ML13151A375

From kanterella
Revision as of 03:19, 17 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Termination of Reactor Oversight Process for Kewaunee Power Station and Commencement of Decommissioning Inspection Program
ML13151A375
Person / Time
Site: Kewaunee Dominion icon.png
Issue date: 05/31/2013
From: Casto C A
Region 3 Administrator
To: Heacock D A
Dominion Energy Kewaunee
References
Download: ML13151A375 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE ROAD, SUITE 210 LISLE, IL 60532-4352 May 31, 2013

Mr. David A. Heacock President and Chief Nuclear Officer Dominion Energy Kewaunee, Inc. Inssbrook Technical Center 5000 Dominion Boulevard

Glen Allen, VA 23060-6711

SUBJECT:

TERMINATION OF REACTOR OVERSIGHT PROCESS FOR KEWAUNEE POWER STATION AND COMMENCEMENT OF DECOMMISSIONING INSPECTION PROGRAM

Dear Mr. Heacock:

The purpose of this letter is to inform you of our decision to cease implementation of NRC Inspection Manual Chapter (IMC) 0305, "Operating Reactor Assessment Program," dated June 13, 2012, and IMC 2515, "Light Water Reactor Inspection Program - Operations Phase," for the Kewaunee Power Station as of May 31, 2013.

On February 25, 2013, you notified the NRC of your intent to permanently shut down and decommission the Kewaunee Power Station. On May 14, 2013, you notified us that the Kewaunee Power Station was permanently shut down and that all nuclear fuel was removed from the reactor vessel. Therefore, the Kewaunee Power Station will no longer be assessed under IMC 0305, "Operating Reactor Assessment Program," and IMC 2515, "Light-Water Reactor inspection Program - Operations P hase." Beginning June 1, 2013, the NRC's oversight of your licensed activities will be conducted under the provisions in IMC 2561, "Decommissioning Power Reactor Inspection Program," dated April 14, 2003. The objectives of IMC 2561 are to verify that decommissioning activities are being conducted safely, that spent fuel is safely stored onsite or transferred to another licensed location, and that site operations and licensee termination activities are in conformance with applicable regulatory requirements, licensee commitments, and management controls.

With the transition to IMC 2561, it is no longer necessary for you to report Reactor Oversight Process performance indicator data associated with the Kewaunee Power Station, as described in IMC 0608, "Performance Indicator Program." Although the inspection program for NRC oversight at your facility will change, all license commitments remain in effect until altered by formal action from the NRC.

By letters dated April 4 and 30, 2013, the NRC notified you of two inspection findings involving the Emergency Preparedness and Mitigating Systems Cornerstones, each having low to moderate safety significance (White). In the letters, we stated that we would conduct supplemental inspections to review the actions taken to address the performance issues using Inspection Procedure (IP) 95001, "Inspection for One or Two White Inputs in a Strategic Performance Area." Since IMC 0305 and IMC 2515 are no longer applicable to Kewaunee Power Station, we will conduct these inspections using IP 92702, "Follow-Up on Corrective Actions for Violations and Deviations," dated January 10, 2008, to verify appropriate corrective actions are being implemented.

The enclosed inspection plan lists the inspection procedures scheduled through December 31, 2013, as part of our IMC 2561 inspection program. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you to discuss the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections. Information regarding security-related inspections will be sent via separate, non-publicly available correspondence.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the component of NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Kenneth Riemer at 630-829-9628 with any questions you have regarding this letter. If you have any questions regarding the fee billing with the transition to IMC 2561, please contact Christine Galster at 301-415-0662.

Sincerely, /RA by K. O'Brien, Acting for/

Charles A. Casto

Regional Administrator

Docket No. 50-305 License No. DPR-43

Enclosure:

Kewaunee Master Inspection Plan

cc w/encl: ListServ TM

By letters dated April 4 and 30, 2013, the NRC notified you of two inspection findings involving the Emergency Preparedness and Mitigating Systems Cornerstones, each having low to moderate safety significance (White). In the letters, we stated that we would conduct supplemental inspections to review the actions taken to address the performance issues using Inspection Procedure (IP) 95001, "Inspection for One or Two White Inputs in a Strategic Performance Area." Since IMC 0305 and IMC 2515 are no longer applicable to Kewaunee Power Station, we will conduct these inspections using IP 92702, "Follow-Up on Corrective Actions for Violations and Deviations," dated January 10, 2008, to verify appropriate corrective actions are being implemented.

The enclosed inspection plan lists the inspection procedures scheduled through December 31, 2013, as part of our IMC 2561 inspection program. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you to discuss the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections. Information regarding security-related inspections will be sent via separate, non-publicly available correspondence.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be

available electronically for public inspection in the component of NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS), accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact Kenneth Riemer at 630-829-9628 with any questions you have regarding this letter. If you have any questions regarding the fee billing with the transition to IMC 2561, please contact Christine Galster at 301-415-0662.

Sincerely, /RA by K. O'Brien, Acting for/

Charles A. Casto

Regional Administrator Docket No. 50-305 License No. DPR-43

Enclosure:

Kewaunee Master Inspection Plan cc w/encl: ListServ TM DISTRIBUTION

See next page DOCUMENT NAME: Termination of ROP Kewaunee Letter
  • via e-mail Publicly Available Non-Publicly Available Sensitive Non-Sensitive OFFICE RIII RIII RIII NRR:DIRS NAME NShah for RKrsek ROrlikowski NShah for KRiemer WCartwright for TKobetz* DATE 05/30/13 05/31/13 05/30/13 05/30/13 OFFICE FSME RIII:DNMS RIII RIII NAME BWatson* KO'Brien for ABoland KO'Brien for SReynolds KO'Brien for GShear DATE 05/30/13 05/31/13 05/31/13 05/31/13 OFFICE NSIR:DSO NSIR:DPR NRR:DIRS RIII NAME KO'Brien for PHolahan* MThaggard* HNieh* KO'Brien, Acting RA for CCasto DATE 05/31/13 05/30/13 05/30/13 05/31/13 OFFICIAL RECORD COPY Enclosure Kewaunee Master Inspection Plan In accordance with the U.S. Nuclear Regulatory Commission (NRC) Inspection Manual

Chapter 2561, "Decommissioning Power Reactor Inspection Program," the NRC Region III staff developed a Master Inspection Plan (MIP) for the Kewaunee Power Station for the remainder of calendar year 2013. The inspection plan is based on your current performance in executing the site decommissioning project and the schedule of activities planned for the period June through December 2013.

The following is a list of the routine and discretionary inspection procedures (IPs) we expect to use during our inspections. The procedures used during each inspection will depend on the specific activities being conducted at the site. Additional discretionary inspection procedures may be used if decommissioning activities warrant.

The ROP baseline emergency preparedness inspection procedure IP 71114 (including attachments with the exception of IP 71114.06) will be completed for 2013 and 2014, to assure the licensee maintains the required emergency preparedness program. The schedule and scope of the emergency preparedness inspection activities will be adjusted based on the licensee's schedule of decommissioning activities and current licensing basis. Inspection procedures 82301, 82302, and 82701 may be used as additional guidance for these inspections during this period.

Inspection Procedure Title IP 36801 Organization, Management and Cost Controls IP 37801 Safety Reviews, Design Changes, and Modifications IP 40801 Self-Assessment, Auditing, and Corrective Action IP 60801 Spent Fuel Pool Safety IP 62801 Maintenance and Surveillance IP 71714 Cold Weather Preparations IP 71801 Decommissioning Performance and Status Review IP 81311 Physical Security Requirements for ISFSI IP 83750 Occupational Radiation Exposure IP 84750 Radioactive Waste Treatment, and Effluent and Environmental Monitoring IP 86750 Solid Radioactive Waste Management and Transportation of Radioactive Materials IP 42700 Plant Procedures IP 61726 Surveillance Observation IP 62706 Maintenance Rule IP 64704 Fire Protection Program IP 92702 Follow-Up on Corrective Actions for Violations and Deviations IP 71114 Emergency Preparedness (applicable portions)

IP 71003 Post-Approval Site Inspection for License Renewal (applicable portions) TI 186 Inspection of Procedures and Processes for Responding to Potential Aircraft Threats (applicable portions)

Letter to D. Heacock from C. Casto dated May 31, 2013

SUBJECT:

TERMINATION OF REACTOR OVERSIGHT PROCESS FOR KEWAUNEE POWER STATION AND COMMENCEMENT OF DECOMMISSIONING INSPECTION PROGRAM

DISTRIBUTION

Doug Huyck RidsNrrDorlLpl3-1 Resource RidsNrrPMKewaunee

RidsNrrDirsIrib Resource

Chuck Casto Cynthia Pederson Bruce Watson, FSME Theodore Smith, FSME Timothy Kobetz, NRR

Karl Feintuch, NRR

Robert Orlikowski, DNMS Steven Orth Allan Barker

Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Tammy Tomczak ROPassessment.Resource@nrc.gov