Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
NL-23-0926, Correction of Technical Specification Typographical Error12 January 2024Correction of Technical Specification Typographical Error
ML22348A09328 July 2023Finding That the Acceptance Criteria in the Combined License Are Met
ML23184A0473 July 2023Dashboard Report 7-3-2023
ND-22-0831, (Vegp), Units 3 and 4, Comments on AP1000 Standard Technical Specifications (STS) Draft NUREG-2194, Revision 131 October 2022(Vegp), Units 3 and 4, Comments on AP1000 Standard Technical Specifications (STS) Draft NUREG-2194, Revision 1Shutdown Margin
Probabilistic Risk Assessment
Squib
ML22215A0963 August 2022Construction Reactor Oversight Process Resources Report August 3, 2022
ML22214A0071 August 2022ArchivesFitness for Duty
Coatings
Nondestructive Examination
Squib
Condition Adverse to Quality
Significance Determination Process
Integrated leak rate test
Liquid penetrant
ML22131A05011 May 2022Construction Reactor Oversight Process Resources Report May 11, 2022
ND-21-1003, Request for Exemption: Applicability of 10 CFR 26.3. Scope, Until Initial Fuel Load - Supplement12 November 2021Request for Exemption: Applicability of 10 CFR 26.3. Scope, Until Initial Fuel Load - SupplementCondition Adverse to Quality
Exemption Request
Fuel cladding
ND-21-0991, Exemption Request: Applicability of 10 CFR 26.3, Scope, Until Initial Fuel Load5 November 2021Exemption Request: Applicability of 10 CFR 26.3, Scope, Until Initial Fuel LoadCondition Adverse to Quality
Exemption Request
Fuel cladding
ML21280A3057 October 2021Q/2020 Performance Summary
ML21280A3047 October 2021Q 2020 Performance SummaryCondition Adverse to Quality
Significance Determination Process
Integrated leak rate test
IR 05000424/202100525 August 2021Updated Inspection Plan for Vogtle Electric Generating Plant, Units 1 and 2 (Report 05000424/2021005 and 05000425/2021005)Fitness for Duty
Cyber Security
Exemption Request
COVID-19
ND-21-0603, Electrical Construction and Measuring & Test Equipment Control25 June 2021Electrical Construction and Measuring & Test Equipment Control
ML20343A0672 December 2020Dashboard Report 12-2-2020
ML20314A0499 November 2020Construction Reactor Oversight Process Resources November 2020
ML20287A18613 October 2020Construction Reactor Oversight Process Resources October 2020
ML20191A38314 August 2020Transition to Reactor Oversight Process for Vogtle Electric Generating Plant, Units 3 and 4Enforcement Discretion
Probabilistic Risk Assessment
Incorporated by reference
Significance Determination Process
Grace period
Power change
ND-20-0907, Revision to Proposed Alternative Requirements for Preservice Inspection Acceptance of Volumetric Examinations, in Accordance with 10 CFR 50.551(z)(1),(VEGP 3&4-PSI/ISI-ALT-14R1)28 July 2020Revision to Proposed Alternative Requirements for Preservice Inspection Acceptance of Volumetric Examinations, in Accordance with 10 CFR 50.551(z)(1),(VEGP 3&4-PSI/ISI-ALT-14R1)Non-Destructive Examination
Hydrostatic
Nondestructive Examination
Stress corrosion cracking
ML19284B37215 November 2019Attachment - VEGP U3 Amendment 166 (LAR-19-008)Fire Protection Program
ND-18-1500, CFR 50.46 Thirty Day Report18 December 2018CFR 50.46 Thirty Day Report
ML18152B78512 October 2018Summary of Nuclear Regulatory Commission Vendor Inspections Affecting Inspections, Tests, Analyses, and Acceptance CriteriaCommercial Grade Dedication
Nondestructive Examination
Squib
Liquid penetrant
ND-18-1047, Enclosure 2 - Redacted COL Operational Programs and Other License Conditions Implementation Schedule8 August 2018Enclosure 2 - Redacted COL Operational Programs and Other License Conditions Implementation ScheduleHydrostatic
Squib
Cyber Security
Flow Accelerated Corrosion
Affidavit
NL-18-0670, Third 10-Year Interval Inservice Inspection Program ISI Program Update: Notification of Impractical ASME Code Requirements24 May 2018Third 10-Year Interval Inservice Inspection Program ISI Program Update: Notification of Impractical ASME Code RequirementsStress corrosion cracking
Liquid penetrant
Thermal fatigue
NL-17-1889, NEI 12-06, Appendix H, Revision 4, H.4.5 Path 5: GMRS Greater than 2 X SSE, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information5 December 2017NEI 12-06, Appendix H, Revision 4, H.4.5 Path 5: GMRS Greater than 2 X SSE, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard InformationUltimate heat sink
Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Large early release frequency
Spent Fuel Pool Instrumentation
NL-17-0777, Flooding Focused Evaluation Summary Report30 June 2017Flooding Focused Evaluation Summary ReportHigh winds
FLEX
Fukushima Dai-Ichi
Flooding Focused Evaluation
NL-17-0218, Fukushima Near-Term Task Force Recommendation 2.1: Seismic Probabilistic Risk Assessment27 March 2017Fukushima Near-Term Task Force Recommendation 2.1: Seismic Probabilistic Risk AssessmentSafe Shutdown
Ultimate heat sink
Mission time
Safe Shutdown Earthquake
Internal Flooding
Probabilistic Risk Assessment
FLEX
Fukushima Dai-Ichi
Seismically rugged
Design basis earthquake
Large early release frequency
Earthquake
Seismic Walkdown Report
NL-15-2276, Submittal of 10 CFR 50.46 ECCS Evaluation Model Annual Report for 201423 December 2015Submittal of 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2014
ML15106A31017 April 2015April 22, 2015, Meeting with Southern Nuclear Company, Draft Minimum Shift Staffing AnalysisHigh Radiation Area
Minimum staff
ND-14-2009, 4 - 10 CFR 26.719(c) Report: False Negative Results for a Blind Performance Test Sample17 December 20144 - 10 CFR 26.719(c) Report: False Negative Results for a Blind Performance Test SampleFitness for Duty
NL-14-1899, Vogle, Units 1 and 2 - 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20138 December 2014Vogle, Units 1 and 2 - 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2013
ML14279A3526 November 2014Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism ReevaluationUltimate heat sink
Fukushima Dai-Ichi
Frazil ice
Earthquake
ML14169A59930 June 2014Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-ichi Nuclear Power Plant AccidentUnanalyzed Condition
Hydrostatic
Operator Manual Action
Fukushima Dai-Ichi
Earthquake
ML14049A35424 February 2014Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima DAI-ICHI Nuclear Power Plant AccidentSafe Shutdown
Unanalyzed Condition
Safe Shutdown Earthquake
Operating Basis Earthquake
Fukushima Dai-Ichi
Earthquake
ML13162A53410 June 2013Initial Exam 2013-301 Final SRO Written ExamFitness for Duty
Shutdown Margin
Offsite Dose Calculation Manual
Stroke time
Unidentified leakage
Overspeed trip
Potassium iodide
NL-13-0173, Southern Nuclear Operating Company'S Overall Integrated Plan in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order EA-12-051)27 February 2013Southern Nuclear Operating Company'S Overall Integrated Plan in Response to March 12,2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order EA-12-051)FLEX
Spent Fuel Pool Instrumentation
NL-12-0324, Special Report 2011-001-02, Inoperable Radiation Monitor 1RE-000616 February 2012Special Report 2011-001-02, Inoperable Radiation Monitor 1RE-0006High Radiation Area
NL-11-0626, Special Report 2011-001-00, Inoperable Radiation Monitor 1RE-00629 March 2011Special Report 2011-001-00, Inoperable Radiation Monitor 1RE-006
NL-10-1536, Special Report 2010-001-00, Inoperable Radiation Monitor 1RE-00618 August 2010Special Report 2010-001-00, Inoperable Radiation Monitor 1RE-006
ML1015903348 June 2010Audit of Steam Generator H Amendment Reference DocumentsFinite Element Analysis
ML1019304176 May 2010Tritium Database ReportOffsite Dose Calculation Manual
Hydrostatic
ML1012704395 May 2010Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants
NL-09-1449, Submittal of Emergency Response Data System (Eros) Data Point Library Modification24 September 2009Submittal of Emergency Response Data System (Eros) Data Point Library Modification
NL-09-1375, Enclosure 2 and 3 to NL-09-1375 - Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification (TS) Sections 5.5.9 and TS 5.6.1025 August 2009Enclosure 2 and 3 to NL-09-1375 - Response to Request for Additional Information Related to License Amendment Request to Revise Technical Specification (TS) Sections 5.5.9 and TS 5.6.10Finite Element Analysis
NL-08-1405, Report of Unsatisfactory Performance Testing12 September 2008Report of Unsatisfactory Performance Testing
NL-08-0343, Response to NRC Request for Additional Information Relating to LTR-CDME-08-11 NP-Attachment18 March 2008Response to NRC Request for Additional Information Relating to LTR-CDME-08-11 NP-AttachmentFinite Element Analysis
NL-07-1777, Supplemental Response to NRC Generic Letter 2004-0228 February 2008Supplemental Response to NRC Generic Letter 2004-02Safe Shutdown
Mission time
Fire Barrier
Safe Shutdown Earthquake
Coatings
Operating Basis Earthquake
Temporary Modification
High Energy Line Break
Foreign Material Exclusion
Affidavit
Manual Operator Action
NL-08-0275, Response to 01/28/2008 Request for Additional Information27 February 2008Response to 01/28/2008 Request for Additional InformationSafe Shutdown
Boric Acid
Fire Barrier
Hydrostatic
Coatings
High Energy Line Break
Aging Management
License Renewal
ML0732405915 November 2007Land Management Plan
ML0732407395 November 2007Stratigraphy and Depositional Environments of Sediments from Five Cores from Screven and Burke Counties, Georgia
ML0732403815 November 200710 CFR 50.75(g) Leak/Spill Decommissioning Record, Figure 1, for 1980s and 1990s, NMP-EN-002, Version 1.0