MONTHYEARML23109A0632023-04-17017 April 2023 Email Acceptance Review for IP2 and IP3 Amended Facility License and Technical Specification to Reflect Permanent Removal of Spent Fuel from Spent Fuel Pits ML22168A0072022-06-16016 June 2022 Acceptance Review for License Amendment Request to Revise License Condition to Eliminate Cyber Security Plan Requirements ML22112A0102022-04-21021 April 2022 Acceptance Review: Request for Exemption from 10 CFR 50.54(w)(1) Concerning Indian Point Energy Center Onsite Property Damage Insurance ML22112A0122022-04-21021 April 2022 Acceptance Review: Request for Exemption from 10 CFR 140.11(a)(4) Concerning Primary and Secondary Liability Insurance for Indian Point Energy Center ML22038A2572022-02-0707 February 2022 E-mail from Z. Cruz, NRC, to J. Fleming, HDI - Acceptance Review: License Amendment Request to Revise Emergency Plan and Emergency Action Level Scheme to Address Permanently Defueled Condition for Indian Point Energy Center ML22035A1862022-02-0404 February 2022 E-mail to J. Fleming, Holtec, from Z. Cruz Perez, NRC - Acceptance Review: Exemption Requests from Portions of 10 CFR 50.47 and 10 CFR Part 50, Appendix E, Section IV for Indian Point Energy Center ML21335A3692021-12-0101 December 2021 Acceptance Review: Indian Point Energy Center - Exemption Request from 10 CFR Part 20 App G Section Iii.E ML21188A2112021-07-0707 July 2021 Acceptance of Submittal Post-Shutdown Decommissioning Activities Report ML20211L7952020-07-29029 July 2020 Acceptance Review Determination (E-mail Dated 7/29/20) License Amendment Request to Revise Provisional Operating License and TS to Reflect IPEC Permanently Defueled Condition ML20188A3832020-07-0606 July 2020 Updated Completion Date for IP2 Rescission Request from Interim Compensatory Measure 8.1, Order EA-02-026 ML20149K6992020-05-28028 May 2020 Acceptance Review Determination (E-mail Dated 5/28/20) License Amendment Request for Permanently Defueled Technical Specifications ML20108E9482020-04-17017 April 2020 Acceptance Review Determination for Proposed License Amendment to Revise the Licensing Basis to Incorporate the Installation and Use of a New Auxiliary Lifting Device ML20079M2492020-03-19019 March 2020 Acceptance Review Determination (E-mail Dated 3/19/20) Holtec Exemption Request from 10CFR50.82(a)(8)(i)(A) and 10CFR50.75(h)(1)(iv) ML20021A3802020-01-21021 January 2020 Updated E-mail 1/21/2020; Acceptance Review Determination: Proposed License Amendment City Water and Condensate Storage Tank Technical Specifications ML20002A0102019-12-30030 December 2019 Acceptance Review Determination: Proposed License Amendment City Water and Condensate Storage Tank Technical Specifications ML19295E3132019-10-22022 October 2019 Acceptance Review Determination: (E-mail 10/22/19) Relief Request IP3-IST-RR-001 for Extension of 4th 10-year IST Interval ML19267A3822019-09-24024 September 2019 Acceptance Review Determination: Rescission Request from Interim Compensatory Measure 8.1, Order EA-02-026 (Epids: L-2019-LLL-0025 and L-2019-LLL-0029) ML19141A1032019-05-20020 May 2019 Acceptance Review Determination: LAR to Revise Emergency Plan for Permanently Shut Down and Defueled Condition(05/20/2019 E-mail) EPID: L-2019-LLA-0080 ML19141A1052019-05-20020 May 2019 Acceptance Review Determination: Administrative Controls for Permanently Defueled Condition(05/20/2019 E-mail) EPID: L-2019-LLA-0081 ML19141A1072019-05-20020 May 2019 Acceptance Review Determination: Certified Fuel Handler Training Program(05/20/2019 E-mail) EPID: L-2019-LLL-0015 ML19141A1092019-05-20020 May 2019 Acceptance Review Determination: Exemption Request from Certain Provisions of 10 CFR 73.55 (05/20/2019 E-mail) EPID: L-2019-LLE-0010 ML19141A1152019-05-20020 May 2019 Acceptance Review Determination - LAR Permanently Defueled Technical Specifications (05/20/2019 E-mail) EPID: L-2019-LLA-0079 ML19059A1782019-02-28028 February 2019 Acceptance Review Results for Relief Request No. EN-19-RR-1 to Use ASME Code Case N-831-1 for Entergy Fleet ML18219A9212018-08-0707 August 2018 Acceptance Review Determination: Relief Request IP3-ISI-RR-14, Proposed Alternative to ASME Code Case N-729-4 ML18212A3482018-07-31031 July 2018 Acceptance Review Determination - LAR LAR - Deletion of License Conditions Related to Decommissioning Trust Provisions (07/31/2018 E-mail) EPID: L-2018-LLA-0180 ML18024B0232018-01-24024 January 2018 E-mail Acceptance Review Determination, Proposed License Amendment, Spent Fuel Criticality and Storage Technical Specifications ML18022A2562018-01-22022 January 2018 E-mail Acceptance Review Determination, LAR for One-Time Extension Containment Type a ILRT ML18019A0522018-01-19019 January 2018 E-mail Acceptance Review Determination, Relief Request IP2-ISI-RR-05 Alternative Examination Volume Code Case N-729-4 ML17321A5542017-11-17017 November 2017 Acceptance Review E-mail Dated November 17, 2017: Relief Requests Associated with Extension of Fourth Interval Reactor Vessel and Piping Weld Inspections and 10-year ISI Extension; (EPID: L-2017-LLR-0124, 0127, 0128) ML17142A4122017-05-22022 May 2017 Acceptance Review for Indian Point Units 1, 2 & 3 - License Amendment Request Cyber Security Plan Milestone 8 Implementation Schedule ML17123A1932017-05-0303 May 2017 Acceptance Review for Indian Point 2 Amendment to Connect Non-Seismic Piping to the RWST Seismic Piping (CAC No. MF9578) - 2017/05/03 E-mail from R.Guzman to M.Mirzai ML17115A0482017-04-26026 April 2017 Acceptance of Requested Licensing Action Amendment of Inter-Unit Transfer of Spent Fuel ML15037A5252015-02-13013 February 2015 Acceptance Review for Spent Fuel Pool Criticality Analysis ML1226503642012-09-21021 September 2012 Acceptance Review for Indian Point 3 TAC ME9263 ML1226206062012-09-18018 September 2012 Acceptance Review for Indian Point 3 Diesel Fuel Oil System Amendment ML12241A3022012-09-0505 September 2012 Acceptance Review for Amendment Regarding Atmospheric Dump Valves - Indian Point Nuclear Generating Unit No. 3 - ML1221604302012-08-0303 August 2012 Acceptance Review to Revise Appendix H Rv Capsule Surveillance Schedule ML1220212602012-07-20020 July 2012 Acceptance Review for Indian Point Cyber Security Amendment ML1218506972012-07-0202 July 2012 NRC Acceptance Review of Indian Point 3 Adv License Amendment ML12143A4892012-05-25025 May 2012 Acceptance Review for Proposed License Amendment to Allow Use of the Backup Spent Fuel Pool Cooling System While the Spent Fuel Cooling System Is Out of Service - Indian Point Nuclear Generating Unit No. 3 ML1210802052012-04-18018 April 2012 Acceptance Review for Proposed License Amendment to Allow Use of the Backup Spent Fuel Pool Cooling System While the Spent Fuel Pool Cooling System Is Out of Service - Indian Point Nuclear Generating, Unit No. 3 ML1205800432012-02-27027 February 2012 Relief Request RR-05, ME7940, Acceptance Review ML1202607432012-01-26026 January 2012 ANO 1 & 2, Big Rock, FitzPatrick, GGNS, Indian Point 1, 2, and 3, Palisades, Pilgrim, RBS, Vermont Yankee, and Waterford - Acceptance Review Email, Amendment to Revise Quality Assurance Program Manual and Staff Qualification Technical Speci ML0931703722009-11-13013 November 2009 Acceptance Review of Entergy'S Request to Extend Orders (TAC ME1515 - ME2522) ML0914704832009-05-27027 May 2009 Acceptance Review for Entergy'S Request to Extend Effectiveness of July 28, 2008, Orders ML0913200592009-05-12012 May 2009 Entergy - Acceptance Review for License Amendment Request (TAC Nos. ME1198 - ME1207) 2023-04-17
[Table view] |
Text
UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555-0001 May 25,2012 Vice President, Operations Entergy Nuclear Operations, Inc. Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 ACCEPTANCE REVIEW FOR PROPOSED LICENSE AMENDMENT TO ALLOW USE OF THE BACKUP SPENT FUEL POOL COOLING SYSTEM WHILE THE SPENT FUEL POOL COOLING SYSTEM IS OUT OF SERVICE INDIAN POINT NUCLEAR GENERATING UNIT NO.3 (TAC NO. ME8097)
Dear Sir or Madam:
By letter dated February 6,2012, Entergy Nuclear Operations, Inc., the licensee, submitted a license amendment request for Indian Point Nuclear Generating Unit NO.3. The proposed amendment would revise the Updated Final Safety Analysis Report to allow use of the backup spent fuel pool cooling system when the normal spent fuel pool cooling system is out of service. By letter dated April 18, 2012, the U.S. Nuclear Regulatory Commission (NRC) provided the results of the staff's acceptance review of this amendment request. The staff found the amendment request unacceptable with the opportunity to supplement.
The staff's letter identified the information that would be necessary to enable the NRC staff to make an independent assessment regarding the acceptability of the proposed amendment request in terms of regulatory requirements and the protection of public health and safety and the environment.
By letter dated May 2, 2012, the licensee provided supplemental information in support of the license amendment request. The NRC staff has reviewed your application as supplemented and concludes that it provides technical information in sufficient detail to enable the staff to begin its detailed technical review. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the staff's ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. You will be advised of any further information needed to support the staff's detailed technical review by separate correspondence.
VP, Operations -2 If you have any questions, please contact me at 301-415-1364 or Sincerely, Douglas V. Pickett, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-286 cc: Distribution via Listserv VP, Operations -2 If you have any questions, please contact me at 301-415-1364 or Docket No. 50-286 cc: Distribution via Listserv Distribution:
PUBLIC RidsNrrDorlLpl1-1 Resource RidsNrrLASLittle Resource RidsOgcRp Resource ADAMS ACCESSION NO.: Sincerely, /raj Douglas V. Pickett, Senior Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation LPL 1-1 rlf RidsNrrDorl Resource Ridsl\lrrDorlDpr Resource RidsNrrPrvllndianPoint Resource RidsNrrDssSbpb Resource RidsRgn1 MailCenter Resource MGray, Rgn1 RidsNrrLAKGoldstein Resource ML 12143A489 OFFICE NAME DATE LPL 1-1/PM DPickett 05/25/12 LPL 1-1/LA KGoldstein 05/24/12 SBPB/BC GCasto 05/25/12 LPL 1-1/BC GWilson (JKim) 05/25/12 OFFICIAL RECORD