|
---|
Category:Letter
MONTHYEARGO2-24-110, Summary of Changes and Analysis for Revision 45 of Plant Procedures Manual 13.4.1, Emergency Notification2024-11-0404 November 2024 Summary of Changes and Analysis for Revision 45 of Plant Procedures Manual 13.4.1, Emergency Notification GO2-24-109, Summary of Changes and Analysis for Revision 42 of Plant Procedures Manual 13.8.1, Emergency Dose Projection System Operations2024-11-0404 November 2024 Summary of Changes and Analysis for Revision 42 of Plant Procedures Manual 13.8.1, Emergency Dose Projection System Operations ML24290A1142024-10-17017 October 2024 CGS FPTI 2024011 GO2-24-088, Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-24024 September 2024 Supplement to Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan GO2-24-051, Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements2024-09-23023 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24247A1572024-09-12012 September 2024 Withholding Determination Letter for Presentation Materials for Energy Northwest Pre-application Meeting 8-9-2024 ML24255A1012024-09-12012 September 2024 Request for Withholding Information from Public Disclosure Energy Northwest Regulatory Engagement Plan, Revision 0 GO2-24-082, Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan2024-09-10010 September 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Columbia Emergency Plan IR 05000397/20240052024-08-22022 August 2024 Updated Inspection Plan for Columbia Generating Station (Report 05000397/2024005) IR 07200035/20244012024-08-19019 August 2024 Security Baseline Inspection Report 07200035/2024401 IR 05000397/20244022024-08-13013 August 2024 Security Baseline Inspection Report 05000397/2024402 IR 05000397/20240022024-08-0909 August 2024 Integrated Inspection Report 05000397/2024002 GO2-24-060, Reply to a Notice of Violation, EA-21-170 and EA-23-0542024-07-30030 July 2024 Reply to a Notice of Violation, EA-21-170 and EA-23-054 GO2-24-070, Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program2024-07-29029 July 2024 Response to Request for Additional Information Regarding Fifth Interval Inservice Testing Program GO2-24-063, Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan2024-07-15015 July 2024 Notification of Extension to Columbias Fourth 10-Year Interval Inservice Testing Program Plan IR 05000397/20240122024-07-10010 July 2024 – Safety Conscious Work Environment Issue of Concern Follow-up Inspection 05000397/2024012 ML24180A1482024-06-28028 June 2024 Notification of an NRC Fire Protection Baseline Inspection (NRC Inspection Report 05000397/2024011) and Request for Information IR 05000397/20244202024-06-27027 June 2024 – Security Baseline Inspection Report 05000397 2024420 Cover Letter GO2-24-057, Notice of Readiness for Supplemental Inspection2024-06-19019 June 2024 Notice of Readiness for Supplemental Inspection ML24099A2232024-06-12012 June 2024 Issuance of Amendment No. 275 to Adopt TSTF-230, Revision 1, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling GO2-24-056, Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing2024-06-11011 June 2024 Relief Request for the Columbia Generating Station Fourth Ten-Year Interval Inservice Testing ML24128A2242024-05-31031 May 2024 Issuance of Amendment No. 274 to Revise Technical Specifications to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-13013 May 2024 2023 Annual Radiological Environmental Operating Report GO2-24-050, Annual Environmental Operating Report2024-04-30030 April 2024 Annual Environmental Operating Report IR 05000397/20240012024-04-24024 April 2024 Integrated Inspection Report 05000397/2024001 GO2-24-042, 2023 Annual Radioactive Effluent Release Report2024-04-22022 April 2024 2023 Annual Radioactive Effluent Release Report ML24089A2282024-04-15015 April 2024 – Acceptance of Requested Licensing Action License Amendment Request to Revise Columbia Generating Station Emergency Plan ML24074A4532024-04-11011 April 2024 Request for Withholding Information from Public Disclosure GO2-24-044, Voluntary Response to Regulatory Issue Summary 2024-012024-04-11011 April 2024 Voluntary Response to Regulatory Issue Summary 2024-01 IR 05000397/20244012024-04-0202 April 2024 – Security Baseline Inspection Report 05000397/2024401 (Cover Letter Only) IR 05000397/20244032024-03-28028 March 2024 Request for the Cybersecurity Baseline Inspection, Notification to Perform Inspection 05000397/2024403 GO2-24-034, Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan2024-03-20020 March 2024 Supplement to License Amendment Request to Revise Columbia Generating Station Emergency Plan ML24058A0692024-03-14014 March 2024 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment Request for Emergency Plan GO2-24-041, Level of Financial Protection - Annual Reporting Requirement2024-03-12012 March 2024 Level of Financial Protection - Annual Reporting Requirement ML24044A0492024-03-12012 March 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0064 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) GO2-24-039, Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.462024-03-11011 March 2024 Report of Changes or Errors in Emergency Core Cooling System Loss of Coolant Accident Analysis Models Pursuant to 10 CFR 50.46 GO2-24-036, Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate2024-03-11011 March 2024 Presentation Information for Pre-Application Meeting Regarding Columbia’S Replacement Steam Dryer Evaluation Approach for Extended Power Uprate ML24047A0422024-03-0707 March 2024 Issuance of Amendment No. 273 Renewed Facility Operating License and Technical Specification Clean Up IR 05000397/20230062024-02-28028 February 2024 Annual Assessment Letter for Columbia Generating Station (Report 05000397/2023006) IR 05000397/20253012024-02-14014 February 2024 Notification of NRC Initial Operator Licensing Examination 05000397/2025301 GO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan IR 05000397/20230042024-01-29029 January 2024 Integrated Inspection and Independent Spent Fuel Storage Installation Report 05000397/2023004 and 07200035/2023001 GO2-24-003, Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing2024-01-29029 January 2024 Relief Requests for the Columbia Generating Station Fifth Ten-Year Interval Inservice Testing 05000397/LER-2024-001, Failure to Track Operability of Requirements of Transversing In-Core Probe Valves2024-01-22022 January 2024 Failure to Track Operability of Requirements of Transversing In-Core Probe Valves GO2-24-014, Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2024-01-15015 January 2024 Independent Spent Fuel Storage Installation, Supplement to Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML24011A1522024-01-10010 January 2024 March 2024 Emergency Preparedness Exercise Inspection-Request for Information GO2-24-005, Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-1702024-01-0808 January 2024 Docket No. 50-397 Supplement to Reply to a Notice of Violation; EA-21-170 GO2-23-136, Guarantee of Payment of Deferred Premium2023-12-20020 December 2023 Guarantee of Payment of Deferred Premium GO2-23-130, Reply to a Notice of Violation; EA-23-0542023-12-14014 December 2023 Reply to a Notice of Violation; EA-23-054 GO2-23-135, Notice of Readiness for Supplemental Inspection2023-12-14014 December 2023 Notice of Readiness for Supplemental Inspection 2024-09-24
[Table view] Category:License-Application for Facility Operating License (Amend/Renewal) DKT 50
MONTHYEARGO2-24-051, Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements2024-09-23023 September 2024 Application to Revise Technical Specifications to Adopt TSTF-592, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24047A0422024-03-0707 March 2024 Issuance of Amendment No. 273 Renewed Facility Operating License and Technical Specification Clean Up GO2-24-004, License Amendment Request to Revise Emergency Plan2024-01-30030 January 2024 License Amendment Request to Revise Emergency Plan GO2-23-107, Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation2023-12-0505 December 2023 Application to Revise Technical Specifications to Adopt TSTS-584, Eliminate Automatic RWCU System Isolation on SLC Initiation GO2-23-056, Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling2023-08-29029 August 2023 Application to Revise Technical Specifications to Adopt TSTF-230, Add New Condition B to LCO 3.6.2.3, RHR Suppression Pool Cooling GO2-23-012, Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2023-03-27027 March 2023 Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-035, Supplement to License Amendment Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-03-0909 March 2023 Supplement to License Amendment Request to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling GO2-22-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Colling Using the Consolidated Line Item Improvement Process2022-05-25025 May 2022 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Colling Using the Consolidated Line Item Improvement Process GO2-22-001, License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2022-02-0303 February 2022 License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b GO2-21-133, License Amendment Request to Adopt 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2021-11-0909 November 2021 License Amendment Request to Adopt 10 CFR 50.69, Risk Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors GO2-21-016, License Amendment Request to Change Technical Specification 3.4.11 Reactor Coolant System Pressure and Temperature Limits2021-10-13013 October 2021 License Amendment Request to Change Technical Specification 3.4.11 Reactor Coolant System Pressure and Temperature Limits GO2-21-042, License Amendment Request to Adopt TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement2021-05-0808 May 2021 License Amendment Request to Adopt TSTF-546, Revise APRM Channel Adjustment Surveillance Requirement GO2-20-104, On-Site Cooling System Sediment Disposal2020-12-21021 December 2020 On-Site Cooling System Sediment Disposal GO2-20-108, License Amendment Request to Adopt TSTF-439, Elinate Second Completion Times Limitng Time from Discovery of Failure to Meet an LCO2020-12-0202 December 2020 License Amendment Request to Adopt TSTF-439, Elinate Second Completion Times Limitng Time from Discovery of Failure to Meet an LCO GO2-20-095, Application to Revise Technical Specifications to Adopt TSTF-582, 'Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements2020-09-24024 September 2020 Application to Revise Technical Specifications to Adopt TSTF-582, 'Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements GO2-20-063, Exigent License Amendment Request for Extension of Implementation Period for Amendment 255 Change to Control Room Air Conditioning System2020-04-15015 April 2020 Exigent License Amendment Request for Extension of Implementation Period for Amendment 255 Change to Control Room Air Conditioning System GO2-20-052, Exigent License Amendment Request for One-Time Change to Completion Times for Inoperable Electrical Distribution Systems2020-04-15015 April 2020 Exigent License Amendment Request for One-Time Change to Completion Times for Inoperable Electrical Distribution Systems GO2-20-004, Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR2020-01-27027 January 2020 Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR GO2-20-008, License Amendment Request to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process2020-01-27027 January 2020 License Amendment Request to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process GO2-19-090, License Amendment Request to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2019-08-15015 August 2019 License Amendment Request to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program GO2-19-053, License Amendment Request to Remove Operating License Condition 2.C.(11) and Attachment 32019-03-27027 March 2019 License Amendment Request to Remove Operating License Condition 2.C.(11) and Attachment 3 GO2-19-027, License Amendment Request for Licensing Basis Change to Control Room Air Conditioning System2019-02-25025 February 2019 License Amendment Request for Licensing Basis Change to Control Room Air Conditioning System GO2-17-137, License Amendment Request to Update Appendix B to the Renewed Facility Operating License to Incorporate 2017 Biological Opinion2017-12-18018 December 2017 License Amendment Request to Update Appendix B to the Renewed Facility Operating License to Incorporate 2017 Biological Opinion GO2-17-181, License Amendment Request to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements2017-12-12012 December 2017 License Amendment Request to Revise Technical Specifications to Adopt TSTF-551, Revise Secondary Containment Surveillance Requirements GO2-17-038, License Amendment Request to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control.2017-10-23023 October 2017 License Amendment Request to Revise Technical Specifications to Adopt TSTF-542, Reactor Pressure Vessel Water Inventory Control. GO2-17-028, License Amendment Request for Change to Technical Specification 3.5.1, ECCS-Operating.2017-07-25025 July 2017 License Amendment Request for Change to Technical Specification 3.5.1, ECCS-Operating. GO2-17-009, License Amendment Request - Revise Technical Specification 5.5.12 for Permanent Extension of Type a Test and Type C Leak Rate Test Frequencies2017-03-27027 March 2017 License Amendment Request - Revise Technical Specification 5.5.12 for Permanent Extension of Type a Test and Type C Leak Rate Test Frequencies GO2-17-062, License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Revision 22017-03-27027 March 2017 License Amendment Request to Revise Technical Specifications to Adopt TSTF-523, Revision 2 GO2-16-119, License Amendment Request for One-Time 7 Day Extension of Completion Time for TS Condition 3.5.1.A, 3.6.1.5.A, and 3.6.2.3.A2016-11-0808 November 2016 License Amendment Request for One-Time 7 Day Extension of Completion Time for TS Condition 3.5.1.A, 3.6.1.5.A, and 3.6.2.3.A ML16243A5152016-08-30030 August 2016 License Amendment Request for Reclassifying Quality Group of Low Temperature Portions of Reactor Water Cleanup System ML16244A8332016-08-30030 August 2016 License Amendment Request for Reclassifying Quality Group of Low Temperature Portions of Reactor Water Cleanup System - Drawing M523-1-3, Revision 10, Flow Diagram Reactor Water Clean-up System Radwaste Bldg. ML16210A5282016-07-28028 July 2016 Request for Amendment to Emergency Plan GO2-16-087, License Amendment Request for Changes to Technical Specification 2.1.1, Reactor Core SLs2016-07-12012 July 2016 License Amendment Request for Changes to Technical Specification 2.1.1, Reactor Core SLs GO2-16-096, License Amendment Request to Revise Operating License and Technical Specifications for Measurement Uncertainty Recapture Power Uprate2016-06-28028 June 2016 License Amendment Request to Revise Operating License and Technical Specifications for Measurement Uncertainty Recapture Power Uprate GO2-16-079, Erratum for License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 and SR 3.4.4.1 Safety/Relief Valves (Srvs) Setpoint Lower Tolerance2016-05-18018 May 2016 Erratum for License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 and SR 3.4.4.1 Safety/Relief Valves (Srvs) Setpoint Lower Tolerance GO2-16-046, License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 and SR 3.4.4.1 Safety/Relief Valves (Srvs) Setpoint Lower Tolerance2016-05-10010 May 2016 License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 and SR 3.4.4.1 Safety/Relief Valves (Srvs) Setpoint Lower Tolerance GO2-16-047, License Amendment Request to Revise Technical Specifications to Adopt TSTF-522, Revision 02016-03-0303 March 2016 License Amendment Request to Revise Technical Specifications to Adopt TSTF-522, Revision 0 GO2-15-070, Application for Technical Specification Change (TSTF-427) to Add LCO 3.0.9 on the Unavailability of Barriers Using the Consolidated Line Item Improvement Process2015-09-0202 September 2015 Application for Technical Specification Change (TSTF-427) to Add LCO 3.0.9 on the Unavailability of Barriers Using the Consolidated Line Item Improvement Process GO2-16-112, License Amendment Request for Reclassifying Quality Group of Low Temperature Portions of Reactor Water Cleanup System - Drawing M523-3, Revision 10, Flow Diagram Reactor Water Clean-up System Radwaste Bldg.2015-06-17017 June 2015 License Amendment Request for Reclassifying Quality Group of Low Temperature Portions of Reactor Water Cleanup System - Drawing M523-3, Revision 10, Flow Diagram Reactor Water Clean-up System Radwaste Bldg. GO2-15-075, Exigent License Amendment Request - Extension of Implementation Period for Amendment 232 Changing Technical Specification Table 3.3.1.1-1 Function 7 Scram Discharge Volume Water Level-High.2015-05-15015 May 2015 Exigent License Amendment Request - Extension of Implementation Period for Amendment 232 Changing Technical Specification Table 3.3.1.1-1 Function 7 Scram Discharge Volume Water Level-High. GO2-15-007, License Amendment Request for Adoption of Technical Specification Task Force Traveler-425, Revision 32015-03-17017 March 2015 License Amendment Request for Adoption of Technical Specification Task Force Traveler-425, Revision 3 ML14336A0062014-11-17017 November 2014 License Amendment Request for Technical Specification Change to Safety Limit Minimum Critical Power Ratio ML14268A2332014-09-0404 September 2014 Erratum for License Amendment Request for Adoption of Technical Specifications Task Force (TSTF) Traveler TSTF-423, Revision 1, Using the Consolidated Line Item Improvement Process GO2-14-126, License Amendment Request to Revise Technical Specification Surveillance Requirement for the Ultimate Heat Sink2014-08-22022 August 2014 License Amendment Request to Revise Technical Specification Surveillance Requirement for the Ultimate Heat Sink ML14234A4572014-08-12012 August 2014 License Amendment Request for Adoption of Technical Specification Task Force (TSTF) Traveler TSTF-423, Revision 1, Using the Consolidated Line Item Improvement Process GO2-14-103, Proposed Revision to License Amendment Request to Adopt TSTF-493, Revision 4, Option a, and Response to Request for Additional Information2014-06-19019 June 2014 Proposed Revision to License Amendment Request to Adopt TSTF-493, Revision 4, Option a, and Response to Request for Additional Information ML14086A3892014-03-18018 March 2014 License Amendment Request to Revise Technical Specifications to Adopt TSTF-535, Revision 0 ML13316A0092013-10-31031 October 2013 License Amendment Request for Change to Emergency Core Cooling Systems Surveillance Requirements GO2-13-138, License Amendment Request for Adoption of TSTF-493, Revision 4, Option a2013-10-0202 October 2013 License Amendment Request for Adoption of TSTF-493, Revision 4, Option a ML13247A6592013-07-25025 July 2013 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF 477, Revision 3 2024-09-23
[Table view] Category:Technical Specifications
MONTHYEARML24128A2242024-05-31031 May 2024 Issuance of Amendment No. 274 to Revise Technical Specifications to Adopt TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation ML23288A0002023-12-0707 December 2023 Issuance of Amendment No. 272 to Adopt TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position GO2-23-012, Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2023-03-27027 March 2023 Application to Revise Technical Specifications to Adopt Tstf-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML22308A0962022-12-15015 December 2022 Issuance of Amendment No. 269 License Amendment to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors ML21053A3162021-03-0303 March 2021 Issuance of Amendment No. 264 to Revise Technical Specification to Adopt Traveler TSTF-582, Revision 0, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements ML21005A1782021-01-25025 January 2021 Issuance of Amendment No. 263 to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems Using the Consolidated Line Item Improvement Process ML20242A0022020-09-0404 September 2020 Issuance of Amendment No. 261 Revise Technical Specification 3.8.7, Distribution Systems - Operating (Exigent Circumstances) ML20135H0842020-06-29029 June 2020 Issuance of Amendment No. 260 Revise Technical Specifications to Adopt TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program ML20125A0802020-05-12012 May 2020 Issuance of Amendment No. 258 Changes to Technical Specification Limiting Conditions for Operation 3.8.4 and 3.8.7 (Exigent Circumstances) ML18100A1992018-05-0202 May 2018 Issuance of Amendment No. 249 Change to Technical Specification 3.5.1 ECCS - Operating (CAC No. MG0015; EPID L-2017-LLA-0277) GO2-17-124, Final Technical Specification Markup and Clean Pages for Application to Revise Technical Specifications to Adopt TSTF-545, Revision 32017-07-0505 July 2017 Final Technical Specification Markup and Clean Pages for Application to Revise Technical Specifications to Adopt TSTF-545, Revision 3 ML0531303192017-07-0505 July 2017 Current Facility Operating License NPF-21, Technical Specifications, Revised 11/01/2017 ML17095A1172017-05-11011 May 2017 Columbia Generating Station - Issuance Of Amendment No. 241 Re: Measurement Uncertainty Recapture (CAC No. MF8060) GO2-16-071, Final Technical Specification Markup and Clean Pages for License Amendment Request to Adopt Technical Specification Task Force (TSTF)-425, Revision 3 to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program2016-05-11011 May 2016 Final Technical Specification Markup and Clean Pages for License Amendment Request to Adopt Technical Specification Task Force (TSTF)-425, Revision 3 to Relocate Specific Surveillance Frequencies to a Licensee Controlled Program ML15216A2662016-02-0303 February 2016 Issuance of Amendment No. 236, Adoption of Technical Specification Task Force Traveler TSTF-423, Revision 1, Technical Specifications End States, as Part of Consolidated Line Item Improvement Process GO2-15-173, Supplement to Response to Second Request for Additional Information on License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-425, Revision 32015-12-28028 December 2015 Supplement to Response to Second Request for Additional Information on License Amendment Request for Adoption of Technical Specification Task Force (TSTF)-425, Revision 3 ML15154A8002015-06-11011 June 2015 Issuance of Amendment No. 235, Extension of Implementation Period for Amendment 232 Changing Technical Specification Table 3.3.1.1-1, Function 7, Scram Discharge Volume Water Level - High (Exigent Circumstances) ML15076A1222015-04-15015 April 2015 Issuance of Amendment No. 233, Request to Revise Technical Specification Surveillance Requirement 3.7.1.1 Related to the Ultimate Heat Sink ML15030A5012015-02-0101 February 2015 Issuance of Amendment No. 230, Revise Technical Specifications for One-Time Extension of Completion Time Required Actions Related to Residual Heat Removal System B Inoperability (Emergency Circumstances) ML15031A0022015-01-30030 January 2015 Emergency License Amendment Associated with Technical Specifications 3.5.1.A, 3.6.1.5.A, and 3.6.2.3.A, Request for CT Extension on RHR-B Inoperability ML14335A1892015-01-0707 January 2015 Redacted, Issuance of Amendment No. 229, Revise Emergency Core Cooling Systems Surveillance Requirements for Low Pressure Core Spray and Low Pressure Coolant Injection Pump Flows ML14290A3602014-11-12012 November 2014 Issuance of Amendment No. 228, Request to Adopt Technical Specification Task Force (TSTF)-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs ML14127A4002014-06-13013 June 2014 Request for Technical Specification Interpretation Regarding the Offsite Power Supplies to the Onsite Class 1E Alternating Current Power Distribution System GO2-14-043, License Amendment Request for Changing Technical Specification Table 3.3.1.1-1 Function 7, Scram Discharge Volume Water Level-High2014-03-24024 March 2014 License Amendment Request for Changing Technical Specification Table 3.3.1.1-1 Function 7, Scram Discharge Volume Water Level-High GO2-12-104, Response to Request for Additional Information for License Amendment Request to Make Administrative and Editorial Changes to Technical Specifications and the Operating License2012-07-30030 July 2012 Response to Request for Additional Information for License Amendment Request to Make Administrative and Editorial Changes to Technical Specifications and the Operating License GO2-12-003, License Amendment Request to Make Administrative and Editorial Changes to Technical Specifications and the Operating License2012-01-0909 January 2012 License Amendment Request to Make Administrative and Editorial Changes to Technical Specifications and the Operating License GO2-10-098, Request for Approval of the Cyber Security Plan2010-07-22022 July 2010 Request for Approval of the Cyber Security Plan ML1013903692010-05-11011 May 2010 Columbia Generating Station, License Amendment Request to Change Technical Specifications in Support of Prnm/Arts/Mella Implementation GO2-10-024, License Amendment Request to Change Technical Specifications Relating to Control Rod Operability and Control Rod Scram Accumulators2010-02-0808 February 2010 License Amendment Request to Change Technical Specifications Relating to Control Rod Operability and Control Rod Scram Accumulators GO2-09-043, Independent Spent Fuel Storage Installation - Offsite Dose Calculation Manual, Including Revision Made During 20082009-02-27027 February 2009 Independent Spent Fuel Storage Installation - Offsite Dose Calculation Manual, Including Revision Made During 2008 ML0823800182008-09-16016 September 2008 Tech Spec Pages for Amendment No. 209 TSTF-484, Use of TS 3.10.1 for Scram Time Testing Activities. ML0819005982008-09-15015 September 2008 Tech Spec Pages for Amendment No. 208 Adoption of Approved Generic Technical Specification Changes Associated with Containment Isolation Valves GO2-08-122, Supplement to Adoption of Approved Generic Technical Specification Changes Associated with Containment Isolation Valves2008-08-28028 August 2008 Supplement to Adoption of Approved Generic Technical Specification Changes Associated with Containment Isolation Valves ML0817702012008-06-30030 June 2008 Tech Spec Pages for Amendment No. 207 Control Room Habitability in Accordance with TSTF-448-A, Rev 3 ML0810602972008-04-15015 April 2008 License Page 3 and Technical Specification Page 10 for Amendment No. 206 Eliminate Condition 2.F GO2-07-156, Supplement to License Amendment Request for Proposed Changes to Technical Specifications: Miscellaneous Administrative Changes Including Adoption of Approved TSTF Travelers 284, 479, and 4852007-11-0606 November 2007 Supplement to License Amendment Request for Proposed Changes to Technical Specifications: Miscellaneous Administrative Changes Including Adoption of Approved TSTF Travelers 284, 479, and 485 ML0703802052007-02-27027 February 2007 License and Technical Spec Pages - Amendment No. 202 Under Exigent Circumstances TS 3.6.1.7, Suppression Chamber-to-Drywell Vacuum Breakers-Allow One-time Extension to Current Closure Verification SR ML0705203982007-02-13013 February 2007 Supplemental Information Regarding License Amendment Request to Technical Specifications Associated with AC and DC Electrical Power ML0703000212007-02-0909 February 2007 Technical Specifications, Issuance of Amendment No. 201 to Facility Operating License Suppression Chamber-to-Drywell Vacuum Breakers and Drywell-to-Suppression Chamber Bypass Leakage Test ML0632800532006-11-27027 November 2006 Tech Spec Pages for Amendment 199 Changes to Technical Specifications to Replace the Current Accident Source Term Used in Design Basis Radiological Analyses ML0624301412006-07-11011 July 2006 Issuance of Technical Specification Pages Re Inoperability of Snubbers GO2-06-060, Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers (TSTF-372) Using the Consolidated Line Item Improvement Process2006-04-17017 April 2006 Application for Technical Specification Change to Add LCO 3.0.8 on the Inoperability of Snubbers (TSTF-372) Using the Consolidated Line Item Improvement Process ML0610202712006-03-13013 March 2006 E-mail 3/13/2006 - Clean TS Pages for DG AOT ML0630400372005-12-0808 December 2005 Technical Specifications, One Time Extension of the 72- Hour Completion Time (CT) for the Required Action of Condition B Technical Specification (TS) 3.7.1 ML0534101872005-12-0808 December 2005 Issuance of Amendment One Time Extension of the 72- Hour Completion Time (CT) for the Required Action of Condition B Technical Specification (TS) 3.7.1 TAC No. MC8421 GO2-05-186, Supplement to the License Amendment Request for a One-Time Change to Technical Specifications2005-11-30030 November 2005 Supplement to the License Amendment Request for a One-Time Change to Technical Specifications ML0527300232005-09-29029 September 2005 Tech Spec Pages for Amendment 194 Regarding Technical Specification Improvement to Revise Control Rod Scram Time Testing Frequency Using the Consolidated Line Item Improvement Process GO2-05-099, License Amendment Request to Technical Specifications Associated with AC and DC Electrical Power2005-05-31031 May 2005 License Amendment Request to Technical Specifications Associated with AC and DC Electrical Power ML0513602142005-05-12012 May 2005 Technical Specification Pages Reactor Coolant System (RCS) Pressure and Temperature Limits (Tac. MC3591) ML0510301872005-04-12012 April 2005 Technical Specifications, One-Time Extension of Appendix J Type a Integrated Leakage Rate Test Interval 2024-05-31
[Table view] |
Text
Dale K. Atkinson ENE G Vice President, Operational Support NERGYiESTaP.O.
Box 968,PE0-NORTRichland, WA 99352-0968 Ph. 509.377.4302 1 F. 509.377.4098 dkatkinson
@ energy-northwest.com July 22, 2010 G02-10-098 10 CFR 73.54 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001
Subject:
COLUMBIA GENERATING STATION, DOCKET NO. 50-397 REQUEST FOR APPROVAL OF THE COLUMBIA GENERATING STATION CYBER SECURITY PLAN
References:
- 1) Letter G02-09-153 dated November 16, 2009, DK Atkinson (Energy Northwest) to NRC, "Request for Approval of the Columbia Generating Station Cyber Security Plan" 2) NRC Letter dated May 24, 2010, CF Lyon (NRC) to JV Parrish (Energy Northwest), "Columbia Generating Station -License Amendment Request for Approval of the Cyber Security Plan (TAC No. ME2624)" 3) NEI 08-09 Revision 6, "Cyber Security Plan for Nuclear Power Reactors," April 2010 4) NRC Letter dated June 7, 2010, RP Correia (NRC) to CE Earls (NEI),"Nuclear Energy Institute 08-09, 'Cyber Security Plan Template, Rev. 6"'
Dear Sir or Madam:
As requested in Reference 2, Energy Northwest hereby withdraws the Reference 1 Cyber Security Plan application and submits a revised Cyber Security Plan application based on Reference 3 with a Reference 4 definition for cyber attack.In accordance with the provisions of Section §73.54 Title 10 of the Code of Federal Regulations (10 CFR) and Reference 2, Energy Northwest is submitting, as specified in§50.4 and §50.90, a request for an amendment to the Facility Operating License (FOL)for Columbia Generating Station (CGS). This proposed amendment requests Nuclear Regulatory Commission (NRC) approval of the CGS Cyber Security Plan, provides an Implementation Schedule, and proposes a revision to the existing FOL Physical Protection license condition 2.E to require Energy Northwest to fully implement and maintain in effect all provisions of the Commission approved CGS Cyber Security Plan.
REQUEST FOR APPROVAL OF THE COLUMBIA GENERATING STATION CYBER SECURITY PLAN Page 2 Enclosure 1 provides an evaluation of the proposed change and contains the following attachments: " Attachment 1 provides a marked-up page showing the proposed FOL change." Attachment 2 provides the proposed FOL change in final typed format.Enclosure 2 provides a copy of the CGS Cyber Security Plan which is a stand alone document that will be incorporated by reference into the CGS Physical Security Plan upon the staff's approval.
Enclosure 3 provides a copy of the CGS Cyber Security Plan Implementation Schedule and describes commitments made in this submittal.
Energy Northwest requests that Enclosure 2 and Enclosure 3, which contain security sensitive information, be withheld from public disclosure in accordance with 10 CFR 2.390.Enclosure 4 provides a table which lists the CGS Cyber Security Plan deviations from the Reference 3 template.In accordance with 10 CFR 50.91, a copy of this application, with attachments, is being provided to the designated Washington State Official.If you should have any questions regarding this submittal, please contact Mr. DW Gregoire at (509) 377-8616.I declare under penalty of perjury that the foregoing is true and correct. Executed on the date of this letter.Respectfully, DK Atkinson Vice President, Operational Support
Enclosures:
- 1) Evaluation of Proposed Change 2) Cyber Security Plan for Columbia Generating Station (Security-Related Information
-Withhold Under 10 CFR 2.390)3) Columbia Generating Station Cyber Security Plan Implementation Schedule (Security-Related Information
-Withhold Under 10 CFR 2.390)4) Columbia Generating Station Deviations from NEI 08-09, Revision 6 cc: NRC RIV Regional Administrator NRC NRR Project Manager NRC Senior Resident Inspector/988C RN Sherman -BPA/1 399 WA Horin -Winston & Strawn EFSEC Manager RR Cowley -WDOH REQUEST FOR APPROVAL OF THE COLUMBIA GENERATING STATION CYBER SECURITY PLAN Enclosure 1 Page 1 of 7 Evaluation of Proposed Change
Subject:
Request for Approval of the Columbia Generating Station Cyber Security Plan 1.0
SUMMARY
DESCRIPTION 2.0 DETAILED DESCRIPTION 3.0 TECHNICAL EVALUATION
4.0 REGULATORY EVALUATION
5.0 ENVIRONMENTAL CONSIDERATION
6.0 REFERENCES
ATTACHMENTS Attachment 1 -Marked-up Page Showing the Proposed FOL Change.Attachment 2 -Proposed FOL Change in Final Typed Format REQUEST FOR APPROVAL OF THE COLUMBIA GENERATING STATION CYBER SECURITY PLAN Enclosure 1 Page 2 of 7 1.0
SUMMARY
DESCRIPTION The proposed license amendment request (LAR) includes the proposed Columbia Generating Station (CGS) Cyber Security Plan, an Implementation Schedule, and a proposed revision to the existing Facility Operating License (FOL) Physical Protection license condition.
2.0 DETAILED DESCRIPTION The proposed LAR includes four parts: 1) the proposed Plan, 2) an Implementation Schedule, 3) a table listing deviations from Nuclear Energy Institute (NEI) 08-09, Revision 6 (Reference 3), and 4) a proposed revision to the existing FOL Physical Protection license condition 2.E to require Energy Northwest to fully implement and maintain in effect all provisions of the Commission approved CGS Cyber Security Plan as required by Section §73.54 of Title 10 of the Code of Federal Regulations (10 CFR).The regulations in 10 CFR 73.54, "Protection of digital computer and communication systems and networks," (Rule) establish the requirements for a cyber security program.This regulation specifically requires each licensee currently licensed to operate a nuclear power plant under Part 50 of this chapter to submit a cyber security plan that satisfies the requirements of the Rule. Each submittal must include a proposed'implementation schedule and implementation of the licensee's cyber security program',must be consistent with the approved schedule.
The background for this application is addressed by the NRC final rule change published on March 27, 2009 (Reference 1).3.0 TECHNICAL EVALUATION Cyber security requirements are codified as new §73.54 and are designed to provide high assurance that digital computer and communication systems and networks are adequately protected against cyber attacks up to and including the design basis threat established by §73.1 (a)(1)(v).
These requirements are substantial improvements upon the requirements imposed by EA-02-026 (Reference 2).The LAR includes the proposed Plan (Enclosure
- 2) that conforms to the template provided in Appendix A of NEI 08-09, Revision 6 and a table listing deviations from the template (Enclosure 4). In addition, the LAR includes the proposed revision to the existing FOL license condition for "Physical Protection" (Attachments 1 and 2). Finally, the LAR contains the proposed Implementation Schedule (Enclosure
- 3) as required by 10 CFR 73.54.
4.0 REGULATORY EVALUATION
4.1 Applicable Regulatory Requirements/Criteria The LAR is submitted pursuant to 10 CFR 73.54 which requires licensees currently licensed to operate a nuclear power plant under 10 CFR Part 50 to submit a Cyber Security Plan as specified in §50.4 and §50.90.
REQUEST FOR APPROVAL OF THE COLUMBIA GENERATING STATION CYBER SECURITY PLAN Enclosure 1 Page 3 of 7 4.2 Significant Hazards Consideration Energy Northwest has evaluated whether or not a significant hazards consideration is involved with the proposed amendment by focusing on the three standards set forth in 10 CFR 50.92, "Issuance of amendment," as discussed below: 1) Does the proposed amendment involve a significant increase in the probability or consequences of an accident previously evaluated?
Response:
No.The proposed amendment incorporates a new requirement in the FOL to implement and maintain a Cyber Security Plan as part of Energy Northwest's overall program for physical protection of CGS. Inclusion of the CGS Cyber Security Plan in the FOL itself does not involve any modifications to any safety-related structures, systems or components (SSCs). Rather, the CGS Cyber Security Plan describes how the requirements of 10 CFR 73.54 are to be implemented to identify, evaluate, and mitigate cyber attacks up to and including the design basis cyber attack threat, thereby achieving high assurance that CGS's digital computer and communications systems and networks are protected from cyber attacks. The CGS Cyber Security Plan will not alter previously evaluated Final Safety Analysis Report (FSAR) design basis accident analysis assumptions, add any accident initiators, or affect the function of the plant safety-related SSCs as to how they are operated, maintained, modified, tested, or inspected.
Therefore, the proposed change does not involve a significant increase in the probability or consequences of an accident previously evaluated.
- 2) Does the proposed amendment create the possibility of a new or different kind of accident from any accident previously analyzed?Response:
No.The proposed amendment provides assurance that safety-related SSCs are protected from cyber attacks. Implementation of 10 CFR 73.54 and the inclusion of a plan in the FOL do not result in the need for any new or different FSAR design basis accident analysis.
It does not introduce new equipment that could create a new or different kind of accident, and no new equipment failure modes are created. As a result, no new accident scenarios, failure mechanisms, or limiting single failures are introduced as a result of this proposed amendment.
Therefore, the proposed change does not create the possibility of a new or different kind of accident from any accident previously evaluated.
REQUEST FOR APPROVAL OF THE COLUMBIA GENERATING STATION CYBER SECURITY PLAN Enclosure 1 Page 4 of 7 3) Does the proposed amendment involve a significant reduction in a margin of safety?Response:
No.The margin of safety is associated with the confidence in the ability of the fission product barriers (i.e., fuel cladding, reactor coolant pressure boundary, and containment structure) to limit the level of radiation to the public. The proposed amendment would not alter the way any safety-related SSC functions and would not alter the way the plant is operated.
The amendment provides assurance that safety-related SSCs are protected from cyber attacks. The proposed amendment would not introduce any new uncertainties or change any existing uncertainties associated with any safety limit. The proposed amendment would have no impact on the structural integrity of the fuel cladding, reactor coolant pressure boundary, or containment structure.
Based on the above considerations, the proposed amendment would not degrade the confidence in the ability of the fission product barriers to limit the level of radiation to the public.Therefore, the proposed change does not involve a significant reduction in a margin of safety.Based on the above, Energy Northwest concludes that the proposed change presents no significant hazards consideration under the standards set forth in 10 CFR 50.92(c), and accordingly, a finding of no significant hazards consideration is justified.
4.3 Conclusion
Based on the considerations discussed above: (1) there is reasonable assurance that the health and safety of the public will not be endangered by operation in the proposed manner, (2) such activities will be conducted in compliance with the applicable regulations as identified herein, and (3) the issuance of the amendment will not be inimical to the common defense and security or to the health and safety of the public.5.0 ENVIRONMENTAL CONSIDERATION The proposed amendment establishes the licensing basis for a Cyber Security Program for CGS and will be a part of the Physical Security Plan. The proposed amendment would not change any requirements with respect to installation or use of a facility component located within CGS's restricted area, as defined in 10 CFR 20.1003.Accordingly, the proposed amendment does not involve: (1) a significant hazards consideration, (2) a significant change in the types or a significant increase in the amounts of any effluents that may be released offsite, or (3) a significant increase in individual or cumulative occupational radiation exposure.
The proposed amendment meets the criteria for categorical exclusion in accordance with 10 CFR 51.22(c) and no environmental impact statement or environmental assessment need be prepared in connection with the proposed amendment.
REQUEST FOR APPROVAL OF THE COLUMBIA GENERATING STATION CYBER SECURITY PLAN Enclosure 1 Page 5 of 7
6.0 REFERENCES
- 1. Federal Register Notice, Final Rule 10 CFR Part 73, Power Reactor Security Requirements, published on March 27, 2009, 74 FR 13926 2. EA-02-026, Order Modifying Licenses, Safeguards and Security Plan Requirements, issued February 25, 2002 3. NEI 08-09 Revision 6, "Cyber Security Plan for Nuclear Power Reactors," April 28, 2010 REQUEST FOR APPROVAL OF THE COLUMBIA GENERATING STATION CYBER SECURITY PLAN Enclosure 1 Page 6 of 7 Attachment 1 -Marked-up Page Showing the Proposed FOL Change 10-Dbý. EýXqmipti,ýons from certai r1n requi rements ofl Ap'pen~di .cqs, 0 l, H and J to 10 CER Pa t50, are descri`bed in the Safety Eval ion 'Rdprt. These iexemptions ,are authorized by law: and will not endanger liife or property or the 'common ,defenris.e ,arnd security and a~re othe~rwi:se in. th:.e public ifntere~st1..
Th;ef or e., thpese exmptions ar, granted pur;Suant tob 10' C.FR 50,12. With the.gran ti'ng of this :exempt.ion the, facili"y will operate to the ext.ent aut.horized, herein in conformity, wi'th the arplicaton as am'.ded te prOisinsO of the Act', an.'d the rules -ndo r.qu~ions of teq Comiil n.E,ý The l1icensee shaoll fully inip'lement and imain-ain in effect all pirovisions of tIhe CGommisionapproved securuty:
plan, Lra~i ning anod ua ificati'on pl0n anr ,d ,ýafroguai i1ý , I on, ngency p1 en, intl di nqý anrdeits ade pur ýýuarit to, provi si.ons: of the Mi Amendments add, Search Requ rements revi sions 1or1 0 R! 73 .55 (\1 27817 and 21822) and -o to e auihority of 10" CFR 50Q.90 aridt 1 0 CFR 509 5 p) .he .pl.IIan woiich c) rtri jns, Safegu a rds Tn formationi prottected under 10.CFR 73 .21 is entit1led::. uinbi a Genera,'ting Station Pys:ical' Secity : an -irainingý and Qualification Plan,'Safeguards
- contingency Plan ..ariO d ndepende;rit ,Spoent; Fuel Sto:rage Insitallati~ion P1a:n, Rpevision 3 ."ub it ted. May 18, 2006..F DeetedAdd.ý columbiau Generaiting Station cyberýi ecurity: planh, h e... 1 r ..h. .o o n a s p. b u t n ot l.a t.e r oG The I tod en P. .......... s 1 ( t it ý:siD ýrhann one hour_ of. ary at cl der t a'_ Ihi -i f Ic- iA'y wh.ich could reisult 1r an: unplaýnned release o'f quantities oF Fission. pyioduots, in excedss, of allowo.ble 1 imi ts fori norma,] ope o n.".ý,r ýestabl i,:shed t)y4yt C;i si ii 1 iidni.tH", the shall have.ad ma,~intafn f rancdjaT :protpect'i~on of sicph type: and in s'uch aambuntf as the Commiissi dn sha' requ'ii in accor adne* With e.1/2tcio n 1,70 of the.,Atomic Ene.rgy 'Act of 1954,. as amended, to cover public 'li ab.l]i',ti>y
'dl a ins., Strike out .206" Amendmrent No. 2_-8--& 06 Rv~ c~ ,20 REQUEST FOR APPROVAL OF THE COLUMBIA GENERATING STATION CYBER SECURITY PLAN Enclosure 1 Page 7 of 7 Attachment 2 -Proposed FOL Change in Final Typed Format-10 -U. Exemptions from certain requirements of Appendice.s , H and J teo IOCFR Part 50,,. are described in thle.Safety' Evaluation Report. These exemptions are authorized by law and will not.-endanger life or property or the common defense 'and security and areotherwiseih
- the public interest.
Therefore, thesel exemptions are 'her.eby granted pursuant .to 10 CQFR 50.12. W the granting of this exemption the faility will 'peorate, to the extent authorized hereein, in conformity with thei application, as amended, the provisions
ýof the Act, -and the rules: and regulations of Ithe ýCommission.
E.. The licensee shall fully implemenrt an~d mai ntain in effect all provisions., of the C6ornmission-'approved Colurnbia Generating Station cyber security plan, physical security plan, training and qualificatioh plan, and safeguards contingency plan, including amendments!
made pursuant io provisions otfthe Mi scel.laneo.us-Amendments
'and Search Requirements revi~sioins to '10 C.FR 73.55 (51 FR 27817 .and 278.22) and to the autho.rity of 10 CFR. 50.90 and 101CFR 50.54(p)., The plan, :whic co ntains Safeguairds Information protected under 10 CFR 73.21, is.entitled:
",Cblumbia Generating Station Physical.
Security Plan, Training and. Qualification Plan, Safeguards Contingency Plan, and Independe.nt Spent Fuel StoGrage Installation Plan, Revision 3T submitted May 1.8 , 2006,.F. Deleted.,-G, The licensee shall notify the Commission, soon as possible but not.later than one. hour-, of any accident :atthi s, facil!.ty whichco .ould result inan.unplanned release of quantities
- of fissionr products in excess, of allowable limits for normal operation established by the Commission.
H. Thel licenseeý shall have and maintain financial protection
- of such type and. in, such-amouints as the Commissioni.
shall .require in a'ccordance with Section 170 of the Atomic Energy Act of 1:954, as- amended,1 to cover public liabi/ity claims'..Amendment No. :7, 178, flcvizzd by lettcr dated FobruarY 2, 2007 REQUEST FOR APPROVAL OF THE COLUMBIA GENERATING STATION CYBER SECURITY PLAN Enclosure 4 Page 1 of 1 Columbia Generating Station Deviations from NEI 08-09, Revision 6 NEI 08-09 NEI 08-09 Wording CGS Deviation Location Appendix A, [Site/Licensee]
Energy Northwest acknowledges that the Section 1 acknowledges that the implementation of this plan does not alleviate 1st Paragraph implementation of this plan responsibility to comply with other NRC does not alleviate their regulations.
Deleted the word "their" for responsibility to comply with grammatical correctness.
other NRC regulations.
Appendix A, A Glossary of terms used This wording has been replaced with the Section 1 within this Plan and actual terms contained within NEI 08-09, 3 rd Paragraph Appendices of NEI 08-09, Revision 6, Appendix B. CGS has elected to Revision 6, is contained in incorporate the definitions directly into the Appendix B of NEI 08-09, Cyber Security Plan.Revision 6.Section 3.1.3 -Refer to NEI 08-09, Revision Refer to Section 1.3 for definition of Critical 1 st Bullet 6, Appendix B, Glossary for System. Maintains consistency of definition of Critical System. incorporating definitions directly.Section 3.1.3 -Refer to NEI 08-09, Revision Refer to Section 1.2 for definition of Critical 2 nd Bullet 6, Appendix B, Glossary for Digital Asset. Maintains consistency of definition of Critical System. incorporating definitions directly.Appendix B, Any event in which there is This term has been added as Section 1.4 in"Cyber Attack" reason to believe that an the plan and the wording has been changed adversary has committed or to read: caused, or attempted to commit or cause, or has Any event in which there is reason to believe made a credible threat to that an adversary has committed or caused, commit or cause malicious or attempted to commit or cause, or has exploitation of a SSEP made a credible threat to commit or cause function.
malicious exploitation of a CDA.Reference 1 below concluded that submission of the cyber security plan in accordance with NEI 08-09, Revision 6 with the exception ofttheh_definition of "cyber attack" would be acceptable.
Reference 2 provided the above wording as an acceptable definition of "cyber attack" which has been incorporated as Section 1.4 in this plan.
References:
1)NRC Letter dated May 24, 2010, CF Lyon (NRC) to JV Parrish (Energy Northwest), "Columbia Generating Station -License Amendment Request for Approval of the Cyber Security Plan (TAC No. ME2624)" 2) NRC Letter dated June 7, 2010, RP Correia (NRC) to CE Earls (NEI), "Nuclear Energy Institute 08-09, 'Cyber Security Plan Template, Rev. 6"'