MONTHYEARML0824706232008-08-29029 August 2008 License Amendment Request: Appendix K Measurement Uncertainty Recapture - Power Uprate Request Project stage: Request ML0826703842008-09-24024 September 2008 Acceptance Review for Appendix K Measurement Uncertainty Recapture Application Project stage: Acceptance Review ML0827401442008-10-0303 October 2008 Request for Additional Information for License Amendment for Measurement Uncertainty Recapture Power Uprate- Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2 Project stage: RAI ML0828102202008-10-15015 October 2008 Request for Additional Information License Amendment for Measurement Uncertainty Recapture Power Uprate-Calvert Cliffs Nuclear Power Plant, Unit 1 and 2- Project stage: RAI ML0830400232008-11-0404 November 2008 Request for Additional Information License Amendment for Measurement Uncertainty Recapture Power Uprate-Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2 (TAC Nos. MD9554 and MD9555) Project stage: RAI ML0831006242008-11-17017 November 2008 Request for Additional Information, License Amendment for Measurement Uncertainty Recapture Power Uprate Project stage: RAI ML0834300122008-12-0303 December 2008 Bg&E Calculation CA00800, Total Loop Uncertainty Calculation for the Plant Computer'S Determination of Main Feedwater Pump Discharge Pressure, Revision 1 Project stage: Other ML0834300102008-12-0303 December 2008 Response to Request for Additional Information - License Amendment for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI ML0900203822008-12-29029 December 2008 Response to Request for Additional Information Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI ML0912401062008-12-30030 December 2008 Response to Request for Additional Information - License Amendment for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI ML0901301452009-01-27027 January 2009 Revised Schedule for Appendix K Measurement Uncertainty Recapture (Mur) Power Uprate Request - Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2 (TAC Nos. MD9554 and MD9555) Project stage: Other ML0905003982009-02-17017 February 2009 Response to Request for Additional Information on License Amendment for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI ML0906307502009-02-18018 February 2009 Response to Request for Additional Information License Amendment for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI ML0907705322009-03-24024 March 2009 Request for Additional Information License Amendment for Measurement Uncertainty Recapture Power Uprate - Calvert Cliffs Nuclear Power Plant, Units 1 & 2 - (TAC MD9554 and MD9555) Project stage: RAI ML0907900242009-03-24024 March 2009 Request for Additional Information License Amendment for Measurement Uncertainty Recapture Power Uprate - Calvert Cliffs Nuclear Power Plant, Units 1 & 2 (TAC MD9554 and MD9555) Project stage: RAI ML0906403082009-03-26026 March 2009 Request for Withholding Information from Public Disclosure for Calvert Cliffs Nuclear Power Plant Unit Nos. 1 and 2 (Tac Nos. MD9554 and MD955) Project stage: Withholding Request Acceptance ML0913101692009-05-0707 May 2009 Response to Request for Additional Information - License Amendment for Measurement Uncertainty Recapture Power Uprate Project stage: Response to RAI ML0918802362009-07-0707 July 2009 Appendix K License Amendment Request Project stage: Other ML0918203662009-07-22022 July 2009 Amendment Regarding Measurement Uncertainty Recapture Power Uprate Project stage: Acceptance Review 2008-09-24
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000317/20230042024-02-0101 February 2024 Integrated Inspection Report 05000317/2023004 and 05000318/2023004 ML24029A0102024-01-29029 January 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000317/2024010 and 05000318/2024010 ML24003A8872024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0033 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 05000318/LER-2023-004, Submittal of LER 2023-004-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Submittal of Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-01-16016 January 2024 Submittal of LER 2023-004-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Submittal of Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer ML24011A0732024-01-11011 January 2024 Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping 05000318/LER-2023-002, Forward LER 2023-002-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-01-0808 January 2024 Forward LER 2023-002-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer 05000318/LER-2023-003, Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip2024-01-0808 January 2024 Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip ML24005A0222024-01-0505 January 2024 Revised Steam Generator Tube Inspection Reports ML23304A0642024-01-0202 January 2024 Issuance of Amendment No. 349 to Modify the Long-Term Coupon Surveillance Program RS-23-125, Request for Exemption from 10 CFR 2.109(b)2023-12-0707 December 2023 Request for Exemption from 10 CFR 2.109(b) ML23331A2992023-11-27027 November 2023 Submittal of Condition Prohibited by Technical Specifications Due to Failure to Sample Diesel Generator Fuel Oil Storage Tank IR 05000317/20230102023-11-20020 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000317/2023010 and 05000318/2023010 ML23318A4722023-11-14014 November 2023 Supplement to License Amendment Request to Adopt TSTF-59-A ML23317A1032023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums ML23310A0442023-11-0707 November 2023 Project Manager Assignment IR 05000317/20230402023-11-0202 November 2023 95001 Supplemental Inspection Report 05000317/2023040 and Follow-Up Assessment Letter IR 05000317/20230032023-11-0101 November 2023 Integrated Inspection Report 05000317/2023003 and 05000318/2023003 IR 05000317/20230902023-10-26026 October 2023 Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation; Inspection Report 05000317/2023090 ML23289A1202023-10-16016 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-108, Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles2023-10-11011 October 2023 Proposed Alternative for Examinations of Examination Categories B-B, B-D, and C-A Steam Generator Pressure Retaining Welds and Full Penetration Welded Nozzles RS-23-105, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2023-10-10010 October 2023 Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections ML23279A1202023-10-0606 October 2023 Response to NRC Inspection Report and Preliminary White Finding IR 05000317/20230502023-09-29029 September 2023 Special Inspection Report 05000317/2023050 and Preliminary White Finding and Apparent Violation ML23272A1032023-09-29029 September 2023 Condition Prohibited by Technical Specifications Due to Inoperable Nuclear Instrumentation at Very Low Power IR 05000317/20234012023-09-18018 September 2023 Cyber Security Inspection Report 05000317/2023401 and 05000318/2023401 ML23254A0012023-09-0505 September 2023 Registration of Use of Casks to Store Spent Fuel IR 05000317/20230052023-08-31031 August 2023 Updated Inspection Plan for Calvert Cliffs Nuclear Power Plant, Units 1 and 2 (Report 05000317/2023005 and 05000318/2023005) ML23158A1952023-08-30030 August 2023 R. E. Ginna - Issuance of Amendments to Adopt TSTF-273-A, Revision 2, Safety Function Determination Program Clarifications ML23241A8412023-08-29029 August 2023 Response to Request for Additional Information - Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping ML23240A3872023-08-28028 August 2023 Senior Reactor and Reactor Operator Initial License Examinations ML23151A3472023-08-21021 August 2023 Issuance of Amendments to Adopt TSTF-295-A, Modify Note 2 to Actions of PAM Table to Allow Separate Condition Entry for Each Penetration ML23219A1662023-08-16016 August 2023 Request for Additional Information Regarding Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping (EPID: L-2023-LLR-0006) - Non-proprietary ML23228A1002023-08-15015 August 2023 Notification of Readiness for NRC 95001 Inspection ML23188A0402023-08-0808 August 2023 Issuance of Amendment Nos. 346 and 324 Adoption of TSTF-577, Revised Frequencies for Steam Generator Tube Inspections, Revision 1 ML23214A1572023-08-0707 August 2023 Correction to the Renewed Facility Operating License Page 3 in Amendment No 345 IR 05000317/20230022023-08-0303 August 2023 Integrated Inspection Report 05000317/2023002 ML23188A0512023-07-13013 July 2023 Correction to the Renewed Facility Operating License Pages in Amendment Nos. 336 and 314 ML23186A0372023-07-13013 July 2023 Correction to the Renewed Facility Operating License Pages in Amendment Nos. 340 and 318 IR 05000317/20233012023-07-12012 July 2023 Initial Operator Licensing Examination Report 05000317/2023301 and 05000318/2023301 IR 05000317/20230122023-07-10010 July 2023 Commercial Grade Dedication Report 05000317/2023012 and 05000318/2023012 ML23180A2362023-06-29029 June 2023 Correction of Errors on Technical Specification Pages RS-23-083, Withdrawal - Proposed Alternatives Related to the Steam Generators2023-06-27027 June 2023 Withdrawal - Proposed Alternatives Related to the Steam Generators ML23156A6752023-06-20020 June 2023 Request for Withholding Information from Public Disclosure for Proposed Alternative to the Requirements for Repair/Replacement of Saltwater System Buried Piping 2024-02-01
[Table view] |
Text
-.-.--.-- -vs James A. Spina Vice President 0Constellation Energy" Nuclear Generation Group Calvert Cliffs Nuclear Power Plant, Inc.1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410.495.5200 410.495.3500 Fax February 17, 2009 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:
Document Control Desk
SUBJECT:
Calvert Cliffs Nuclear Power Plant Unit Nos. I & 2; Docket Nos. 50-317 & 50-318 Response to Request for Additional Information
-Measurement Uncertainty Recapture Power Uprate Power Plant, Unit Nos. I and 2 License Amendment for-Calvert Cliffs Nuclear
REFERENCES:
(a) Letter from Mr. D. R. Bauder (CCNPP) to Document Control Desk (NRC), dated August 29, 2008, License Amendment Request: Appendix K Measurement Uncertainty Recapture
-Power Uprate Request (b) Letter from Mr. D. V. Pickett (NRC) to Mr. J. A. Spina (CCNPP), dated October 3, 2008, Request for Additional Information Re: License Amendment for Measurement Uncertainty Recapture Power Uprate -Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2 (c) Letter from Mr. M. D. Flaherty (CCNPP) to Document Control Desk (NRC) dated December 29, 2008, Response to Request for Additional Information
-License Amendment for Measurement Uncertainty Recapture Power Uprate In Reference (a), Calvert Cliffs Nuclear Power Plant, Inc. submitted a license amendment request to the Nuclear Regulatory Commission (NRC) for a measurement uncertainty recapture power uprate for Calvert Cliffs Nuclear Power Plant, Units 1 and 2. In Reference (b) the NRC requested additional information to be submitted to support their review of the submittal.
Reference (c) contains Calvert Cliffs responses.
Following receipt of our responses, a phone call between NRC staff and Calvert Cliffs staff was conducted to clarify our response to RAI 2 (Reference c). Attachment (1) contains the clarifying information requested during the phone call with the NRC staff.Y1 00ý-Ia Document Control Desk February 17, 2009 Page 2 Should you have any questions regarding this matter, please contact Mr. Jay S. Gaines at (410) 495-5219.Very p STATE OF MARYLAND COUNTY OF CALVERT: TO WIT: I, James A. Spina, being duly sworn, state that I am Vice President
-Calvert Cliffs Nuclear Power Plant, Inc. (CCNPP), and that I am duly authorized to execute and file this License Amendment Request on behalf of CCNPP. To the best of my knowledge and belief, the statements contained in this document are true and correct. To the extent that these statements are not based on my personal knowledge, they are based upon information provided by other C(ENPP employees and/or consultants.
Such information has been reviewed in accordance with company practice and I believe it e iable.Subscribed and sworn before me, a Notary kEullic in and for the State of Maryland and County of ,_ 6,, __,this/7 daycof /--,_zge,-q
,2009.0a'-1C1'd'a WITNES"ST my inand-and Notarial Seal: My Commission Expires:// Notary P..efic Date JAS/KLG/bjd
Attachment:
(1) Response to Request for Additional Information
-Measurement Uncertainty Recapture Power Uprate cc: D. V. Pickett, NRC S, J. Collins, NRC Resident Inspector, NRC S. Gray, DNR ATTACHMENT (1)RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION
-MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE Calvert Cliffs Nuclear Power Plant, Inc.February 17,2009 ATTACHMENT (1)RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION
-MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE RAI 1: Recalculate the Reactor Vessel fluence values provided in Section IV 5 of Attachment 2 of Calvert Cliffs Measurement Uncertainty Recapture Evaluation LAR ofAugust 29,2008 in accordance with the guidance of Regulatory Guide 1.99.CCNPP Response: The below values were calculated in accordance with guidance of Regulatory Guide 1.99: Unit 1 Fluence Unit 1 Fluence Unit 2 Fluence Unit 2 Fluence 1.4% Power 1.4% Power Current UpaeCurrent Urt Uprate Uprate Vessel Clad 5.09E+19 5.11E+19 5.74E+19 5.79E+19 Interface 1/4 T Location 3.04E+19 3.05E+19 3.42E+19 3.45E+19 3/4 T Location 1.08E+19 1.08E+19 1.22E+19 1.23E+19 Note that this information may be different than the data used for reactor vessel surveillance capsule withdrawals and is subject to evaluation and re-calculation as necessary whenever new information is obtained (i.e., data obtained from future surveillance capsule withdrawals).
RAI 2: State whether Calvert Cliffs is in compliance with Regulatory Guide 1.190 in regards to the determination of reactor vessel neutonfluence values used in this submittal.
CCNPP Response: The determination of reactor vessel neutron fluence values was performed using methodologies that are consistent with the overall intent, although not the specific details, of Regulatory Guide 1.190 (Reference 1).For Calvert Cliffs Unit 1, the current dosimetry, neutron fluence, and radiation embrittlement results were documented in Babcock & Wilcox (B&W) Report BAW-2160 (Reference
- 3) and submitted to the Nuclear Regulatory Commission (NRC) via the correspondence of Reference
- 4. For Calvert Cliffs Unit 2, the current dosimetry, neutron fluence, and radiation embrittlement results were documented in B&W Report BAW-2199 (Reference
- 5) and submitted to the NRC via the correspondence of Reference 6.The surveillance capsule withdrawal schedules were determined via American Society for Testing and Materials (ASTM) E185 (Reference 7), while the neutron fast and total fluxes, neutron fast and total fluences, and the displacement per atom values of the surveillance specimens and the corresponding values for the reactor vessel were determined in accordance with the guidelines in ASTM E482 (Reference
- 8) and Regulatory Guide 1.99 (Reference 2). The DOT4 discrete ordinates transport code was used in R-theta (midplane) and R-Z coordinates using a P 3 expansion of the cross-section transfer matrix and flux moments, an S 8 r-theta quadrature, and a multi-group energy structure above 0.1 eV. The methodology employs absolute fluence calculations with documented and verified plant-specific data, local fission isotopics, and temperature-dependent water densities.
Note that Regulatory Guide 1.190 was issued seven years after Calvert Cliffs last surveillance capsule analysis.
Calvert Cliffs Nuclear Power Plant Units 1 and 2 surveillance capsules will be extracted in 2010 ATTACHMENT (1)RESPONSE TO REQUEST FOR ADDITIONAL INFORMATION
-MEASUREMENT UNCERTAINTY RECAPTURE POWER UPRATE and 2011, respectively; after which updated fluence analyses will be performed that conform to appropriate regulatory guidance.References
- 1. Regulatory Guide 1.190, March 2001, Calculational and Dosimetry Methods for Determining Pressure Vessel Neutron Fluence 2. Regulatory Guide 1.99 Revision 2, May 1988, Radiation Embrittlement of Reactor Vessel Materials 3. B&W Report BAW-2160, June 1993, Analysis of Capsule 970 BG&E CCNPP Unit No. 1 4. Letter from Mr. R. E. Denton (BG&E) to Document Control Desk (NRC), June 22, 1993, Analysis of the Calvert Cliffs Unit No. 1 Reactor Vessel Surveillance Capsule Withdrawn from the 970 Location 5. B&W Report BAW-2199, February 1994, Analysis of Capsule 970 BG&E CCNPP Unit No. 2 6. Letter from Mr. R. E. Denton (BGE) to Document Control Desk (NRC), March 18, 1994, Analysis of the Calvert Cliffs Unit No. 2 Reactor Vessel Surveillance Capsule Withdrawn from the 97'Location 7. ASTM E185-82, Standard Practice for Conducting Surveillance Tests for Light-Water Cooled Nuclear Power Reactor Vessels, E 706 8. ASTM E482-89, Standard Guide for Application of Neutron Transport Methods for Reactor Vessel Surveillance, E 706 2