|
---|
Category:Congressional Correspondence
MONTHYEARML13203A1792013-07-25025 July 2013 LTR-13-0589 - Letter to Senator Robert Casey, Jr., from R. W. Borchardt, Limerick Radiation Detection Monitoring ML13164A3262013-06-25025 June 2013 G20130380 - Letter to Dr. Lewis Cuthbert from R. W. Borchardt Limerick Nuclear Plant - the Nuclear Regulatory Commission'S Relationship with the Alliance for a Clean Environment ML13162A4462013-06-13013 June 2013 G20130376/LTR-13-0410 - Rep. Jim Gerlach Ltr Final Public Hearing on Limerick Generating Station'S Environmental Impact Statement Scheduled for May 23, 2013 ML13095A0162013-03-27027 March 2013 G20130265/LTR-13-0278 - E-mail. Scott Savett (Rep. Jim Gerlach'S Office) Regarding Operations of Limerick-Nuclear Power Plant ML12103A3612012-03-16016 March 2012 G20120235/LTR-12-0130/EDATS: SECY-2012-0176 - Ltr. Senator Robert P. Casey Emergency Evacuation Plans of Nuclear Power Plants Located in Pennsylvania ML11265A1132011-09-26026 September 2011 G20110636/LTR-11-0503/EDATS: SECY-2011-0485 - Ltr to Rep. Jim Gerlach Fm R. W. Borchardt Drinking Water Threat - Limerick Nuclear Power Plant ML11242A1102011-08-23023 August 2011 G20110636/LTR-11-0503/EDATS: SECY-2011-0485 - E-mail Rep. Jim Gerlach Drinking Water Threat - Limerick Nuclear Power Plant ML0507404162005-03-15015 March 2005 Invitation Letters - Limerick Annual Assessment of Safety Performance ML0216105442002-07-26026 July 2002 Response to 05/02/2002 Ltr. Gas-Fired Power Plant Proposed by Florida Power & Light Directly Adjacent to Existing Exelon Nuclear Facility ML0217500272002-07-19019 July 2002 G20020342/LTR-02-0405 - Response to Rep. Tim Holden Ltr. Re Radioactive Waste from the Limerick Nuclear Power Plant (Donna Cuthbert) ML0212604292002-05-0202 May 2002 G20020271/LTR-02-0324 - Sen. Arlen Specter Ltr Re New Gas-Fired Power Plant Proposed by Florida Power and Light Directly Adjacent to Existing Exelon Nuclear Facility 2013-07-25
[Table view] Category:Letter
MONTHYEARIR 05000352/20240122024-10-17017 October 2024 Commercial Grade Dedication Inspection Report 05000352/2024012 and 05000353/2024012 RS-24-093, Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-10-10010 October 2024 Response to Request for Additional Information - Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24274A2372024-10-0707 October 2024 – Supplemental Information Needed for Acceptance of Requested Licensing Action Regarding Primary Containment Leakage Technical Specifications ML24278A3022024-10-0404 October 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10 CFR 50.62 ATWS Rule to Support the Digital Modernization Project Installation - Rev Unit 2 Technical Spec ML24275A2442024-10-0303 October 2024 Reassignment of the U.S. Nuclear Regulatory Commission Branch Chief, Division of Operating Reactor Licensing ML24263A0032024-09-27027 September 2024 Generation Station, Units 1 and 2 – Regulatory Audit Plan Supporting Review of the Component Interface Module System of the Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) (Redacted) ML24243A0482024-09-19019 September 2024 Generation Station, Unit Nos. 1 and 2 - Schedule Update for License Amendment Request to Replace Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML24215A4042024-09-18018 September 2024 Request for Withholding Information from Public Disclosure IR 05000352/20244202024-09-16016 September 2024 – Security Baseline Inspection Report 05000352/2024420 and 05000353/2024420 RS-24-090, Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-09-12012 September 2024 Response to Request for Additional Information - Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds IR 05000352/20250102024-09-10010 September 2024 Information Request for Quadrennial Baseline Comprehensive Engineering Team Inspection; Notification to Perform Inspection 05000352/2025010 and 05000353/2025010 ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification IR 05000352/20230022024-09-0404 September 2024 Reissued Integrated Inspection Report 05000352/2023002 and 05000353/2023002 IR 05000352/20240052024-08-29029 August 2024 Updated Inspection Plan for Limerick Generating Station, Units 1 and 2 (Report 05000352/2024005 and 05000353/2024005) ML24241A1952024-08-28028 August 2024 License Amendment Request for Modification to Technical Specification 3.6.1.2 and Main Steam Isolation Valve Leakage Rate Requirements ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 ML24163A3902024-08-14014 August 2024 Request for Withholding Information from Public Disclosure IR 05000352/20240022024-08-12012 August 2024 Integrated Inspection Report 05000352/2024002 and 05000353/2024002 ML24220A2392024-08-12012 August 2024 Correction to Technical Specification Page 3/4 3-11 in Amendment No. 225 ML24222A6772024-08-0909 August 2024 Response to Request for Additional Information for Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24204A0712024-07-29029 July 2024 Issuance of Amendment Nos. 263 and 225 Technical Specifications for Main Steam Line Tunnel Temperature ML24208A1592024-07-25025 July 2024 Regulatory Audit Plan Supporting Review of the System Development Portion of Limerick Digital Instrumentation and Controls License Amendment Request (EPID L-2022-LLA-0140) - Non-Proprietary ML24208A0962024-07-25025 July 2024 57243-EN 57243 - Rssc Wire & Cable LLC, Dba Marmon - Part 21 Notification ML24201A1662024-07-19019 July 2024 Response to Request for Additional Information for License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam L ML24199A1842024-07-15015 July 2024 RAI-LAR for Limerick EPID: L-2024-LLA-0079- Use This Version RS-24-070, Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions2024-07-12012 July 2024 Independent Spent Fuel Storage Installation, Nine Mile Point, Units 1 and 2, Quad Cities, Units 1 and 2, R. E. Ginna - Nuclear Radiological Emergency Plan Document Revisions ML24180A1572024-06-28028 June 2024 Request to Return and Replace WEC Documents (EQ-EV-386-GLIM, EQ-QR- 433-GLIM, and APP-GW-GLR-611), to Meet 10CFR2.390 Request to Withdraw from Public Disclosure Requirements ML24170A7702024-06-20020 June 2024 Individual Notice of Consideration of Issuance of Amendments to Renewed Facility Operating Licenses, Proposed No Significant Hazards Consideration Determination, Opportunity for Hearing(Epid L-2024-LLA-0079) LTR ML24166A1142024-06-14014 June 2024 Response to Requests for Additional Information (RAIs 15 Through 23) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems RS-24-061, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-06-14014 June 2024 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24165A2642024-06-13013 June 2024 License Amendment Request for Proposed Changes to the Technical Specification Isolation Actuation Instrumentation Tables and New Turbine Enclosure Main Steam Line Tunnel Temperature TS 3/4.7.9 ML24151A2012024-06-10010 June 2024 Request for Withholding Information from Public Disclosure ML24151A2882024-06-10010 June 2024 Request for Withholding Information from Public Disclosure ML24150A0242024-05-29029 May 2024 Notification of Commercial Grade Dedication Inspection (05000352/2024012 and 05000353/2024012) and Request for Information ML24149A2112024-05-28028 May 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFR50.62 ATWS Rule to Support the Digital Modernization Project Installation ML24079A0762024-05-23023 May 2024 Issuance of Amendments to Adopt TSTF 264 IR 05000352/20243022024-05-20020 May 2024 Revised Initial Operator Licensing Examination Report 05000352/2024302 and 05000353/2024302 RS-24-055, 2023 Corporate Regulatory Commitment Change Summary Report2024-05-17017 May 2024 2023 Corporate Regulatory Commitment Change Summary Report IR 05000352/20240012024-05-0707 May 2024 Integrated Inspection Report 05000352/2024001 and 05000353/2024001 ML24124A0432024-05-0303 May 2024 Response to Requests for Additional Information (RAIs 9 Through 14) for License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with RS-24-038, Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds2024-05-0202 May 2024 Relief Request Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds RS-24-041, Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests2024-04-30030 April 2024 Alternative Request to Utilize Code Case OMN-32, Alternative Requirements for Range and Accuracy of Pressure, Flow, and Differential Pressure Instruments Used in Pump Tests ML24114A3222024-04-23023 April 2024 Supplement to License Amendment Request to Revise the Licensing and Design Basis to Incorporate the Replacement of Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System (PPS) - Pivot to Unit ML24109A0702024-04-18018 April 2024 Supplement to License Amendment Request to Revise Technical Specifications and Exemption Request from Requirements of 10CFRC50.52 ATWS Rule to Support the Digital Modernization Project Installation . ML24093A0912024-04-17017 April 2024 Revised Estimated Review Completion Date Concerning License Amendment Request to Replace Existing Safety-Related Analog Control Systems with a Single Digital Plant Protection System ML24106A1832024-04-15015 April 2024 Submittal of Changes to Technical Specifications Bases ML24103A2042024-04-12012 April 2024 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-591-A, Revise Risk Informed Completion Time (RICT) Program Revision 0 and Revise 10 CFR 50.69 License Condition ML24096A1372024-04-0505 April 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 for Limerick Generating Station – Holtec MPC-89CBS RS-24-002, Constellation Energy Generation, LLC - Annual Property Insurance Status Report2024-04-0101 April 2024 Constellation Energy Generation, LLC - Annual Property Insurance Status Report IR 05000352/20244012024-03-19019 March 2024 Security Baseline Inspection Report 05000352/2024401 and 05000353/2024401 2024-09-06
[Table view] |
Text
June 25, 2013
Dr. Lewis Cuthbert President The Alliance for a Clean Environment 1189 Foxview Road Pottstown, PA 19465
Dear Dr. Cuthbert:
I am responding to your letter of April 29, 2013, in which you suggest the U.S. Nuclear Regulatory Commission (NRC) is not sufficiently responsive to the public.
The NRC views nuclear regulation as the public's business and, as such, believes it should be performed as openly and candidly as possible to maintain and enhance the public's confidence. The public must be informed about, and have a reasonable opportunity to participate meaningfully in, the NRC's regulatory processes. Such participation strengthens our decision-making and supports our health, safety, and environmental mission.
There are many ways we engage stakeholders in a wide variety of activities. They range in their degree of formality, and often involve different methods, different processes, and different objectives. The common theme is that we strive to be an open agency, that we value stakeholder input, and that we want public participation to be an integral part of our regulatory processes. The various methods we use have evolved over time in response to feedback that
we've received from stakeholders, such as you, through public meetings, the NRC website's satisfaction survey, correspondence, and other avenues. Additionally, we are continuing to find ways to take advantage of technology to help us stay connected. We recognize there is always room for improvement and we strive to do that on an ongoing basis.
Over the past several years, the NRC has sought to be responsive to your concerns. Over approximately the last year alone, our correspondence to you (or Alliance for a Clean Environment (ACE) associates) includes the following:
- A May 9, 2012 email from Paul Krohn to ACE responding to your questions from the April 18, 2012 annual assessment meeting regarding Limerick Generating Station (Limerick) performance (available in the NRC's Agencywide Documents Access and Management Systems (ADAMS) at accession number ML12130A152).
- A March 20, 2013 email from Mel Gray to ACE responding to an ACE email, dated February 27, 2013, regarding low level radioactive waste storage and shipping associated with Limerick (ADAMS ML13080A271).
- A May 3, 2013 email from Mel Gray to ACE responding to an ACE email, dated April 5, 2013, regarding spent fuel and low level waste associated with Limerick (ADAMS ML13134A172).
- A May 16, 2013 email from Mel Gray to ACE responding to questions and statements from ACE received in March 2013 (ADAMS ML13143A256). I believe many of the specific concerns raised in your letter to me are addressed in the 10 pages of attachments to Mr. Gray's email.
In addition, we have responded to letters sent on your behalf from Congressman Jim Gerlach.
These include NRC responses sent to Mr. Gerlach on September 26, 2011, July 23, 2012, October 4, 2012, and April 22, 2013. NRC staff also spoke with you at the recent May 23, 2013 NRC public meeting held to discuss the draft supplemental environmental impact statement for the license renewal of Limerick. This one-on-one conversation dealt with comments you made at an earlier time regarding the environmental impact statement scoping process.
We take our mission and our responsibility to the public very seriously, and believe we are making a realistic effort to address your questions and comments. We will continue to try to be responsive to your concerns in the future.
Sincerely, /RA/
R. W. Borchardt Executive Director for Operations
Pkg. ML131400044 OFFICE OEDO Region 1 OGC EDO NAME RRihm NMcNamara (via email) LSubin (via email) RWBorchardt DATE 06/13/13 06/12/13 06/13/13 06/25/13