Category:E-Mail
MONTHYEARML24250A1062024-09-0606 September 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24234A2772024-08-21021 August 2024 NRR E-mail Capture - Final RAI - Constellation Energy, LLC - Fleet Request - Proposed Alternative Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds (L-2024-LLR-0031) ML24199A1842024-07-15015 July 2024 RAI-LAR for Limerick EPID: L-2024-LLA-0079- Use This Version ML24197A0162024-07-12012 July 2024 NRR E-mail Capture - Final RAI - Constellation Energy Generation, LLC - Fleet Request - License Amendment Request to Adopt TSTF-591 ML24176A1292024-06-20020 June 2024 Estimated Completion Schedule Change Email ML24156A0082024-05-31031 May 2024 NRR E-mail Capture - Constellation Energy, LLC - Fleet Request - Acceptance of Proposed Alternative Concerning Extension of Permanent Relief from Ultrasonic Examination of Reactor Pressure Vessel Circumferential Shell Welds (L-2024-LLR-0031 ML24131A0612024-05-10010 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Proposed Alternative to Utilize Code Case OMN-32 (L-2024-LLR-0030) ML24107A9192024-05-0808 May 2024 Email to Christian Williams Re Decision on the Limerick Exemption ML24107A9202024-05-0303 May 2024 Email to Christian Williams Re Availability of Environmental Assessment for the Limerick Exemption ML24122C6742024-05-0101 May 2024 Response to a Request from NRC Review of a Draft EA for an Exemption for the Limerick Generating Station ML24122B5072024-05-0101 May 2024 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of License Amendment Request to Adopt TSTF-591, Revision 0 ML24122C6702024-04-29029 April 2024 Request from NRC Review of a Draft EA for an Exemption for the Limerick Generating Station ML24051A0652024-02-16016 February 2024 Digital I&C LAR RAIs Re HFE (Email) ML24026A2922024-01-26026 January 2024 – Request for Additional Information Regarding Limerick Digital Instrumentation and Controls License Amendment Request ML23331A0062023-11-22022 November 2023 (External Sender) Supplement - Limerick Security Rule Exemption Request ISFSI Docket No. Reference ML23311A2412023-11-0707 November 2023 NRR E-mail Capture - NRC Notification to the Commonwealth of Pennsylvania Re. Limerick Generating Station, Units 1 and 2 Amendment - Control Room Ventilation System Technical Specifications ML23304A0192023-10-30030 October 2023 NRR E-mail Capture - Final RCI - Constellation Energy Generation, LLC - Limerick 1 & 2 - Exemption from Security Rule (L-2023-LLE-0026) ML23276B4642023-10-0303 October 2023 NRR E-mail Capture - NRC Request for Additional Information Limerick TSTF-477 LAR ML23255A2872023-09-12012 September 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative to Use the Successive Inspection Requirements of BWRVIP-75-A ML23248A1282023-09-0101 September 2023 NRR E-mail Capture - Action: Opportunity to Review and Comment on a New NRC Information Collection, 10 CFR Part 50.55a, Codes and Standards (3150-XXXX) ML23237B3972023-08-24024 August 2023 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Alternative Request to Use Updated BWRVIP Guidelines ML23208A1942023-07-27027 July 2023 NRR E-mail Capture - Limerick Generating Station - Audit Plan for TSTF-477 LAR Review (L-2022-LLA-0174) ML23202A0682023-07-21021 July 2023 NRR E-mail Capture - NRC Request for Additional Information Re. TSTF-477 LAR ML23201A1262023-07-18018 July 2023 Additional RAIs for Limerick Generation Station, Units 1 and 2 - LAR and Exemption Request for Digital I&C Installation Support ML23173A0632023-06-20020 June 2023 RAIs for Limerick Generation Station, Units 1 and 2 - LAR and Exemption Request for Digital I&C Installation Support ML23102A1642023-04-12012 April 2023 Generation Station, Unit No. 2 Potential Emergent Relief Request for HPCI IST (EPID L-2023-LLR-0015) - Closure E-mail Dated 4/12/2023 ML23125A0522023-03-31031 March 2023 NRR E-mail Capture - Clean OL Pages for 50.69 LAR ML23089A1602023-03-30030 March 2023 NRR E-mail Capture - NRC Notification to the Commonwealth of Pennsylvania Re. Limerick Generating Station, Units 1 and 2 Amendment - Alternative 10 CFR 50.69 Categorization Approaches ML23086B9282023-03-27027 March 2023 Acceptance of Requested Licensing Action for License Amendment Request to Support Digital Modernization Project Installation ML23086A0822023-03-27027 March 2023 Acceptance of Requested Licensing Action for Exemption Request to Support Digital Modernization Project Installation ML22354A2622022-12-20020 December 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request - Acceptance of Request to Use Certain Provisions of the 2019 Edition of the ASME BPV Code, Section XI ML23060A1662022-12-20020 December 2022 Acceptance Review: Adopt TSTF-477, Revision 3-Acceptance Letter ML22200A0782022-07-19019 July 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Fleet Request to Use Honeywell Mururoa V4F1 R Supplied Air Suits ML22172A0752022-06-17017 June 2022 Response: Review and Feedback on Draft Limerick Digital License Amendment Request (L-2020-LRM-0041) ML22136A0032022-05-13013 May 2022 NRR E-mail Capture - NRC Request for Additional Information - Limerick License Amendment Request (L-2021-LLA-0042) ML22124A2862022-05-0404 May 2022 Information Needed to Provide Substantive Feedback on Human Factors Engineering Supporting the Planned Limerick Digital I&C License Amendment Request ML22089A1172022-03-30030 March 2022 Additional Comments and Questions on Constellation'S March 31st Presentation ML22089A1162022-03-28028 March 2022 Comments and Questions on Constellation'S March 31st Presentation ML22112A2152022-03-28028 March 2022 Limerick_Acceptance Review TS Change to Correct Nonconservative Technical Specification Table 3.3.3-1 ML22041B5362022-02-10010 February 2022 NRR E-mail Capture - Constellation Energy Generation, LLC - Request for Additional Information Regarding Fleet License Amendment Request to Adopt TSTF-541 ML22034A0142022-02-0202 February 2022 NRR E-mail Capture - Audit Plan Supplement for LIM 50.69 LAR (L-2021-LLA-0042) ML22028A1832022-01-24024 January 2022 NRR E-mail Capture - Audit Plan Supplement for LIM 50.69 LAR (L-2021-LLA-0042) ML22020A0642022-01-13013 January 2022 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding Proposed Fleet Alternative for Repair of Water Level Instrumentation Partial Penetration Nozzles ML22005A1812022-01-0505 January 2022 NRR E-mail Capture - Staff'S Questions Pertaining to Limerick Generating Station Digital Modernization Project LAR Pre-submittal Meeting Slides December 7, 2021 ML21301A0672021-10-28028 October 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-541 ML21295A0362021-10-20020 October 2021 NRR E-mail Capture - Supplement to Limerick 50.69 Audit Plan Dated October 1, 2021 (L-2021-LLA-0042) ML21286A0302021-10-13013 October 2021 Staff'S Questions Pertaining to Limerick Generating Station Digital Modernization Project LAR Pre-submittal Meeting Slides October 20, 2021 ML21256A1902021-09-10010 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Request for Additional Information Regarding License Transfer Application ML21252A0482021-09-0707 September 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Fleet Alternative Request for Repair of Water Level Instrumentation Partial Penetration Nozzles ML21215A3502021-08-0303 August 2021 NRR E-mail Capture - Exelon Generation Company, LLC - Acceptance of License Amendment Request to Adopt TSTF-554 2024-09-06
[Table view] |
Text
ADAMS Accession No. ML13130A042 From: DiPaolo, Eugene /RA/
Sent: Friday, May 10, 2013 7:16 AM To: 'bettyshank@comcast.net' Cc: Gray, Mel; Screnci, Diane
Subject:
Response to Question Regarding Limerick Generating Station Betty and Charlie Shank, I am responding to your April 12 email in which you asked questions about the August 2011 Virginia earthquake and its impact on Limerick Generating Station in Sanatoga, Pa.
Your email appears to refer to two separate declarations of Unusual Events made by operators at Limerick. On August 23, 2011, an Unusual Event was declared due to the effects felt at the site from the seismic event which occurred in Virginia. The event notification is posted on the NRC webpage at http://www.nrc.gov/reading-rm/doc-collections/event-status/event/2011/20110824en.html. On September 29, 2011, operators declared an Unusual Event due to a chemical spill on site. The event notification is available at http://www.nrc.gov/reading-rm/doc-collections/event-status/event/2011/20110930en.html.
These two events met the NRCs reportability requirements.. On site NRC inspectors responded to the two events and inspected the details of the events. These inspections were documented in Section 4OA3 of NRC Inspection Report 05000352,353/2011004, dated November 4, 2011. Ive attached a copy of the inspection report to this email. The questions in your email appear to involve the specifics of the seismic event which occurred on August 23, 2011. Below youll find the responses to the questions you raised.
What exactly did the unusual event at Limerick include?
Operators at Limerick declared an Unusual Event at 2:15 pm on August 23, 2011, due to meeting the criteria for the indications of seismic activity in the plants radiological emergency plan.
An Unusual Event is the lowest level of emergency classification for nuclear power plants.
The four levels of emergency classification from lowest to highest level are notice of unusual event, alert, site area emergency and general emergency. The declaration of a Notification of Unusual Event means events are in process or have occurred which indicate potential degradation in the level of safety of the plant. No release of radioactive material requiring offsite response or monitoring is expected unless further degradation occurs.
What systems or equipment were affected?
None. Following the seismic event, Exelon personnel performed a walk down of the facility in accordance with plant procedures to determine if the event had any effect on plant equipment. As documented in the ENS report (ENS 47185), no deficiencies were observed. NRC inspectors performed a walk down of portions of the site with a focus on safety significant equipment to independently assess whether any damage to plant equipment had occurred. No equipment damage was identified.
What responses or actions were required as a result?
Following the initial walk down of the facility immediately following the seismic event, Exelon engineering personnel performed detailed system walk downs. No deficiencies were identified. Also, because the seismic event activated the plants seismic recorder, an analysis of recorded data was performed. The analysis showed that the operating basis response spectrum for the plant was not exceeded. Exelon submitted a voluntary special report due to the activation of the seismic recorder. An electronic copy of that report is attached to this email.
When did Exelon notify the NRC?
Exelon operators notified the NRC Operations Center of the declaration of a Notification of Unusual Event at 2:56 pm on August 23. This was within the time allowance of not later than one hour after the time the licensee makes an emergency declaration. However, the notification was actually 9 minutes late because Exelon operators did not declare the Unusual Event within the required fifteen minutes of the earthquake being felt onsite.
Because the seismic monitoring system had previously been declared inoperable due to problems with its power supply, plant procedures directed operators to use compensatory measures to verify that seismic activity had occurred prior to making the emergency declaration. The call to the United States Geological Survey resulted in operators verifying the seismic event at 2:11 pm. Exelon declared the Unusual Event at 2:15 pm and made all appropriate state and local notifications within the required 15 minutes of declaring an event. Operators should have declared an Unusual Event by 2:06 pm (within 15 minutes of 1:51 pm, when the earthquake was felt on site.)
The late declaration was identified by Exelon personnel following the event and the issue was entered into the corrective action program. This issue was identified as a licensee-identified violation in NRC Inspection Report 05000352, 353/2011004, dated November 4, 2011.
Your email indicated that you needed information about the September 30, 2011 Untimely Declaration of Notification of Unusual Event for Limerick Plant Following an Earthquake.
No event occurred on that date at Limerick. However, on September 29, 2011, operators at Limerick declared an Unusual Event due to a chemical spill. For that event (ENS 47303),
both the declaration and notification were proper and timely.
What can be done about Exelons failure to notify the NRC immediately after such an event?
NRC inspectors follow up on all reportable events to assure that operators properly declared the event, notified local and state officials, and appropriately reported the event to the NRC Operations Center. Licensees that fail to satisfy declaration and notification requirements are subject to enforcement actions in accordance with the NRCs Enforcement Policy.
As stated above, the NRC was notified within one hour after the Unusual Event was declared, however, the timeliness of the declaration of the Unusual Event did not meet regulatory requirements and was considered to be of very low safety significance. Since the risk significance of the finding was determined to be very low and because the Exelon staff entered the condition into the corrective action program, the issue met the criteria for a licensee-identified violation. All issues entered into the corrective action program are subject to potential inspection by the NRC. These inspections are performed by the onsite resident inspectors and region based inspectors. In addition, Exelons corrective action program is inspected by a team of NRC inspectors every two years.
I hope that the information that I have provided helps answer your questions. If you have any follow-up questions, please feel free to contact me.
Gene DiPaolo NRC Senior Resident Inspector Limerick Generating Station 610-327-1345