2010/09/01 Watts Bar 2 OL - 9-01-10_ TVA Letter to NRC - RAI Responses - FSAR Section 3.11
ML102500170
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 09/01/2010
From:
- No Known Affiliation
To:
Division of Operating Reactor Licensing
References
Download: ML102500170 (7)


Text

1 WBN2Public Resource From: Hamill, Carol L [clhamill@tva.gov]

Sent: Wednesday, September 01, 2010 10:14 AM To: Wiebe, Joel; Raghavan, Rags; Milano, Patrick; Campbell, Stephen Cc: Crouch, William D; Boyd, Desiree L; Elton, Thomas L

Subject:

9-01-10_ TVA letter to NRC - RAI Responses - FSAR Section 3.11 Attachments:

9-01-10_ RAI Responses - FSAR Section 3.11.pdf Please see attached letter that was sent to NRC today.

Carol L. HamillLicensing/QualityAssuranceWBNUnit2Project,EQB1BWBN423 365 3177 423 3653833c c l l h h a a m m i i l l l l@@t t v v a a..g g o o v v Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 91 Mail Envelope Properties (25547F570B005144A141ECCA95DA1AB20CEDA3E6)

Subject:

9-01-10_ TVA letter to NRC - RAI Responses - FSAR Section 3.11 Sent Date: 9/1/2010 10:14:24 AM Received Date: 9/1/2010 10:14:56 AM From: Hamill, Carol L Created By: clhamill@tva.gov Recipients: "Crouch, William D" <wdcrouch@tva.gov> Tracking Status: None "Boyd, Desiree L" <dlboyd@tva.gov>

Tracking Status: None "Elton, Thomas L" <tlelton@tva.gov> Tracking Status: None "Wiebe, Joel" <Joel.Wiebe@nrc.gov> Tracking Status: None "Raghavan, Rags" <Rags.Raghavan@nrc.gov>

Tracking Status: None "Milano, Patrick" <Patrick.Milano@nrc.gov> Tracking Status: None "Campbell, Stephen" <Stephen.Campbell@nrc.gov> Tracking Status: None

Post Office: TVACOCXVS2.main.tva.gov Files Size Date & Time MESSAGE 220 9/1/2010 10:14:56 AM 9-01-10_ RAI Responses - FSAR Section 3.11.pdf 184702

Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:

U.S. Nuclear Regulatory Commission Page 2 September 1, 2010

Enclosure:

1. Response to RAI 3.11-2 cc (Enclosure): U. S. Nuclear Regulatory Commission Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 NRC Resident Inspector Unit 2 Watts Bar Nuclear Plant 1260 Nuclear Plant Road Spring City, Tennessee 37381 U.S. Nuclear Regulatory Commission Page 3 September 1, 2010 bcc (Enclosure):

Stephen Campbell U.S. Nuclear Regulatory Commission

MS 08H4A One White Flint North 11555 Rockville Pike Rockville, Maryland 20852-2738 Loren R. Plisco, Deputy Regional Administrator for Construction U. S. Nuclear Regulatory Commission

Region II Marquis One Tower 245 Peachtree Center Ave., NE Suite 1200 Atlanta, Georgia 30303-1257 ENCLOSURE 1 Response to RAI 3.11-2 Tennessee Valley Authority - Watts Bar Nuclear Plant - Unit 2, Docket No. 50-391 E1-1 3.11-2Confirm that equipment being replaced or refurbished will be qualified as Category 1 as required by 10 CFR 50.49.

Response:Replaced equipment is being procured qualified to the NUREG-0588, Category 1 requirements. A small population of components is being refurbished as follows: a. All 6.9 kV motors will be refurbished, but only one will be rewound. Refurbishment that will be performed is considered routine maintenance that does not impact qualification of the motors. The extent of refurbishment undertaken includes the Environmental Qualification (EQ) maintenance requirements as specified in the Qualification Maintenance Data Sheet (QMDS) contained in the applicable Environmental Qualification Data Package (EQDPs).

The refurbishment documentation--materials, process, and the work completion certification, is reviewed against the original qualification report of the motors; and the qualification of the refurbished motors is documented in the applicable EQDP. These Westinghouse motors were originally procured for Watts Bar

Unit 1 and Unit 2, and they are qualified to NUREG-0588, Category II (IEEE Standard 323-1971). Only one containment spray pump motor will be rewound; materials for this motor will be those qualified in the EPRI motor rewind test program, which meets the NUREG-0588, Category I criteria. The qualification will be documented in a new EQDP. b. Electrical Penetration Assemblies (EPA):

These EPAs are qualified to NUREG-0588, Category I. The Watts Bar Units 1 and 2 EPAs are of the identical design made by Conax Nuclear which were procured and installed around the same time period. Unit 2 is refurbishing the EPAs by replacing the missing and the damaged feedthrough modules with new ones of identical design and type and adding some new feedthrough modules qualified to NUREG-0588, Category I. c. Terminal Blocks The field walkdown has noted that the terminal blocks installed in the EQ application for Unit 2 are the GE make CR151B, which are qualified to NUREG-0588, Category I. Design modifications have been issued to inspect and replace the EQ terminal blocks that are found damaged or degraded with equivalent CR151B blocks.

ENCLOSURE 1 Response to RAI 3.11-2 Tennessee Valley Authority - Watts Bar Nuclear Plant - Unit 2, Docket No. 50-391 E1-2d. Main Steam Isolation Valves (MSIV) The original Unit 2 MSIVs are qualified to NUREG-0588, Category II. The MSIVs are being refurbished by replacing the missing subcomponents, including the solenoid valves, terminal blocks and manufacturing wiring with the components of the same make, model and type as supplied on the original Purchase Order. With the exception of the solenoid valves, the subcomponents will be qualified to NUREG-0588, Category I requirements. The solenoid

valves cannot be upgraded because these equivalent subcomponents are not available qualified to NUREG-0588, Category I requirements. e. Cables purchased on Contract 81K5-830078 TVA purchased identical cables under Rockbestos contracts 80K7-826542 and 81K5-830078. The cable purchased under contract 80K7-826542 was purchased and installed prior to the February 22, 1983, cutoff date stipulated in Regulatory Guide 1.89, Revision 1 for Category II qualification and therefore meets the full Regulatory Guide 1.89 and NUREG-0588 requirements for Category II qualification. Verification of the purchasing and installation documentation for cables purchased under Rockbestos contract 81K5-830078 has determined that the cables were purchased in 1982 but installed in 1985. In accordance with Regulatory Guide 1.89, Revision 1, Environmental Qualification of

Certain Electric Equipment Important to Safety for Nuclear Power Plants, paragraph 6, Replacement electric equipment installed subsequent to February 22, 1983, must be qualified in accordance with the provisions of 50.49 unless there are sound reasons to the contrary. The NRC staff considers the following to be sound reasons for the use of replacement equipment previously qualified in accordance with the DOR Guidelines or NUREG-0588 in lieu of upgrading...6.c. Identical equipment to be used as a replacement was on hand as part of the utilities stock prior to February 22, 1983. The cable from contract 81K5-830078 is not replacement equipment (i.e., it is new), and it was on hand prior to February 22, 1983, but was installed after 1983. Since the cable from contract 81K5-830078 is of identical design and the installation of the cable is no different than that supplied on contract 80K7-826542, the cable purchased under contract 81K5-830078 is considered equally qualified and acceptable under the Category II requirements. This is documented in EQ Binder WBNEQ-CABL-036.