Cooper Nuclear Station - Acceptance Review for License Amendment Request (TAC ME1388)
ML091670109
Person / Time
Site: Cooper Entergy icon.png
Issue date: 06/16/2009
From: Lyon C F
Watts Bar Special Projects Branch
To: VanDerKamp D
Nebraska Public Power District (NPPD)
Lyon C F (415-2296)
References
TAC ME1388
Download: ML091670109 (2)


Text

From: Lyon, Fred Sent: Tuesday, June 16, 2009 8:54 AM To: 'Van Der Kamp, David' Cc: 'Henry, Shawna L.'

Subject:

Acceptance Review (TAC No. ME1388)

By letter dated June 2, 2009, Nebraska Public Power District submitted a license amendment request to (1) delete Technical Specification (TS) Surveillance Requirement (SR) 3.1.3.2 and revise SR 3.1.3.3 in TS 3.1.3, "Control Rod OPERABILITY," and (2) revise Example 1.4-3 in Section 1.4, "Frequency," to clarify the applicability of the 1.25 surveillance test interval extension consistent with the model application provided in 72 FR 63935.

The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff

=s acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and follow as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it provides technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

E-mail Properties Mail Envelope Properties ()

Subject:

Acceptance Review (TAC No. ME1388)

Sent Date: 06/16/2009 8:45:40 AM Received Date: 06/16/2009 8:54:00 AM From: Lyon, Fred

Created By: Fred.Lyon@nrc.gov

Recipients:

dwvande@nppd.com ('Van Der Kamp, David')

Tracking Status: None slhenry@nppd.com ('Henry, Shawna L.') Tracking Status: None

Post Office:

Files Size Date & Time

MESSAGE 9986 06/16/2009

Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False

Sensitivity: olNormal Recipients received: