Insp Repts 50-498/98-02 & 50-499/98-02 on 980112-15. Violations Noted.Major Areas Inspected:Operations & Plant Support Re Radiation Protection
ML20202D778
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 02/12/1998
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20202D766 List:
References
50-498-98-02, 50-498-98-2, 50-499-98-02, 50-499-98-2, NUDOCS 9802170174
Download: ML20202D778 (21)


See also: IR 05000498/1998002

Text

._ _ _ ___ _______-__ - _ - - - - _ _ - .

.

ENCLOSURE 2

U.S. NUCLEAR REGULATORY COMMISSION

REGION IV

Docket Nos.: 50-498; 50-499

License Nos.: NPF-78; NPF-80

Report No.: 50-498/98-02;50-499/98-02

Licensee: STP Nuclear Operating Company

Facility.' South Texas Project Electric Generating Station, Units 1 and 2

Location: FM 521 - 8 miles west of Wadsworth

Wadsworth, Texas

Oates: January 12-15,1998

Inspectors: Michael P. Shannon, Senior Radiation Specialist

Michael C. Hay, Radiation Specialist

Approved By: Blaine Murray, Chief

Plant Support Branch

Division of Reactor Safety

Attachment: Supplemental Information

9802170174 980212

PDR ADOCK 05000498

G PDR

_ _ _ _ _ _ _ _ _ _ __

-- -

.

-2-

EXECUTIVE SUMMARY

South Texas Project Electric Generating Station, Units 1 and 2

NRC Inspection neport 50-498/98-02; 50-499/98-02

'3

-

This announced, routine inspection reviewed extemal exposure controls, internal exposure

controls, dose assessment and dose records, controls of radioactive materials and

contamination, staff training and qua'ification in radiological protection programs, and radiation

protection quality assurance activities.

Ooerations

3 -

Following an airborne radiation alarm in the Unit 1 reactor containment building, control

room personnel failed to inform the health physics staff of the alarm in accordance with

management expectations (Section R1.3).

Plant Suocort

Overall, a good external exposure cor, trol program was in place; however, problems

were identified with a prejob as low as is reasonably achievable (ALARA) briefing. High

radiation area controls were effective (Section R1.1).

-

Hot * wkeepbg wRhin the radiological controlled areas of Unit 1 and 2 was very good

(Sec on R1.1).

.

Overall, a good internal exposure control program was implemented (Section R1.2).

Overall, a good program was in place for calibration and response checking of station

radiation survey meters. Effective cont;ols were implemented to prevent the spread of

contamination. All radioactive material was properly labeled and posted (Section R1.3).

A violation was identified for the failure to survey for radiciodine airborne activity in the

Unit i reactor containment building (Section R1.3).

-

A non-cited violation was identified for the failure of workers to follow radiation work

permit requirements (Section R1.3).

.

A violation was identified for the failure to post the reactor cavity as an airborne

radioactivity area (Section R1.3).

A violation, with two examples, was identified for the ft lure to inform workers of changing

radiological conditions (Section R1.3).

-

Effective training programs were maintained for radiation protection technicians and

radiation workers (Section RS.1).

_ . . . . . . _. . . . .

_ _ _ _ _ _ _ _ _ _ - _ -

.

3

Report Det4[13

Summarv of Plant Status

Both Units 1 and 2 operated at full power during the inspection period.  !

IV. Plant Sunoort

R1 Radiological Protection and Chemistry Controls

R1.1 External Exoosure Controls

a. insoection Sqoce (83750)

Selected radiation workers and radiation prc'ection personnelinvolved in the extemal

exposure control program were interviewed. Tours of the radiological controlled area

were performed. The following items were reviewed:

  • Radiological controlled area access controls

-

Job coverage by radiation protection personnel

, .

Housekeeping within the radiological controlled area

-

Dosimetry program

b. Observations ard Findinas

The inspectors conducted several tours of the radiological controlled area and performed

independent radiation measurements to confirm the appropriateness of radiological

postings. All Technical Specification high radiation areas were properly locked and

posted. All workers observed in the radiological controlled area wore their dosimetry

'

properly and knew to contact radiation protection personnel if their electronic dosimeters

alarmed. Housekeeping throughout the radiological controlled area was very good.

The inspectors determined that job coverage provided by radiation protection technicians

was appropriate for the radiological work observed. The inspectors attended a Unit 1

orejob ALARA briefing addressing entry into the reactor containment building during

power to remove insulation from a valve. The inspectors observed a good e. change of

information among the participants including: expected dose rates obtained from

historical surveys; unexpected radiation levels that would warrant turning back; and

proper handling, storage, and tagging of the insulation material following its removal. The

health physics technician assigned to provide job coverage discussed the expected

radiological conditions with the worker. The discussior also included a change in

radiological conditions that would be present in approximately 2 days, when the valve

was to be removed and the letdown heat exchanger was secured.

The inspectors commented that discussing future radiological conditions could lead to

workers' confusion. This observation was similar to observations made in NRC

Inspection Report 50-498/97-10; 50-499/97-10. Health physics management agreed that

.

. _ _ _ _ ___ .

.

..

.

-4-

further attention was needed to ensure that workers understood applicable radiological

information.

A review of Radiation Work Permit 1998-1-0155, Revision 0, used for the above task

identified that the radiological work area dose rates were listed as 50-60 millirems per

hour. However, a review of the radiological survey information revealed work area dose

rates were documented as70-100 millirems per hour. The inspectors commented that

providing radiological information on a radiation work permit that was not accurate could

lead to workers' misunderstanding of the radiological conditions. Health physics

management acknowledged the inspectors' comment.

l Neutron Doses

The licensee stated that approximately 8 to 10 entries into the reactor containment

.

building at power have been made weekly since 1994. The inspectors reviewed neutron

l doses for workers that entered containment at power between January 1991 - June

1990. The inspectors noted that the highest individual neutron dose was 100 millirem in

'

a year. Extensive surveys of neutron exposure rates were conducted by the licensee in

both Units reactor containment buildings at 100 percent eactor power to document

neutron dose rates. The licensee informed the insp0,, tors that the average neutron

energy cpectra encountered in the reactor containment at power were between

20 - 60 kilo-electron volts (kev).

The licensee currently process its dosimeters on site and was certified by the National

Voluntary Laboratory Accreditation Program for all categories with the exception of

category 1 which pertains to accident low energy photons. Neutron doses are based on

use of correction factors that were developed using bonner sphere measurements to

characterize the neutron fluence and energy spectra encountered in the reactor

containment building during power. A two-chip lithium-6 dosimeter was used by the

licensee for evaluating neutron doses to personnel. The inspectors concluded that the

neutron personnel dosimeters would provide an accursie response to the neutron

energies workers would encounter during containment entries.

c. Conclusions

Overall, a good external exposure controi sod dosimetry program was implemented. All

Technical Specification required high radiation area doors were properly locked and

posted. Housekeeping within the radiological controlled area was very good. All

personnel observed wore their dosimetry properly. Prejob ALARA briefings were

adequate.

___ _ - . _ _ _ _ _ -

.

e

<

5

R1.2 Internal Exoosure Controls

I

a. [nsoection Scooe (83750)

Selected radiation protection personnel involved with the internal exposure control

program were interviewed. The following items were reviewei

-

Respiratory protection program

.

Whole-body counting program, including the calibration of the counter

.

The intsmal dose assessment program

b. Observations and Findinas

.

The inspectors were informed that no respirators had been issued for radiological

protection since the previous inspection.

Whole body counters were verified to be calibrated using standards traceable to the

NationalInstitute of Standards and Technology (NIST). The inspectors noted that an

l- acceptable phantom was used along with radiation sources that covered energy ranges

'

between approximately 88 - 1836 kev. The inspectors concluded that a proper whole

body calibration program was in place.

Internal dose assessments were reviewed. Both whole-body counting of individuals and

estimates derived from cverage airbome concentrations of I-131 taken from air sampling

data resulted in proper estimates of committed dose equivalent. Both techniques were

compared by the inspectors and found in good agreement.

Upon review of air sample data for Unit 1 reactor containment building, the inspectors

I

identified that an airbome radioactivity area greater than 0.25 derived air concentration

(DAC) occurred on September 28,1997, in the reactcc cavity. However, the inspectors

determined that no DAC-hour assessments were performed. The licensee initiated

Condition Report 98-659 to evaluate the intemal radiation exposure for personnel known

to have been in the affected area during the event. See Section R1.3, ' Unit 1 Reactor

Cavity Event," for disposition of this matter.

c. Conclusions

Overall, a good intemal exposure control program was implemented. Whole-body

counters were prope:ly calibrated. Intemal dose estimates conducted by the licensee

were properly performed.

I

v ,

_ _ _ _ _ _ _ _ _

.

.

-6-

R1.3 Control of Radioactive Materials and Contamination: Su9eving and Monitoring

a. Insoection Scooe (83750)

Areas reviewed included:

-

Portable instrumentation calibration and performance checking programs

.

Posting and labeling

.

Radiological surveys necessary to assess personnel exposure

.

Radiation Work Permits

b. Observations and Findinas

l The inspectors reviewed neutron survey meter instrumentation for proper calibration and

'

_ energy response testing. A neutron spectrum analysis was performed using bonner

l

wphere neutron spectroscopy in the reactor containment building at power. From these

measurements correction factors were calculated. A review of calibration certification

documents noted that the neutron survey meters were calibrated using a PuBe

(plutonium-beryllium) source which was traceable to NIST. These meters were

calibrated to exposure rates rangirig from 2 millirems per hour through 200 millirems per

hour that adequately covered the licensee's normal exposure rates of 20-60 millirems per

Sour errountered in the reactor containment building at power. The inspectors

concluded that the licensee had implemented a proper neutron survey instrument

calibration program.

During tours in the radiological controlled area, the inspectors noted that all portable

radiation protection survey instrumentation observed was properly calibrated and source

response checked.

Radioactive material observed was labeled and posted properly. Contamination

boundaries were all marked and posted clearly.

Unit 1 Reactor Containment Building Airbome Event

The inspectors reviewed Condition Report 97-16562. This report documented a

September 22 23,1997, event in which the airborne concentration of radioiodine in

Unit 1 reactor containment building increased above 0.25 DAC. Areas greater than

0.25 DAC are required by station procedures to be posted as an airbome radioactivity

area. A time line describing the event follows:

September 22,1997

-

12:30 p.m. Stopped surveying Unit 1 reactor containment building for airborne

radiciodine activity

.

3:41 p.m. Unit 1 reactor containment building purge piaced out-of service for

scheduled calibration

i

l

_ __

.

7

. 7:52 p.m. Unit 1 reactor containment building atmosphere monitor removed

from service

.

8:08 p.m. Unit 1 reactor containment building chill water secured for open

loop cooling water system outage

-

10:31 p.m. Contaminated Unit i reactor containment building worker alarmed

personnel contamination monitor

-

11:00 p.m. Contaminated worker given whole body count, results indicated

lodine radioactivity was present

.

11:40 p.m. Unit 1 health physics personnel received a reactor containment

building atmosphere monitor alarm at the radiological access area

September 23,1997

l

.

12:43 a.m. Unit 1 reactoi containment building air sample revealed greater

l than 0.25 DAC (0.32 DAC), which required that the building be

l posted as an airbome radioactivity area

.

1:33 a.m. Unit i reactor containment building posted as an airbome

i

radioactivity area

-

2:26 a.r Unit 1 reactor containment building air sample less than 0.25 DAC

(posting of airbome radioactivity area removed)

The licensee evaluation determined that the following factors contributed to the

unexpected increase in radioiodine airbome concentration in Unit i reactor containment

t,uilding:- (1) it was known that minor fuel damage existed prior to outage 1RE07 as

evidenced by noble gas, iodine, and cesium concentrations in the reactor coolant;

(2) core alterations were in progress with the reactor cavity full of water; and (3) raactor

containment building purge and chill watei systems were out-of-service resulting in an

increase in temperature and humidity. This increase in temperature and humidity within

the Unit 1 reactor containment building caused an unexpected increase in radioiodine

being carried out of solution from the reactor cavity and going airbome.

Failure to inform Workers of a Chanae in Radioloaical Conditions

During review of Condition Report 97-16562, the inspectors noted that approximately

87 workers were in the reactor containment building on September 22-23, when airborne

radiological conditions changed, thus reouiring the building to be posted as an airbome

radioactivity area. All workers were sigred in on radiation work permits thet stated,"No

entry into posted airborne radioactivity areas (exclading noble gas)." The inspectors

noted no actions were taken to inform the workers of the change in radiological

conditions or posung. The licensee investigation revealed that the night shift health

physics division manager provided instructions [to his staff) "not to stop work," even

_ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _--- -

.

-8-

though radiation work permits in use did not permit entry into posted airborne

radioactivity areas. The licensee's investigation noted that the night shift health physics

manager stated that his decision was based on his " assessment that the dose potential

for workcro due to the low concentration was minimal and that his experienca led him to

s

'

believe that subsecuent confirmatory sampling in progress would show air

concentrations below the criteria requiring posting."

10 CFR 19,12(a) states, in part, that all individuals, who in the course of employment, are

likely to receive in a year an occupational dose in excess of 100 millirems shall be kept

informed of the storage, transfer, or use of radiation and/or radioactive material. The

inspectors concluded that workers in the Unit 1 reactor containment building on

September 22-23,1997, were likely to receive an occupational due in excess of

100 millirems per year. The inspectors noted that a similar event occurred again on

September 28,1997, in the Unit 1 reactor cavity which is described on pages 11 and 12.

Corrective acticnc to prevent a recurrence were identified in Condition Report 97-16562,

action item No. 2. The inspectors noted that action item No. 2 required an evaluation of

the "hea!th physics response to posting Unit 1 reactor containment building as an

airbome radioactivity area." The inspectors reviewed this investigation report, which was

dated November 10,1997, and noted that recommended corrective action No. 2, stated,

" Evaluate current procedures to ensure appropriate methods are in place to both allow

health physics to amend radiological controls in the field with appropriate

evaluations / approvals and to communicate field changes to workers." However, the

inspectors concluded that there were no immediate corrective actions that addressed the

failure to inform the workers in the reactor containment building of a change in

radiological conditions.

The inspectors concluded that corrective actions were not implemented within a

reasonable time to prevent the second event which occurred on September 28,1997.

Therefore, this licensee identified event involving the failure to inform the workers of the

presence of airborne radioactive materialin excess of the station posting airbome

threshold requirements, is being cited as the first exemple of a violation of 10

CFR 19.12 (a), because the critcria for exercise of discretion as descritsed in

Section Vll.B.1 of the NRC's Enforcement Policy were not satisfied (50-498L 02-01).

The licensce's position, as stated in the additional material provided to the inspectors on

January 21,1998, is that they do not believe the events involved a violation

10 CFR 19.12(b) because no new radiological health problems were introduced by the

insignificant change in the Total Effective Dose Equivalent (TEDE) stemming from the

airborne radiciodine. Specifically, the licensee stated that the airborne level change was

minimal (adding only approximately 0.24 millirems per hour TEDE to a worker), and that

workers in the area were informed, via radio'ogical postings (radiation area), that

conditions u, to 100 millirems per hour TEDE could exist in the work area.

However, the inspectors noted that at the time the reactor containment building monitor

alarmed at 11:40 p.m. on September 22,1997, the potential radiological health

protection problems were unknown. The fact that the change in radiological conditions

was minimal was not known during the event. The inspectors concluded that conditions

_ _ _ _ _ - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _

.

.. .. .

.

9

were unknown for the following reasons: (1) sampling for radioiodine in containment had

stopped at 12:30 p.m. on September 22,1997, thus indicating that the health physics

staff was not expecting a radioiodine airbome condition; (2) a review of the reactor

containment building atmosphere monitor data for September 22,1997, revealed that

airborne radiological conditions were recorded as 2 DAC, and the health physir.s staff

was not aware of this condition; (3) the health physics staff was not aware of an

increasing trend in reactor containment building airbome condition that began when the

reactor containment building purge system was placed out-of service at approximately

4 p.m. on September 22,1997; and (4) at 11 p.m. on September 22,1997, the cause of

a reactor containment building workers contamination alarm was determined to be

radiciodine actWity; however, the licensee took no actions to verify airbome conditions in

the reactor containment building. Additionally, the health physics staff was not aware of

the Unit 1 reactor containment building atmosphere monitor set point until the licensee's

investigation of this event. The inspectors noted that the monitor was set to alarm at

approximately 4 DAC.

Failure to Survey

On September 22,1997, at 3:41 p.m., the licensee placed the reactor containment

building purge system out of service for calibration. The inspectors reviewed the Unit 1

reactor containment building atmosphere monitor data and noted an increasing trend in

l radiological airborne conditions of 3.25E-10uCi/cc at 4 p.m. to 3.88E-8uCi/cc

l (approximately 2DAC) at 7 p.m. From interviews with health physics personnel, the

) inspectors determined that the licensee was not aware of thia iricreasing trend during this

f time. At 7:52 p.m., the monitor was removed from service for a scheduled surveillance

l test. The health physics staff was not aware that the monitor was removed from service

f until the inspectors' review of this event on January 13,1998. Additionally, once the

'

airbome monitor was placed out-of-service, no radiciodine airbome surveys were

performed until 12:15 a.m. on September 23,1997, in response to the reactor

containment building atmosphere monitor alarm. Subsequently, the first time that

radiciodine air sampling was performed following the decision to stop air sampling at

12:30 p.m. on September 22,1997, was at 12:15 a.m. on September 23,1997, some 11

and 3/4 hours later.

Durir,g review of additional material provided to the inspectors on January 21,1998, by

the licensee, the inspectors noted that the licensee stated that they had identified the

issue of failure to survev and were sampling the Unit 1 reactor containment building

airborne radioactivity by using the reactor containment building atmosphere monitor.

The inspectors agree that the atmosphere monitor was in service from the time the

licensee stopped sampling for radiciodine airbome activity on September 22,1997, at

12:30 p.m. until the time it was removed from service at 7:52 p.m. that same evening.

However, there was no information provided to the inspectors to conclude that this

airborne information was being evaluated in an effort to maintain an awareness of the

airbome radiological conditions in the Unit 1 reactor containment building on September

22, at 12:30 p.m. until the monitor was removed from service. Additionally, a review of

the reactor containment building atmosphere monitor data from 7 p.m. on September 22,

_ _ _ _ ___-_ .__ __-_-_ _____ _ __ _ -.

.

4

-10-

1997, revealed that airborne radiological conditions were recorded at 2 DAC, and no

actions were taken by the licensee to verify this condition.

The licensee also stated that in the analysis section of Condition Report 9716562:

(1) item No.1, ident$ed that airbome radioiodine concentrations above the current

thresholds for posting was projected by health physics prior to the outage. However, the -

information was not synthesized into outage radiation work permits; (2) item No. 2, stated

that, the alert alarm set point for RE80111B at approximately 4 DAC was too insensitive

to provide meaningful warning of increasing reactor containment building radioiodine

concentrations; and (3) item No. 5, stated that, the decision to cease air iodine grab

sampling removed air sampling as a method for early waming of increasing air iodine

concentrations.

The inspectors noted that although the licensee projected the airbome radioicdine

concentrations prior to the outage, it did not relieve the licensee of the requirement to

evaluate the potential radiological hazards that could be present during the time that

work was being performed in a radiological controlled area. Additionally, the inspectors

l noted that corrective action No. 8 of Condition Report 97-16562 stated " develop

l guidance for adjusting radiation monitoring system alarm set points to account for

chan0ing plant conditions, outage periods should be especially reviewed to ensure that

adequate waming of changing conditions is provided when compared to normal plant

conditions." However, there were no actions identified to perform or evs.luate surveys

after the atmosphere monitor was removed from service to ensure compliance with

station procedures or 10 CFR 20.1501(a) requirements.

Technical Specification 6.11.1 states, in part, that procedures for personnel radiation

protection shall be prepared consistent with the requirements of 10 CFR Part 20 and

shall be approved, maintained, and adhered to for all operations involving personnel

radiation exposure.

10 CFR 20.1501(a) states, in part, ". . . that each licensee shall make or cause to ba

made, surveys that: (1) May be necessary for the licensee to comply with the regulations

- in this part; and (2) Are reasonable under the circumstances to evaluate -(ii)

concentrations or quantities of radioactive material; and (iii) The potential radiological

hazards that could be present."

Section 4.6.4 of Radiation Protection Procedure OPGP03-ZR-0050, " Radiation

Protection Program," Revision 1, states, in part, that, " Job coverage, or specific surveys,

shall be of the type and frequency . . to assess the extent of . . concentrations of

radioactive materials and the potential radiological hazards to which workers may be -

exposed.*

The inspectors concluded that specific corrective actions were not completely identified

to address the entire event. Therefore, this licensee identified event involving the failure

to survey for rdiciodine from 3:41 p.m. on September 22,1997, until 12:15 a.m. on

September 23,1997, to determine the concentrations of radioactive material and the

potential radiological hazards present in the Unit 1 reactor containment building is being

. _ _

,

- _ _ _ - - _ - _ - _ _ _

.

-11-

cited as a violation of Technical Specification 6.11.1, because the criteria for exerciss of

discretion as described in Section Vll.B.1 of the NRC'c Enforcement Policy was not

satisfied (50-498/9802-02).

Failure to Follow Radiation Work Per nit Instructions

During the review of Condition Report 97-16562, the inspectors noted that on

September 23,1997, the Unit i Reactor Containment Building was posted as an

"Airbome Radioactivity Area" fiom 1:33 a.m. until 2:26 a.m. During discussions with

health physics staff, the inspectors were informed that between 1:33 a.m. and 2:26 a.m.,

approximately 24 workers entored the reactor containment building, a posted airbome

radioactivity area, using radiation work permits that did not allow entry into this s,rea. A )

review of the corrective actions identified that prior to the next refueling outage, this event

would be highlighted during the training cycle, and mes.ns to physically deter workers

from entering an area where radiological conditions have changed would be evaluated.

The inspectors concluded that these corrective actions would likely prevent a similar

occurrence.

Technical Specification 6.8.1.a states, in part, that written procedures shall be

established, implemented, and maintained covering the app!! cable procedures

recommended in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978.

Regulatory Guide 1.33, Appendix A, Section 7.e.1, recommends procedures for the

l

radiation work permit system.

l Radiation Protection Procedure OPGP03-ZR-0051, "Radiologica'. Access and Work

l Controls, " Revision 7, Section 5.3.3, states, in part, "RWP (Radiation Work Permit)

j instructions, radiological postings and baniers, . . . shall be adhered to at all times."

.

The failure to follow the airbome restrictions on the radiation work permits is identified as

t a violation of Technical Specification 6.8.1. However, this nonrepetitive

I

licensee identified and corrected v;olation is being treated as a Non-Cited Violation,

consistent with Section Vll. B.1 of the NRC Enforcement Policy (50-498/9802-03).

As discussed previously, during review of the airbome event on September 22,1997, the

inspectors noted that a radiation monitor alarm for Unit i reactor containment was

received in the Unit 1 control room; however, no response actions were docun ented by

the control room staff. In discussions with the Unit 1 operations manager, the inspectors

were informed that if an alarm is expected, documentation was not rec;uired. However,

the inspectors were informed by operations management that it was management's

expectation that this alarm should have been communicated to the health physics staff.

Operations management stated that they would review the circumstances of this event to

improve future communications between operations and health physics staff.

i Unit 1 Reactor Cavity Event

i

The inspectors reviewed Unit 1 reactor cavity air samole data and identified that on

September 28,1997, at 11:07 p.m. air sample results indicated thet airbome radiological

-_

,

-12-

activity was 1.5 DAC. During discussion with the health physics staff, the inspectors

noted that the health physics division manager was not aware of this event untilit was

identified by the inspectors, on January 13,1998. On January 14,1998, the licensee

documented the event in Condition Report 98-659. The inspectors interview-i the

acting health physics supervisor who was involved in this event to gain an u. w tanding

of the circumstances surrounding it. The supervisor informed the inspectors that he was

confused by the fact that the 1.5 DAC air sample was just radioiodine activity and not a

mixture of isotopes. The inspectors were informed that no actions were taken to inform

the workers of the change in radiological conditions because it was the acting health

physics supervisor's opinion that a backup air sample would result in an airbome

radioact" .y concentration below the procedural posting limit (<0.25DAC). The

inspectors questioned the fact that if radioiodine was not expected by the acting health

physics supervisor did he have a compkte understanding of the event. The inspectors

noted that the backup air sample results taken at 11:45 p.m. on September 28,1997,

were less than 0.25 DAC. The inspectors review of the radiological survey data

concluded that v/orkers in the Unit 1 reactor cavity on September 28,1997, were likely to

receive an occupational dose in excess of 100 millirems per year.

A review of Radiation Work Permit 1997-1-0261, Revision 0, which was used for reactor

cavity decontamination revealed that it stated, "No entry into posted airbome radioactivity

areas (excluding noble gas)." The failure to inform the workers of the presence of ,

airborne radioactive materialin excess of the station posting airborne threshold on

September 28,1997, is a second example of a violation of 10 CFR 19.12(a)

(50-498/9802-01).

The inspectors reviewed radiological postings conceming the September 28,199i, event

and identified thht from 11:07 p.m. to 11:45 p.m. on September 28,1997, air sample data

revealed that airbome concentration in the Unit 1 reactor cavity area was 1.5 DAC.

l

Technical Specification 6.8.1.a states, in part, that written procedures shall be

)

'

established, implemented, and maintained covering the applicable procedures

recommended in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978.

Regulatory Guide 1.33, Appendix A, Section 7.e.3, recommends procedures for airborne

( radioactivity monitoring.

!

Racation Protection Procedure OPRPO4-ZR-0015, " Radiological Posting and Waming

Devices," Revision 3, Section 2.2 states, in part, "STP (South Texas Projects) will post

airbome raf aactivity areas at 0.25 DAC or greater."

The failure to post the reactor cavity as an airborne radioactivity area on September 28,

1997, from 11:07 p.m. until 11:45 p.m., in accordance with Procedure OPRPO4-ZR-0015,

Revision 3, is a violation of Technical Specification 6.8.1 (50-498/9802-04).

c. Conclusions

s

A good program was in place for proper calibration and response checking radiation

survey meters. Radioactive material was properly labeled and posted. Violations were

.. -

________ -_____ - _ - __ -- -

- -

.

,

-13-

identified for the failure to: (1) perform a radiological survey; (2) post the reactor cavity

as an airborne radioactivity area; and (3) inform workers of changing radiological

conditions. A non-cited violation was identified for the failure to follow radiation work

permit airborne restrictions.

R5 Staff Training and Qualification la Radiological Protection

R5,1 Staff Training and Quakfications

a, inspection Scoos (83750)

Personnel involved with radiation protec'Jon technician and radiation worker training were

interviewed. The following items were revieweJ:

  • R'adiation protection technician continuing training lesson plans

Radiation worker required training

b. Observations and Findinos

The inspectors interviewed an instructor responsible for the development of radiation -

protection technician continuing training lesson plans. The inspectors were informed that

performance issues identified by the condition reporting system, along with health

physics management input, were useful in determining objectives for upcoming

- continuing training. The in.pectors reviewed the latest radiation protection technician

lesson plan and noted that it contained appropriate subject information.

The inspectors reviewed the training requirements for radiation workers requiring -

unescorted access to the radiological controlled area. Procedure OPRP01-ZR-0005,

" Access Control Point Management," Revision 2, Section 4.1.2, requires that all persons

requiring unescorted access to the radiological controlled area shall have current GET ll

training. The training records for five radiation workers who performed cavity

decontamination during' the Unit 1 Outage 1RE07 were reviewed. The licensee's

documentation verified that each worker was properly trained.

c. Conclusions

The licensee had implemented effective training programs for radiation protection

technicians and radiation workers.

_

- _ _ _ _ _ .

>

14-

R7 Quality Assurance in Radiological Protection and Chemistry Activities

R7.1 Quality Assurance Audits and Surveillances. and Health Physics DivisiOD

Self-Assessments-

l

a. Inspection Scow (83750)

Selected personnel involved with the performance of quality assurance audits and

surveillances, and radiation department self-assessments were interviewed. The

following items were reviewed:

  • Quality assurance audits performed since August 1997

Quality assurance surveillances performed since August 1997

Health Physics division self assessments performed since August 1997

b. Qhservations and Findinas

No quality assurance audits or surve3 lances had been performed since the last radiation

protection inspection in Augusi 1997, Additionally, the inspectors noted that the last

operational based health physics self-assessment was performed in April 1997.

The inspectors reviewed 17 quality assurance monitoring reports (observations) and

noted no negative trends.

V. Manaaement Meetinas

u X1 Exit Meeting Summary

!

l

'

The inspectors presented the inspection results to members of licensee management at

an exit meeting on January 15,1998. The licensee acknowledged the findings

preselited. The ticensee stated that they did not agree with the potential violation

pertaining to failure to inform the workers when radiological conditions changed because

the actual change in radiological conditions did not constitute a substantial increase to

the workers TEDE. No proprietary in'ormation was identified.

._-

. . . ._ . -- _. . . . . - -. _ .. -

4

ATTACHMENT

PARTIAL LIST OF PERSONS CONTACTED

Licensee

J. Groth, Vice President, Nuclear Engineering

R. Aguilera, Radiction Protection Supervisor

J. Allessi, Sr. Health Physicist Technician

P. Anington, Licensing Engineer

P. Carter, Sr. Health Physicist Technician

J. Diehl, Health Physicist

L. Earls, Health Physicist

S.C. Horak, Sr. Health Physicist Technician

D. Huberak, Health Physics Technician

J. Inman, Health Physicist

R. Logan, Health Physics Division Manager

J. Lovell, Manager, Unit 1 Operations

R.E. Messe, Unit 2 Plant Manager

J. Sepulveda, Radiation Protection Supervisor

S. Smith, QA Specialist

NBC

W. Sifre, Resident inspector

INSPECTION PROCEDURE USED

83750 Occupational Radic.t.'on Exposure

LIST OF ITEMS OPENED AND CLOSED

Ooened

50-498/9802-01 VIO Failure 13 inform workers of a change in radiological conditions

50-498/9802-02 VIO Failure to survey

50-498/98G2-04 VIO Failure to post and airborne radioactivity area

Ooened and Closed

50-498/9802-03 NCV Failure to follow RWP requirements

f

. _ _ _ _ _ _ _ _ _ _ _ __-__

,

.

2-

LIST OF DOCUMENTS REVIEWED

Procedure OPGP03ZR0048, " Personnel Dosimetry Program," Revisicn 2

Procedure OPGP03ZR0050, " Radiation Protection Program," Revision 1

Piocedure OPRP02ZR0007, " Evaluation of Intakes," Revision 2

Procedure OPRP02ZR0010, " Personnel Exposure investigation," Revision 3

Procedure OPRP02ZR0011, " Calibration of WBC System," Revision 0

Procedure OPRP02ZX0022, "Non-Routine Dosimetry issue and Control, Revision 5

-

.

~

Procedure OPRP04ZR0004," Release of Materials From Radiologically Controlled Areas,"

Revision 1

Procedure OPRPO4ZR0013, " Radiological Survey Program," Revision 4

Procedure OPRP07ZR0010, " Radiation Work Permits," Revision 4

1

_ - _ - _ _ - _ _ _ - _ _ _ _ _ _ - _ - _ -

JAH-21-1998 09853

' '

MILEm L1&NSING 512 972 8290 P.02/05

..t

ENCLOStlRE 3

January 21,1998

,

To: M. A.McBurnett

Freas: R. V. Logan

Subket: SIP Notes on Potential Violations identHind in NRC Inspection

93 2 Radiation Protadlan Programa

'Ibe following is our analysis of the poennrial violations identified in the NRC Exit Meeting

on Januay 15th. We believe that tha potential violation related to nohfination of

individuals requhed by Part 19.12 is not valid. We believe that we have previously

with conective action in progress, the potential violations relative to the entry

into a posted airbome area without the proper RWP and relative to the failure to perfonn

a survey. Additionally, we wuld like to ensure the circumstances relative to the failure to

post an airborne are clearly understood. Accordingly, the following describes our position

on eoch of the Potential violations,

hmm v af one.nei.i vinininn

10CFR19.12(aV1) states: "All individuals who in the course of employment ce likely to-

receive in a year an pecupational done in excess of 100 inrem (1 mSv) shall be kept

infonned of the storage, transfer, or use of radiatina and/or radioactive material."

Contrary to the requirements of 10CFR19.12(a)(1) STP failed to keep workers informed

of a change as required on two occasions. 'Ihe first occasion occuned on 09/22/9'i when

_

workers were not notified when maavned airborne radio-lodine levels were verified to be

0.32 DAC in the rannar containmant building. The second occasion occuned on 09/27/97

when workers in the reactor cavity were not informed of measured radio-iodine levels at

1.5 DAC. In neither case was entry into posted airbome radioactivity areas allowed unde-

the radiation work permits in use. The failure to notify the affected individuals that the

'

instructions previously given, by radiation work permit, were no longer applicable

constitutes a failure to properly inform workers.

Position

South Texas Project does not believe that the events described represent a violation of

NRC Requirements.

10CFR19.12(b) states "In determining those individuals subject to the requirements of

paragraph (a) of this section, the licensee must take into consideration assigned activities

dunng normal and abnormal situa*lons involving exposure to radiation and/or radioactive

material which can reasonably be expected to occur during the life of a licensed facility.

The extent of these instructions must be commensurate with the potential radiologic 1d

heahh protection problems prescrit in the work place."

l

!

, . . - .

.

1

. . .

. . . . .

, .pp.gcf30= 03:54 tOCLFJR LICENSlHCi- 512 972 8298 P.03/Of2

.

It is clear (by direct reference) that section 19.12(b) quali6cs the precedmg section (a) by

dw.dimgt

(i) Who must receive the infonnation in section (a)

'

(ii) To what extent these instructions must be made available, hased on the

potential radiologi^ cal health protection problems present.

While not- explicitly stated, the pote$dal radiological health protection problems -

referenced in section 19.12(b) for a power reactor facility can be assumed to stem from

the total effective dose equivalent (TEDE), found by summing the committed effective

dose equivalent (CEDE) and deep dose equivalent (DDE) for the exposure involved.

In the first occasion cited above, an aidsse level of 0.32 DAC equates to an

approximately equivalent change of 0.24 mrem /hr TEDE. Workers in the area were -

laformed, via radiological p=Haga, that conditions up to 100 mrom/br TEDE could exist

in the work area. During interviews conducted for this investigation the night shift Health

Physics Manager indicated that : hic decision was based on his maanamant that the dose

- petial for workers due to this low concentration was minimal and that his experience

k d him tW5 that subsequent confirmatory sampling in progress would show air

concentration below the criteria requiring posting.- He stated that he had considered a

plant page anncunermant informing woriers of the ahborne radioactivity but rejected this -

l. as he believed that the message would not be clearly understood and potentially cause

undue concern. Additionally, he indicated that he rejected the idea of using the

containmant evacuation alarm as he felt this would result in undue panic on the part of -

workers resulting in potential personnelinjury. In direct questioning regarding the extent

' to which he felt schedule pressure may have influenced his decisions , tbs night shift

Health Physics Manager indicated that his understanding of the minimal exposure potential

that the airborne condition represented and his concem for not creating undue worker

concem and confusion lead to these decisions.

We believe that no new potential radiological health protection problems were introduced

by this insignificant change in the TEDE as a result of the presence of an additional 0.24

mrem /hr in the area. Consequently, we have met our duty to keep workers informed as

required by 19.12(a)(1) through the ire.ial instructions provided to the workers.

In the second occasion cited above, an airbome level of 1.5 DAC equates to an

approximate change of 1.13 mrem /hr TEDE. Workers in the area were informed, via

radiological postings, that conditions up to 1000 mrem /hr TEDE could exist in the work

area. Discussions with the Health Physics personnel in the area has revealed that they

considered the need to pull the individuals out of the area due to the measurement

obtained. However, they believed that this would have resulted in higher total exposures

to the workers due to the need to traverse the area to exit and subsequemly re-enter the

2

1

c _

.

. . . .

.

. ..

'

,

N21-1998 09 54 MILEM t.lCOGI G 512 972 8290 P.04/06

.

area upon compledon of the verification sample. While our full investigation of this

- occunence is not yet complete, the Health Physics personnel have stated that they had the

best interest and safety of the workers at the forefmnt during the event.

We believe that that no new pM*1 radiological health protection problems were

intradwed by this lanignificant change in the TEDE a : a result of the presence of an

additional 1.13 nuem/br in the area. Consequently, we have met our duty to keep workers

informed as required by 19.12(aX1) through the initial instructions provided to the

worken.

'

Summary of violation

Wodoers failed to heed radiological airborne posdngs thus violating their radiation work

permits and procedures OPGP03-ZR-0050 and OPOP03-ZR 0051.On 09/23/97

apprmimanaly 24 workers failed to adhere to station procedures governing radiation work

pennha in that they entered a posted airborne radioactivity area when prohibited to do so

by instructions on their radiation work pernut.

Ensiden

S17 concurs that these vinistim occurred;however, these occurrences were self-

identinnd through condation report 97-16562 under the analysis section, item #8,

"Womcas aradne the cantainment on RWPs after 0133 and before 0226 failed to observe

the change in postings and thus failed to comply with their RWPs and with several

procedure steps requiring RWP comphance." While our initial conective actions should be

effective in miminizing the recurrence of similrr events in the future, additional mammuts

were r-maadad to help institudonalize the change. These suggestions have been

inchuled for consideration to help prevent recurrence .

Corrective actions from the condition report.

C5- Include this event in general employee traming industry events. ' Ibis should

be timed to ensure that the majority of STPNOC employees review this

topic during requal pdor to the next outage and contractors coming la for .

the next ourage are also presented this m**arial.

C6- Include a summary of this event in the outage focus day for 2RE06.

C1' - Consider a means to physically deter workers from entering and area where

radiological conditions have changed which may require new radiological

work permitinstructions.

l

3

_-

_ _ _ _ _ _ _ - _ - _ _ _ - _ _ _ _ _ _ _ - _ _ __ _ - - - ,- _

JfH-21-1998 :09:55 RJCLEAR LICD 61HG 512 972 8290 -P.05/06

..-

,

Si=wn=rv of vialation -

10CPR20.1501(a) states: "Each liraneaa shall make or cause to be made, surv vs that (1)

- may be =**sary for the AI -m to comply with the regulations in this part; aM (2) are

ramenanhia under the circumstances to evaluate (i) the xtent of the radiation levis; and

(ii) oone at ations or quantidos of radioactive materials; and (iii) the potential hazards that

could be present."

- On 09/22/97 the E=w failed to pesform the required airborne radioactivity surveys to

_ identify the presence of airborne radio-lodine ira concentations up to 2.0 DAC.

Position

STP concurs that we did not adequately comply with 10CFR20.1501; however, this issue

was selfddantified and is appropriately covered in our actions completed under Condition

Report condition reprt 97-16562.

,

'

A survey, as defined in 10CFR20.1003 means "an evaluation of the radiological candirlans

and pan =!*1. hazards incident to the production, use, transfer, release, disposal, or

presence of radioactive material or other sources of radiation. When appropriate, such an

evaluation includes a physical survey of the location of te radioactive material and

measurements or eawlations of levels of radiation, or eaarantrations or quantities of

radioactive materialpresent."

While a survey was performed prior to the outage, and continuous measurements were

being obtained by plant monitoring instmments (RE8011B - During the lavestigation this -

instrumant was used to calculate the maximum concentration premt in the work place

during the event), the staff failed to utilize these surveys appropriatety. This was ideatified

in the analysis section of condition report 9716562, item #1, " Airborne radio-lodine -

concentrations above the current thresholds for posting was projected by health physics

prior to the outage. This information was tct syd+-M into outage RWPs.", item #3,

"Tbc alert alarm set point for RE8011B at apptoximarr.ly 4 DAC was too irwmitive to

- provide i== hyal waming of mereasing RCB radio-iodine concentrations." and , item

  1. 6, "Ihe decision to cease air iodine grab umallag removed air sa.mpling as a method for

early waming ofincreaJng air iodine concentrations."

Corrective actions from the condition report -

'

C7- Include a discussion cf this eye.at and subsequent programmatic changes

which have occurred in Health Itysics continuing training prior to 2RE06.

I

I

4

. .

_ __ a

.

.

.. .. .

____

JFN-21-1We it>*do tOCLEfH L1u.tb1tu g2 m e p, %

0

C8- Develop guid:nce for adjusting radiation monitoring system alarm set

points to account for changing plant conditions. Outage periods should be

especially reviewed to ensure that adequate warning of changing conditions

is provided when compared to normal plant operations.

Summary of pneantini viniatian

Health Physics fai'.ed to properly post an airborne area as required by station procedures.

During Unit l's seventh refueling outag*, Health Physics failed to post the reactol cavity

as an airbome radioactivity area as required by station procedures. Air umpling during

cavity A~na**mlantion activities identified radio-iodine concentrations of up to 1.5 DAC

in the work area. No action was taken by Health Physics personnel present in the area to

post the area as airborne radioactivity area.

Positinn s

!

'

STP concurs that the violation occurred. The individual involved was aware that the

previous air samples taken in the area indicated less than 0.25 DAC and fully believed that

the sample in&= ting 1.' DAC was cross contaminated and invalid. He elected to obtain

another air sample in th 'ork area prior to posting the area. 'Ihe back up air sample

identified concentrations buow 0.25 DAC which the individual believed justified taking no

action prior to obtaining the confirmatory air sample. A full investigation is being

performed under condition reoort 98-0659. A full root cause investigation into the event is

expected to be completed by J26/98 with appropriate corrective actions identified.

.

.

5

.

eseaye. M MM