NL-23-0926, Correction of Technical Specification Typographical Error | 12 January 2024 | Correction of Technical Specification Typographical Error | |
ML22348A093 | 28 July 2023 | Finding That the Acceptance Criteria in the Combined License Are Met | |
ML23184A047 | 3 July 2023 | Dashboard Report 7-3-2023 | |
ND-22-0831, (Vegp), Units 3 and 4, Comments on AP1000 Standard Technical Specifications (STS) Draft NUREG-2194, Revision 1 | 31 October 2022 | (Vegp), Units 3 and 4, Comments on AP1000 Standard Technical Specifications (STS) Draft NUREG-2194, Revision 1 | Shutdown Margin Probabilistic Risk Assessment Squib |
ML22215A096 | 3 August 2022 | Construction Reactor Oversight Process Resources Report August 3, 2022 | |
ML22214A007 | 1 August 2022 | Archives | Fitness for Duty Coatings Nondestructive Examination Squib Condition Adverse to Quality Significance Determination Process Integrated leak rate test Liquid penetrant |
ML22131A050 | 11 May 2022 | Construction Reactor Oversight Process Resources Report May 11, 2022 | |
ND-21-1003, Request for Exemption: Applicability of 10 CFR 26.3. Scope, Until Initial Fuel Load - Supplement | 12 November 2021 | Request for Exemption: Applicability of 10 CFR 26.3. Scope, Until Initial Fuel Load - Supplement | Condition Adverse to Quality Exemption Request Fuel cladding |
ND-21-0991, Exemption Request: Applicability of 10 CFR 26.3, Scope, Until Initial Fuel Load | 5 November 2021 | Exemption Request: Applicability of 10 CFR 26.3, Scope, Until Initial Fuel Load | Condition Adverse to Quality Exemption Request Fuel cladding |
ML21280A305 | 7 October 2021 | Q/2020 Performance Summary | |
ML21280A304 | 7 October 2021 | Q 2020 Performance Summary | Condition Adverse to Quality Significance Determination Process Integrated leak rate test |
IR 05000424/2021005 | 25 August 2021 | Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 and 2 (Report 05000424/2021005 and 05000425/2021005) | Fitness for Duty Cyber Security Exemption Request COVID-19 |
ND-21-0603, Electrical Construction and Measuring & Test Equipment Control | 25 June 2021 | Electrical Construction and Measuring & Test Equipment Control | |
ML20343A067 | 2 December 2020 | Dashboard Report 12-2-2020 | |
ML20314A049 | 9 November 2020 | Construction Reactor Oversight Process Resources November 2020 | |
ML20287A186 | 13 October 2020 | Construction Reactor Oversight Process Resources October 2020 | |
ML20191A383 | 14 August 2020 | Transition to Reactor Oversight Process for Vogtle Electric Generating Plant, Units 3 and 4 | Enforcement Discretion Probabilistic Risk Assessment Incorporated by reference Significance Determination Process Grace period Power change |
ND-20-0907, Revision to Proposed Alternative Requirements for Preservice Inspection Acceptance of Volumetric Examinations, in Accordance with 10 CFR 50.551(z)(1),(VEGP 3&4-PSI/ISI-ALT-14R1) | 28 July 2020 | Revision to Proposed Alternative Requirements for Preservice Inspection Acceptance of Volumetric Examinations, in Accordance with 10 CFR 50.551(z)(1),(VEGP 3&4-PSI/ISI-ALT-14R1) | Non-Destructive Examination Hydrostatic Nondestructive Examination Stress corrosion cracking |
ML19284B372 | 15 November 2019 | Attachment - VEGP U3 Amendment 166 (LAR-19-008) | Fire Protection Program |
ND-18-1500, CFR 50.46 Thirty Day Report | 18 December 2018 | CFR 50.46 Thirty Day Report | |
ML18152B785 | 12 October 2018 | Summary of Nuclear Regulatory Commission Vendor Inspections Affecting Inspections, Tests, Analyses, and Acceptance Criteria | Commercial Grade Dedication Nondestructive Examination Squib Liquid penetrant |
ND-18-1047, Enclosure 2 - Redacted COL Operational Programs and Other License Conditions Implementation Schedule | 8 August 2018 | Enclosure 2 - Redacted COL Operational Programs and Other License Conditions Implementation Schedule | Hydrostatic Squib Cyber Security Flow Accelerated Corrosion Affidavit |
NL-18-0670, Third 10-Year Interval Inservice Inspection Program ISI Program Update: Notification of Impractical ASME Code Requirements | 24 May 2018 | Third 10-Year Interval Inservice Inspection Program ISI Program Update: Notification of Impractical ASME Code Requirements | Stress corrosion cracking Liquid penetrant Thermal fatigue |
NL-17-1889, NEI 12-06, Appendix H, Revision 4, H.4.5 Path 5: GMRS Greater than 2 X SSE, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information | 5 December 2017 | NEI 12-06, Appendix H, Revision 4, H.4.5 Path 5: GMRS Greater than 2 X SSE, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information | Ultimate heat sink Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Large early release frequency Spent Fuel Pool Instrumentation |
NL-17-0777, Flooding Focused Evaluation Summary Report | 30 June 2017 | Flooding Focused Evaluation Summary Report | High winds FLEX Fukushima Dai-Ichi Flooding Focused Evaluation |
NL-17-0218, Fukushima Near-Term Task Force Recommendation 2.1: Seismic Probabilistic Risk Assessment | 27 March 2017 | Fukushima Near-Term Task Force Recommendation 2.1: Seismic Probabilistic Risk Assessment | Safe Shutdown Ultimate heat sink Mission time Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment FLEX Fukushima Dai-Ichi Seismically rugged Design basis earthquake Large early release frequency Earthquake Seismic Walkdown Report |
NL-15-2276, Submittal of 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2014 | 23 December 2015 | Submittal of 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2014 | |
ML15106A310 | 17 April 2015 | April 22, 2015, Meeting with Southern Nuclear Company, Draft Minimum Shift Staffing Analysis | High Radiation Area Minimum staff |
ND-14-2009, 4 - 10 CFR 26.719(c) Report: False Negative Results for a Blind Performance Test Sample | 17 December 2014 | 4 - 10 CFR 26.719(c) Report: False Negative Results for a Blind Performance Test Sample | Fitness for Duty |
NL-14-1899, Vogle, Units 1 and 2 - 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2013 | 8 December 2014 | Vogle, Units 1 and 2 - 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2013 | |
ML14279A352 | 6 November 2014 | Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation | Ultimate heat sink Fukushima Dai-Ichi Frazil ice Earthquake |
ML14169A599 | 30 June 2014 | Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant Accident | Unanalyzed Condition Hydrostatic Operator Manual Action Fukushima Dai-Ichi Earthquake |
ML14049A354 | 24 February 2014 | Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant Accident | Safe Shutdown Unanalyzed Condition Safe Shutdown Earthquake Operating Basis Earthquake Fukushima Dai-Ichi Earthquake |
ML13162A534 | 10 June 2013 | Initial Exam 2013-301 Final SRO Written Exam | Fitness for Duty Shutdown Margin Offsite Dose Calculation Manual Stroke time Unidentified leakage Overspeed trip Potassium iodide |
NL-13-0173, Southern Nuclear Operating Company'S Overall Integrated Plan in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) | 27 February 2013 | Southern Nuclear Operating Company'S Overall Integrated Plan in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) | FLEX Spent Fuel Pool Instrumentation |
NL-12-0324, Special Report 2011-001-02, Inoperable Radiation Monitor 1RE-0006 | 16 February 2012 | Special Report 2011-001-02, Inoperable Radiation Monitor 1RE-0006 | High Radiation Area |
NL-11-0626, Special Report 2011-001-00, Inoperable Radiation Monitor 1RE-006 | 29 March 2011 | Special Report 2011-001-00, Inoperable Radiation Monitor 1RE-006 | |
NL-10-1536, Special Report 2010-001-00, Inoperable Radiation Monitor 1RE-006 | 18 August 2010 | Special Report 2010-001-00, Inoperable Radiation Monitor 1RE-006 | |
ML101590334 | 8 June 2010 | Audit of Steam Generator H Amendment Reference Documents | Finite Element Analysis |
ML101930417 | 6 May 2010 | Tritium Database Report | Offsite Dose Calculation Manual Hydrostatic |
ML101270439 | 5 May 2010 | Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants | |
NL-09-1449, Submittal of Emergency Response Data System (Eros) Data Point Library Modification | 24 September 2009 | Submittal of Emergency Response Data System (Eros) Data Point Library Modification | |
NL-09-1375, Enclosure 2 and 3 to NL-09-1375 - Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification (TS) Sections 5.5.9 and TS 5.6.10 | 25 August 2009 | Enclosure 2 and 3 to NL-09-1375 - Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification (TS) Sections 5.5.9 and TS 5.6.10 | Finite Element Analysis |
NL-08-1405, Report of Unsatisfactory Performance Testing | 12 September 2008 | Report of Unsatisfactory Performance Testing | |
NL-08-0343, Response to NRC Request for Additional Information Relating to LTR-CDME-08-11 NP-Attachment | 18 March 2008 | Response to NRC Request for Additional Information Relating to LTR-CDME-08-11 NP-Attachment | Finite Element Analysis |
NL-07-1777, Supplemental Response to NRC Generic Letter 2004-02 | 28 February 2008 | Supplemental Response to NRC Generic Letter 2004-02 | Safe Shutdown Mission time Fire Barrier Safe Shutdown Earthquake Coatings Operating Basis Earthquake Temporary Modification High Energy Line Break Foreign Material Exclusion Affidavit Manual Operator Action |
NL-08-0275, Response to 01/28/2008 Request for Additional Information | 27 February 2008 | Response to 01/28/2008 Request for Additional Information | Safe Shutdown Boric Acid Fire Barrier Hydrostatic Coatings High Energy Line Break Aging Management License Renewal |
ML073240591 | 5 November 2007 | Land Management Plan | |
ML073240739 | 5 November 2007 | Stratigraphy and Depositional Environments of Sediments from Five Cores from Screven and Burke Counties, Georgia | |
ML073240381 | 5 November 2007 | 10 CFR 50.75(g) Leak/Spill Decommissioning Record, Figure 1, for 1980s and 1990s, NMP-EN-002, Version 1.0 | |