 5-1-2023 ML23003A0412023-01-0303 January 2023 Construction Reactor Oversight Process Resources Report January 3, 2023 ND-22-0817, Enclosures 1 and 2: Proposed Alternative Inspection Requirements for Steam Generator Nozzle to Reactor Coolant Pump Casing Welds and Alternative for Use of Code Case 648-2 for Inservice Inspection2022-11-0404 November 2022 Enclosures 1 and 2: Proposed Alternative Inspection Requirements for Steam Generator Nozzle to Reactor Coolant Pump Casing Welds and Alternative for Use of Code Case 648-2 for Inservice Inspection ND-22-0831, (Vegp), Units 3 and 4, Comments on AP1000 Standard Technical Specifications (STS) Draft NUREG-2194, Revision 12022-10-31031 October 2022 (Vegp), Units 3 and 4, Comments on AP1000 Standard Technical Specifications (STS) Draft NUREG-2194, Revision 1 ML22278A0382022-10-0505 October 2022 Dashboard Report 10-5-2022 ML22215A0962022-08-0303 August 2022 Construction Reactor Oversight Process Resources Report August 3, 2022 ML22214A0072022-08-0101 August 2022 Archives ML20290A2762022-08-0101 August 2022 10CFR52.103(g) Basis Document NL-22-0510, Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20212022-07-14014 July 2022 Plants Units 1 and 2, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2021 ML22179A1462022-06-15015 June 2022 Tier 1, Revision 10, Updated Through 04/22/2022 ML22159A1712022-06-0808 June 2022 Construction Reactor Oversight Process Resources Report June 8, 2022 ML22131A0502022-05-11011 May 2022 Construction Reactor Oversight Process Resources Report May 11, 2022 ML22089A0412022-03-30030 March 2022 Construction Reactor Oversight Process Resources Report March 30 2022 ND-22-0003, Report of 10 CFR 50.59 Changes, Tests, and Experiments and 10 CFR 52 Appendix D Departure Report2022-01-0606 January 2022 Report of 10 CFR 50.59 Changes, Tests, and Experiments and 10 CFR 52 Appendix D Departure Report ND-21-1003, Request for Exemption: Applicability of 10 CFR 26.3. Scope, Until Initial Fuel Load - Supplement2021-11-12012 November 2021 Request for Exemption: Applicability of 10 CFR 26.3. Scope, Until Initial Fuel Load - Supplement ND-21-0991, Exemption Request: Applicability of 10 CFR 26.3, Scope, Until Initial Fuel Load2021-11-0505 November 2021 Exemption Request: Applicability of 10 CFR 26.3, Scope, Until Initial Fuel Load ML21280A3042021-10-0707 October 2021 Q 2020 Performance Summary ML21280A3052021-10-0707 October 2021 Q/2020 Performance Summary ML21277A0762021-10-0404 October 2021 Vog 4 Dashboard 10-4-2021 ND-21-0848, Enclosure - Unit 4 Operator Candidates Requesting Credit for Unit 3 Written Examination and Operating Test (Revised)2021-10-0101 October 2021 Enclosure - Unit 4 Operator Candidates Requesting Credit for Unit 3 Written Examination and Operating Test (Revised) IR 05000424/20210052021-08-25025 August 2021 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 and 2 (Report 05000424/2021005 and 05000425/2021005) ND-21-0603, Electrical Construction and Measuring & Test Equipment Control2021-06-25025 June 2021 Electrical Construction and Measuring & Test Equipment Control ML21179A0972021-06-15015 June 2021 to Tier 1 ML21132A0482021-05-12012 May 2021 Construction Reactor Oversight Process Resources Report May 2021 ML21118A1162021-04-28028 April 2021 Emergency Response Data System (ERDS) Data Point Library for Vogtle Unit 3 ND-21-0342, Emergency Response Data System (ERDS) Data Point Library for Vogtie Unit 42021-04-28028 April 2021 Emergency Response Data System (ERDS) Data Point Library for Vogtie Unit 4 ML21090A2092021-03-31031 March 2021 Construction Reactor Oversight Process Resources Report March 2021 ML21040A1672021-02-0909 February 2021 (Vegp), Units 3 and 4, Revision to Westinghouse Non-Proprietary Technical Description of the Flaw Tolerance Evaluation Conducted on the Subject Weldolet Branch Connections ML20358A1822020-12-31031 December 2020 LTR-SDA-20-096-NP, Revision 1, Flaw Tolerance Evaluation to Assess Lack of Inspection Coverage of AP1000 14 X 4 Stainless Steel Weldolets to Pipe Welds ML20343A0672020-12-0202 December 2020 Dashboard Report 12-2-2020 ML20314A0492020-11-0909 November 2020 Construction Reactor Oversight Process Resources November 2020 ND-20-1220, Report of Changes Incorporated Into Revision 6 to the Security Plan, Training and Qualification Plan, and Safeguards Contingencv Plan2020-10-21021 October 2020 Report of Changes Incorporated Into Revision 6 to the Security Plan, Training and Qualification Plan, and Safeguards Contingencv Plan ML20287A1862020-10-13013 October 2020 Construction Reactor Oversight Process Resources October 2020 ML20274A2582020-09-10010 September 2020 Wp on Uswc for AP1000_Revised, Reactor Oversight Process Whitepaper - Modification of the Description of Unplanned Scrams with Complications Performance Indicator to Reflect AP1000 Design ML20191A3832020-08-14014 August 2020 Transition to Reactor Oversight Process for Vogtle Electric Generating Plant, Units 3 and 4 ND-20-0907, Revision to Proposed Alternative Requirements for Preservice Inspection Acceptance of Volumetric Examinations, in Accordance with 10 CFR 50.551(z)(1),(VEGP 3&4-PSI/ISI-ALT-14R1)2020-07-28028 July 2020 Revision to Proposed Alternative Requirements for Preservice Inspection Acceptance of Volumetric Examinations, in Accordance with 10 CFR 50.551(z)(1),(VEGP 3&4-PSI/ISI-ALT-14R1) ND-20-0561, Submittal of Turbine Maintenance and Inspection Program in Accordance with Updated Final Safety Analysis Report2020-07-10010 July 2020 Submittal of Turbine Maintenance and Inspection Program in Accordance with Updated Final Safety Analysis Report ML20189A4292020-07-0707 July 2020 Construction Reactor Oversight Process Resources July 2020 ML20136A4562020-04-30030 April 2020 Updated Flex Plan Nuclear Regulatory Commission Order EA-12-049 Strategies for Beyond Design Basis External Events NL-19-0832, EPRI Technical Report 3002014590, Technical Bases for Inspection Requirements for PWR Steam Generator Feedwater and Main Steam Nozzle-to-Shell Welds and Nozzle Inside Radius Sections.2019-12-31031 December 2019 EPRI Technical Report 3002014590, Technical Bases for Inspection Requirements for PWR Steam Generator Feedwater and Main Steam Nozzle-to-Shell Welds and Nozzle Inside Radius Sections. ML19284B3722019-11-15015 November 2019 Attachment - VEGP U3 Amendment 166 (LAR-19-008) NL-19-0674, Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 12019-09-30030 September 2019 Proposed Alternative to Use ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 2024-01-08
[Table view] Category:Miscellaneous
MONTHYEARNL-23-0926, Correction of Technical Specification Typographical Error2024-01-12012 January 2024 Correction of Technical Specification Typographical Error ML22348A0932023-07-28028 July 2023 Finding That the Acceptance Criteria in the Combined License Are Met ML23184A0472023-07-0303 July 2023 Dashboard Report 7-3-2023 ND-22-0831, (Vegp), Units 3 and 4, Comments on AP1000 Standard Technical Specifications (STS) Draft NUREG-2194, Revision 12022-10-31031 October 2022 (Vegp), Units 3 and 4, Comments on AP1000 Standard Technical Specifications (STS) Draft NUREG-2194, Revision 1 ML22215A0962022-08-0303 August 2022 Construction Reactor Oversight Process Resources Report August 3, 2022 ML22214A0072022-08-0101 August 2022 Archives ML22131A0502022-05-11011 May 2022 Construction Reactor Oversight Process Resources Report May 11, 2022 ND-21-1003, Request for Exemption: Applicability of 10 CFR 26.3. Scope, Until Initial Fuel Load - Supplement2021-11-12012 November 2021 Request for Exemption: Applicability of 10 CFR 26.3. Scope, Until Initial Fuel Load - Supplement ND-21-0991, Exemption Request: Applicability of 10 CFR 26.3, Scope, Until Initial Fuel Load2021-11-0505 November 2021 Exemption Request: Applicability of 10 CFR 26.3, Scope, Until Initial Fuel Load ML21280A3052021-10-0707 October 2021 Q/2020 Performance Summary ML21280A3042021-10-0707 October 2021 Q 2020 Performance Summary IR 05000424/20210052021-08-25025 August 2021 Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 and 2 (Report 05000424/2021005 and 05000425/2021005) ND-21-0603, Electrical Construction and Measuring & Test Equipment Control2021-06-25025 June 2021 Electrical Construction and Measuring & Test Equipment Control ML20343A0672020-12-0202 December 2020 Dashboard Report 12-2-2020 ML20314A0492020-11-0909 November 2020 Construction Reactor Oversight Process Resources November 2020 ML20287A1862020-10-13013 October 2020 Construction Reactor Oversight Process Resources October 2020 ML20191A3832020-08-14014 August 2020 Transition to Reactor Oversight Process for Vogtle Electric Generating Plant, Units 3 and 4 ND-20-0907, Revision to Proposed Alternative Requirements for Preservice Inspection Acceptance of Volumetric Examinations, in Accordance with 10 CFR 50.551(z)(1),(VEGP 3&4-PSI/ISI-ALT-14R1)2020-07-28028 July 2020 Revision to Proposed Alternative Requirements for Preservice Inspection Acceptance of Volumetric Examinations, in Accordance with 10 CFR 50.551(z)(1),(VEGP 3&4-PSI/ISI-ALT-14R1) ML19284B3722019-11-15015 November 2019 Attachment - VEGP U3 Amendment 166 (LAR-19-008) ND-18-1500, CFR 50.46 Thirty Day Report2018-12-18018 December 2018 CFR 50.46 Thirty Day Report ML18152B7852018-10-12012 October 2018 Summary of Nuclear Regulatory Commission Vendor Inspections Affecting Inspections, Tests, Analyses, and Acceptance Criteria ND-18-1047, Enclosure 2 - Redacted COL Operational Programs and Other License Conditions Implementation Schedule2018-08-0808 August 2018 Enclosure 2 - Redacted COL Operational Programs and Other License Conditions Implementation Schedule NL-18-0670, Third 10-Year Interval Inservice Inspection Program ISI Program Update: Notification of Impractical ASME Code Requirements2018-05-24024 May 2018 Third 10-Year Interval Inservice Inspection Program ISI Program Update: Notification of Impractical ASME Code Requirements NL-17-1889, NEI 12-06, Appendix H, Revision 4, H.4.5 Path 5: GMRS Greater than 2 X SSE, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information2017-12-0505 December 2017 NEI 12-06, Appendix H, Revision 4, H.4.5 Path 5: GMRS Greater than 2 X SSE, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information NL-17-0777, Flooding Focused Evaluation Summary Report2017-06-30030 June 2017 Flooding Focused Evaluation Summary Report NL-17-0218, Fukushima Near-Term Task Force Recommendation 2.1: Seismic Probabilistic Risk Assessment2017-03-27027 March 2017 Fukushima Near-Term Task Force Recommendation 2.1: Seismic Probabilistic Risk Assessment NL-15-2276, Submittal of 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20142015-12-23023 December 2015 Submittal of 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2014 ML15106A3102015-04-17017 April 2015 April 22, 2015, Meeting with Southern Nuclear Company, Draft Minimum Shift Staffing Analysis ND-14-2009, 4 - 10 CFR 26.719(c) Report: False Negative Results for a Blind Performance Test Sample2014-12-17017 December 2014 4 - 10 CFR 26.719(c) Report: False Negative Results for a Blind Performance Test Sample NL-14-1899, Vogle, Units 1 and 2 - 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20132014-12-0808 December 2014 Vogle, Units 1 and 2 - 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2013 ML14279A3522014-11-0606 November 2014 Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation ML14169A5992014-06-30030 June 2014 Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant Accident ML14049A3542014-02-24024 February 2014 Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident ML13162A5342013-06-10010 June 2013 Initial Exam 2013-301 Final SRO Written Exam NL-13-0173, Southern Nuclear Operating Company'S Overall Integrated Plan in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order EA-12-051)2013-02-27027 February 2013 Southern Nuclear Operating Company'S Overall Integrated Plan in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) NL-12-0324, Special Report 2011-001-02, Inoperable Radiation Monitor 1RE-00062012-02-16016 February 2012 Special Report 2011-001-02, Inoperable Radiation Monitor 1RE-0006 NL-11-0626, Special Report 2011-001-00, Inoperable Radiation Monitor 1RE-0062011-03-29029 March 2011 Special Report 2011-001-00, Inoperable Radiation Monitor 1RE-006 NL-10-1536, Special Report 2010-001-00, Inoperable Radiation Monitor 1RE-0062010-08-18018 August 2010 Special Report 2010-001-00, Inoperable Radiation Monitor 1RE-006 ML1015903342010-06-0808 June 2010 Audit of Steam Generator H Amendment Reference Documents ML1019304172010-05-0606 May 2010 Tritium Database Report ML1012704392010-05-0505 May 2010 Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants NL-09-1449, Submittal of Emergency Response Data System (Eros) Data Point Library Modification2009-09-24024 September 2009 Submittal of Emergency Response Data System (Eros) Data Point Library Modification NL-09-1375, Enclosure 2 and 3 to NL-09-1375 - Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification (TS) Sections 5.5.9 and TS 5.6.102009-08-25025 August 2009 Enclosure 2 and 3 to NL-09-1375 - Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification (TS) Sections 5.5.9 and TS 5.6.10 NL-08-1405, Report of Unsatisfactory Performance Testing2008-09-12012 September 2008 Report of Unsatisfactory Performance Testing NL-08-0343, Response to NRC Request for Additional Information Relating to LTR-CDME-08-11 NP-Attachment2008-03-18018 March 2008 Response to NRC Request for Additional Information Relating to LTR-CDME-08-11 NP-Attachment NL-07-1777, Supplemental Response to NRC Generic Letter 2004-022008-02-28028 February 2008 Supplemental Response to NRC Generic Letter 2004-02 NL-08-0275, Response to 01/28/2008 Request for Additional Information2008-02-27027 February 2008 Response to 01/28/2008 Request for Additional Information ML0732405912007-11-0505 November 2007 Land Management Plan ML0732407392007-11-0505 November 2007 Stratigraphy and Depositional Environments of Sediments from Five Cores from Screven and Burke Counties, Georgia ML0732403812007-11-0505 November 2007 10 CFR 50.75(g) Leak/Spill Decommissioning Record, Figure 1, for 1980s and 1990s, NMP-EN-002, Version 1.0 2024-01-12
[Table view] |
Text
A Southern Nuclear Justin T. Wheat Nuclear Licensing Manager 40 Inverness Center Parkway Post Office Box 1295 Birmingham, AL 35242 205 992 5998 tel 205 992 7601 fax December 5, 2017 jtwheat@southernco.com Docket Nos: 50-424 NL-17-1889 50-425 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Vogtle Electric Generating Plant - Units 1 and 2 NEI 12-06, Appendix H, Revision 4, H.4.5 Path 5: GMRS > 2 X SSE, Mitigating Strategies Assessment (MSA) report for the New Seismic Hazard Information
References:
- 1. NEI 12-06, Revision 4, Diverse and Flexible Coping Strategies (FLEX) Implementation Guide, December 2016 (ML16354B421 ).
- 2. JLD-ISG-2012-01, Revision 2, Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigating Strategies for Beyond-Design-Basis External Events, February 2017 (ML17005A188).
- 3. Letter to NRC, "Vogtle Electric Generating Plant- Units 1 and 2, Seismic Hazard and Screening Report for CEUS Sites," dated March 31, 2014 (ML14092A019).
- 4. Letter to NRC, "Vogtle Electric Generating Plant- Units 1 and 2, Fukushima Near-Term Task Force Recommendation 2.1: Seismic, Seismic Probabilistic Risk Assessment," dated March 27, 2017 {ML17088A130).
- 5. NRC Letter, "Vogtle Electric Generating Plant, Units 1 and 2 - Staff Assessment of Information provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54{f), Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima DAI-ICHI Accident," dated April 20, 2015
{ML15054A296).
- 6. EPRI, "Seismic Evaluation Guidance: Screening, Prioritization and Implementation Details
{SPID) for the Resolution of Fukushima Near-Term Task Force Recommendation 2.1:
Seismic", Report Number 1025287, Palo Alto, CA, November 2012.
- 7. Letter to NRC, "Vogtle Electric Generating Plant- Units 1 and 2- Spent Fuel Pool Evaluation Submittal Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated October 31, 2017, {ML17304B382).
- 8. Letter to NRC, "Vogtle Electric Generating Plant, Units 1 and 2 - Notification of Full Compliance of Required Action for NRC Order EA-12-049, Mitigation Strategies of Beyond-Design-Basis External Events," dated May 23, 2016 {ML16146A607).
- 9. NRC Letter, Vogtle Electric Generating Plant, Units 1 and 2- Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051," dated November 14,2016 {ML16301A419).
U.S. Nuclear Regulatory Commission NL-17-1889 Page2
- 10. Vogtle Electric Generating Plant Units 1 and 2, "Final Integrated Plan, U.S. Nuclear Regulatory Commission Order EA-12-049, Strategies for Beyond Design Basis External Events", Version 1 dated October 2017.
Ladies and Gentlemen:
The purpose of this letter is to provide the results of the assessment for Vogtle Electric Generating Plant - Units 1 and 2 (VEGP) to demonstrate that Seismic Probabilistic Risk Assessment (SPRA) based alternate mitigating strategy (AMS) can be implemented considering the impacts of the reevaluated seismic hazard. The assessment was performed in accordance with the guidance provided in Appendix H Section H.4.3.5 of NEI12-06 Revision 4 (Reference 1) which was endorsed by Revision 2 to JLD-ISG-2012-01 (Reference 2). Formal NRC endorsement is pending review, thus SNC is taking an exception to the formally endorsed Revision 2 of NEI 12-06 to incorporate the elements of NEI 12-06 Revision 4 Appendix H.
The Mitigating Strategies Seismic Hazard Information (MSSHI) is the licensee's reevaluated seismic hazard information at VEGP, developed using Probabilistic Seismic Hazard Analysis (PSHA). In response to the NRC's Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 2012, VEGP submitted the reevaluated seismic hazard information including the UHRS, GMRS and the hazard curves to the NRC on March 31, 2014 (Reference 3). The NRC staff concluded that the MSSHI that was submitted adequately characterizes the reevaluated seismic hazard for the site (Reference 5). Further, VEGP submitted the SPRA to the NRC on March 27, 2017 (Reference 4).
Based upon the mitigating strategies assessment in the Enclosure the mitigating strategies for VEGP considering the impacts of the reevaluated seismic hazard can be implemented as designed.
This letter contains no new Regulatory Commitments and no revision to existing Regulatory Commitments. If you have any questions, please contact Matt Euten at 205.992.7673.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 5th day of December 2017.
Respectfully submitted,
~~(.~
Jus~ heat Nuclear Licensing Manager Southern Nuclear Operating Company J1W/MRE/GLS
Enclosure:
NEI12-06 Appendix H Path 5 Seismic MSA Report for VEGP- Units 1 and 2
U.S. Nuclear Regulatory Commission NL-17-1889 Page 3 cc: Regional Administrator, Region II NRR Project Manager- Vogtle 1 & 2 Senior Resident Inspector- Vogtle 1 & 2 State of Georgia Environmental Protection Division RType: CVC7000
Vogtle Electric Generating Plant- Units 1 and 2 NEI12-06, Rev 4, Appendix H, H.4.5, Path 5: GMRS > 2xSSE Mitigating Strategies Assessment (MSA) Seismic Enclosure NEI 12-06 Appendix H Path 5 Seismic MSA Report for VEGP - Units 1 and 2 (2 pages)
NEI 12-06 Appendix H Path 5 Seismic MSA Report for VEGP - Units 1 and 2 Enclosure to NL-17-1889 Mitigating Strategies Assessment The purpose of this Mitigating Strategies Assessment is to evaluate and demonstrate that Vogtle Electric Generating Plant Units 1 and 2 (VEGP) can mitigate the effects of the reevaluated seismic hazard information developed pursuant to the NRC's 10 CFR 50.54(f) letter dated March 12, 2012.
The assessment was performed in accordance with the guidance provided in Reference 1.
Reference 1 discusses a method to develop an alternate mitigating strategy (AMS) to address the mitigating strategies seismic hazard information (MSSHI). Reference 2 provides an NRC staff position that the method described in Section H.4.5 of Reference 1 for an AMS is acceptable for mitigating a beyond-design-basis external event.
The risk-informed assessment described in H.4.5.3 of Reference 1 uses the SPRA to address the impacts of the MSSHI on the plant. Consistent with Section H.4.5.3 of Reference 1, the VEGP base SPRA (Reference 4) has been submitted to NRC for review and has been peer reviewed in accordance with the expectations set forth in Reference 6.
The results of the SPRA for VEGP are: 2.8x1 o-6/yr. seismic core damage frequency (SCDF) and 3.3x10-7/yr. seismic large early release frequency (SLERF). These results are less than 5x1o-5/yr.
SCDF and 5x1 o-6/yr. SLERF, therefore in accordance with H.4.5.3, the base SPRA results demonstrate that mitigating strategies are reasonably protected for the MSSHI and an evaluation under H.4.5.2, H.4.5.4, or H.4.5.5 is not required.
Spent Fuel Pool Cooling Evaluation The evaluation of spent fuel pool (SFP) cooling for VEGP was performed based on the initial conditions established in NEI 12-06 for SFP cooling coping in the event of an Extended Loss of A/C Power (ELAP) I Loss of normal access to the Ultimate Heat Sink (LUHS). The evaluation also used the results of pool heat up analyses from the ELAP evaluation as input.
For Phase 1 SFP cooling, VEGP credits the large inventory and heat capacity of the water in the SFP. Following the loss of SFP cooling, the SFP will slowly heat up and eventually begin to boil.
Using the most limiting non-outage, normal decay heat load and SFP starting temperature, the SFP would begin to boil in approximately 14.14 hours1.62037e-4 days <br />0.00389 hours <br />2.314815e-5 weeks <br />5.327e-6 months <br /> after the loss of SFP cooling with the level reaching 15 feet above the fuel in approximately 55.21 hours2.430556e-4 days <br />0.00583 hours <br />3.472222e-5 weeks <br />7.9905e-6 months <br />. The VEGP initial coping strategy for SFP cooling is to allow evaporative cooling of the SFP while monitoring SFP level using instrumentation installed as required by NRC Order EA-12-051.
For Phase 2 SFP cooling, VEGP has developed three baseline SFP cooling strategies, but the first method relies on using a flexible hose directly from the discharge of the portable pump to the pool so no discussion of the other two strategies are included in this assessment. The hoses will be deployed inside the fuel handling building prior to the SFP reaching 200"F in order to minimize the need for personnel access to the SFP area, which may have degraded environmental conditions during an ELAP.
The permanently installed plant equipment relied on for the implementation of the SFP Cooling FLEX strategy has been designed and installed, or evaluated to remain functional, in accordance E-1
NEI 12-06 Appendix H Path 5 Seismic MSA Report for VEGP- Units 1 and 2 Enclosure to NL-17-1889 with the plant design basis to the SSE loading conditions. The spent fuel pool integrity evaluations demonstrated inherent margins of the spent fuel pool structure and interfacing plant equipment above the SSE to the GMRS level (Reference 7).
The NRC has issued their Safety Evaluation of the VEGP Final Integrated Plan (FIP) (Reference 9) and concluded that VEGP has developed guidance that if implemented appropriately should maintain or restore SFP cooling following an ELAP consistent with NEI 12-06 guidance as endorsed by JLD-ISG-2012-01, and should adequately address the requirements of the order. A subsequent revision of the VEGP FIP (Reference 10) did not change the SFP cooling strategy and did not require NRC prior approval.
Conclusion The mitigating strategies for VEGP Units 1 and 2 considering the impacts of the reevaluated seismic hazard can be implemented as designed.
E-2
Text
A Southern Nuclear Justin T. Wheat Nuclear Licensing Manager 40 Inverness Center Parkway Post Office Box 1295 Birmingham, AL 35242 205 992 5998 tel 205 992 7601 fax December 5, 2017 jtwheat@southernco.com Docket Nos: 50-424 NL-17-1889 50-425 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Vogtle Electric Generating Plant - Units 1 and 2 NEI 12-06, Appendix H, Revision 4, H.4.5 Path 5: GMRS > 2 X SSE, Mitigating Strategies Assessment (MSA) report for the New Seismic Hazard Information
References:
- 1. NEI 12-06, Revision 4, Diverse and Flexible Coping Strategies (FLEX) Implementation Guide, December 2016 (ML16354B421 ).
- 2. JLD-ISG-2012-01, Revision 2, Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigating Strategies for Beyond-Design-Basis External Events, February 2017 (ML17005A188).
- 3. Letter to NRC, "Vogtle Electric Generating Plant- Units 1 and 2, Seismic Hazard and Screening Report for CEUS Sites," dated March 31, 2014 (ML14092A019).
- 4. Letter to NRC, "Vogtle Electric Generating Plant- Units 1 and 2, Fukushima Near-Term Task Force Recommendation 2.1: Seismic, Seismic Probabilistic Risk Assessment," dated March 27, 2017 {ML17088A130).
- 5. NRC Letter, "Vogtle Electric Generating Plant, Units 1 and 2 - Staff Assessment of Information provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54{f), Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima DAI-ICHI Accident," dated April 20, 2015
{ML15054A296).
- 6. EPRI, "Seismic Evaluation Guidance: Screening, Prioritization and Implementation Details
{SPID) for the Resolution of Fukushima Near-Term Task Force Recommendation 2.1:
Seismic", Report Number 1025287, Palo Alto, CA, November 2012.
- 7. Letter to NRC, "Vogtle Electric Generating Plant- Units 1 and 2- Spent Fuel Pool Evaluation Submittal Report, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated October 31, 2017, {ML17304B382).
- 8. Letter to NRC, "Vogtle Electric Generating Plant, Units 1 and 2 - Notification of Full Compliance of Required Action for NRC Order EA-12-049, Mitigation Strategies of Beyond-Design-Basis External Events," dated May 23, 2016 {ML16146A607).
- 9. NRC Letter, Vogtle Electric Generating Plant, Units 1 and 2- Safety Evaluation Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051," dated November 14,2016 {ML16301A419).
U.S. Nuclear Regulatory Commission NL-17-1889 Page2
- 10. Vogtle Electric Generating Plant Units 1 and 2, "Final Integrated Plan, U.S. Nuclear Regulatory Commission Order EA-12-049, Strategies for Beyond Design Basis External Events", Version 1 dated October 2017.
Ladies and Gentlemen:
The purpose of this letter is to provide the results of the assessment for Vogtle Electric Generating Plant - Units 1 and 2 (VEGP) to demonstrate that Seismic Probabilistic Risk Assessment (SPRA) based alternate mitigating strategy (AMS) can be implemented considering the impacts of the reevaluated seismic hazard. The assessment was performed in accordance with the guidance provided in Appendix H Section H.4.3.5 of NEI12-06 Revision 4 (Reference 1) which was endorsed by Revision 2 to JLD-ISG-2012-01 (Reference 2). Formal NRC endorsement is pending review, thus SNC is taking an exception to the formally endorsed Revision 2 of NEI 12-06 to incorporate the elements of NEI 12-06 Revision 4 Appendix H.
The Mitigating Strategies Seismic Hazard Information (MSSHI) is the licensee's reevaluated seismic hazard information at VEGP, developed using Probabilistic Seismic Hazard Analysis (PSHA). In response to the NRC's Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident, dated March 12, 2012, VEGP submitted the reevaluated seismic hazard information including the UHRS, GMRS and the hazard curves to the NRC on March 31, 2014 (Reference 3). The NRC staff concluded that the MSSHI that was submitted adequately characterizes the reevaluated seismic hazard for the site (Reference 5). Further, VEGP submitted the SPRA to the NRC on March 27, 2017 (Reference 4).
Based upon the mitigating strategies assessment in the Enclosure the mitigating strategies for VEGP considering the impacts of the reevaluated seismic hazard can be implemented as designed.
This letter contains no new Regulatory Commitments and no revision to existing Regulatory Commitments. If you have any questions, please contact Matt Euten at 205.992.7673.
I declare under penalty of perjury that the foregoing is true and correct. Executed on the 5th day of December 2017.
Respectfully submitted,
~~(.~
Jus~ heat Nuclear Licensing Manager Southern Nuclear Operating Company J1W/MRE/GLS
Enclosure:
NEI12-06 Appendix H Path 5 Seismic MSA Report for VEGP- Units 1 and 2
U.S. Nuclear Regulatory Commission NL-17-1889 Page 3 cc: Regional Administrator, Region II NRR Project Manager- Vogtle 1 & 2 Senior Resident Inspector- Vogtle 1 & 2 State of Georgia Environmental Protection Division RType: CVC7000
Vogtle Electric Generating Plant- Units 1 and 2 NEI12-06, Rev 4, Appendix H, H.4.5, Path 5: GMRS > 2xSSE Mitigating Strategies Assessment (MSA) Seismic Enclosure NEI 12-06 Appendix H Path 5 Seismic MSA Report for VEGP - Units 1 and 2 (2 pages)
NEI 12-06 Appendix H Path 5 Seismic MSA Report for VEGP - Units 1 and 2 Enclosure to NL-17-1889 Mitigating Strategies Assessment The purpose of this Mitigating Strategies Assessment is to evaluate and demonstrate that Vogtle Electric Generating Plant Units 1 and 2 (VEGP) can mitigate the effects of the reevaluated seismic hazard information developed pursuant to the NRC's 10 CFR 50.54(f) letter dated March 12, 2012.
The assessment was performed in accordance with the guidance provided in Reference 1.
Reference 1 discusses a method to develop an alternate mitigating strategy (AMS) to address the mitigating strategies seismic hazard information (MSSHI). Reference 2 provides an NRC staff position that the method described in Section H.4.5 of Reference 1 for an AMS is acceptable for mitigating a beyond-design-basis external event.
The risk-informed assessment described in H.4.5.3 of Reference 1 uses the SPRA to address the impacts of the MSSHI on the plant. Consistent with Section H.4.5.3 of Reference 1, the VEGP base SPRA (Reference 4) has been submitted to NRC for review and has been peer reviewed in accordance with the expectations set forth in Reference 6.
The results of the SPRA for VEGP are: 2.8x1 o-6/yr. seismic core damage frequency (SCDF) and 3.3x10-7/yr. seismic large early release frequency (SLERF). These results are less than 5x1o-5/yr.
SCDF and 5x1 o-6/yr. SLERF, therefore in accordance with H.4.5.3, the base SPRA results demonstrate that mitigating strategies are reasonably protected for the MSSHI and an evaluation under H.4.5.2, H.4.5.4, or H.4.5.5 is not required.
Spent Fuel Pool Cooling Evaluation The evaluation of spent fuel pool (SFP) cooling for VEGP was performed based on the initial conditions established in NEI 12-06 for SFP cooling coping in the event of an Extended Loss of A/C Power (ELAP) I Loss of normal access to the Ultimate Heat Sink (LUHS). The evaluation also used the results of pool heat up analyses from the ELAP evaluation as input.
For Phase 1 SFP cooling, VEGP credits the large inventory and heat capacity of the water in the SFP. Following the loss of SFP cooling, the SFP will slowly heat up and eventually begin to boil.
Using the most limiting non-outage, normal decay heat load and SFP starting temperature, the SFP would begin to boil in approximately 14.14 hours1.62037e-4 days <br />0.00389 hours <br />2.314815e-5 weeks <br />5.327e-6 months <br /> after the loss of SFP cooling with the level reaching 15 feet above the fuel in approximately 55.21 hours2.430556e-4 days <br />0.00583 hours <br />3.472222e-5 weeks <br />7.9905e-6 months <br />. The VEGP initial coping strategy for SFP cooling is to allow evaporative cooling of the SFP while monitoring SFP level using instrumentation installed as required by NRC Order EA-12-051.
For Phase 2 SFP cooling, VEGP has developed three baseline SFP cooling strategies, but the first method relies on using a flexible hose directly from the discharge of the portable pump to the pool so no discussion of the other two strategies are included in this assessment. The hoses will be deployed inside the fuel handling building prior to the SFP reaching 200"F in order to minimize the need for personnel access to the SFP area, which may have degraded environmental conditions during an ELAP.
The permanently installed plant equipment relied on for the implementation of the SFP Cooling FLEX strategy has been designed and installed, or evaluated to remain functional, in accordance E-1
NEI 12-06 Appendix H Path 5 Seismic MSA Report for VEGP- Units 1 and 2 Enclosure to NL-17-1889 with the plant design basis to the SSE loading conditions. The spent fuel pool integrity evaluations demonstrated inherent margins of the spent fuel pool structure and interfacing plant equipment above the SSE to the GMRS level (Reference 7).
The NRC has issued their Safety Evaluation of the VEGP Final Integrated Plan (FIP) (Reference 9) and concluded that VEGP has developed guidance that if implemented appropriately should maintain or restore SFP cooling following an ELAP consistent with NEI 12-06 guidance as endorsed by JLD-ISG-2012-01, and should adequately address the requirements of the order. A subsequent revision of the VEGP FIP (Reference 10) did not change the SFP cooling strategy and did not require NRC prior approval.
Conclusion The mitigating strategies for VEGP Units 1 and 2 considering the impacts of the reevaluated seismic hazard can be implemented as designed.