Clarifies Testing Commitment Made Re Insp Rept 50-244/97-201 & Notifies That Appropriate Alternative to Clarified Testing Commitment Has Been Performed During Current Refueling Outage
ML17264B082
Person / Time
Site: Ginna Constellation icon.png
Issue date: 11/03/1997
From: MECREDY R C
ROCHESTER GAS & ELECTRIC CORP.
To: VISSING G S
NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
50-244-97-201, GL-89-04, GL-89-4, NUDOCS 9711120009
Download: ML17264B082 (5)


See also: IR 05000244/1997201

Text

CATEGORY 1 REGULATORY

INFORMATION

DISTRIBUTION

SYSTEM (RIDS)ACCESSION NBR:9711120009

DOC.DATE: 97/11/03 NOTARIZED:

NO DOCKET FACZL:50-244

Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G 05000244 AUTH.NAME AUTHOR AFFILIATION

'MECREpY,R.C.

Rochester Gas a Electric Corp.RECIP.NAME

RECIPIENT AFFILIATION

VISSING,.G.S.

SUBJECT: Clarifies testing commitment

made re insp rept 50-244/97-201

&notifies that appropriate

alternative

to clarified testing commitment

has been performed during current refueling outa e.g DISTRIBUTION,CODE:

IE01D COPIES RECEIVED:LTR

ENCL SIZE: TITLE: General (50 Dkt)-Znsp Rept/Notice

of Violation Response C NOTES:License

Exp date in accordance

with 10CFR2,2.109(9/19/72).

05000244 E G, RECIPIENT ID CODE/NAME PD1-1 PD INTERNAL: AEOD/SPD/RAB.DEDRO NRR/DISP/PIPB

NRR/DRPM/PECB

NUDOCS-ABSTRACT

OGC/HDS3 XTERNAL: LZTCO BRYCE,J H NRC PDR COPIES LTTR ENCL 1'1 1 1 1 1 RECIPIENT ID CODE/NAME VISSING,G.

AEOD LE CENTE CH/HHFB NRR/DRPM/PERB

OE DIR RGN1 FILE 01 NOAC NUDOCS FULLTEXT COPIES LTTR ENCL D 0 N NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE.TO HAVE YOUR NAME OR ORGANIZATION

REMOVED FROM DISTRIBUTION

LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 18 ENCL

0

November 3, 1997 U.S.Nuclear Regulatory

Commission

Document Control Desk Attn: Guy S.Vissing'roject Directorate

I-1 Washington, D.C.20555 Subject: Clarification

of A/E Inspection

Commitment

NRC Inspection

Report No.50-244/97-201

R.E.Ginna Nuclear Power Plant Docket No.50-244 Dear Mr.Vissing: During the period from June 9 through August 15)1997 the U S.Nuclear Regulatory

Commission (NRC), Office of Nuclear Reactor Regulation (NRR)performed an A/E Inspection

of the R.E.Ginna Nuclear Power Plant.During this inspection, the NRC inferred that Rochester Gas&Electric (RG&E)had committed to performing

seat leakage testing for two Component Cooling Water (CCW)System check valves.The intent of this correspondence

is to clarify the testing commitment

made by RG&E.Also, RG&E wishes to notify the NRC that an appropriate

alternative

to the clarified testing commitment

has been performed during the current refueling outage.Due to the short period of time from the receipt of NRC Inspection

Report 50-244/97-201

to the projected completion

of this refueling outage, RG&E believes it is prudent to notify the NRC of the check valve test clarification

and proposed alternative

now, rather than 60 days after issuance of the inspection

report.As requested in the inspection

report, RG&E will provide a schedule for completion

of corrective

actions, where applicable, within 60 days of issuance of the inspection

report.NRC Inspection

Report No.50-244/97-201, under Section El (Conduct of Engineering), Item E1.2.2.2 (d)(CCW System Testing)l gg]states: "the licensee stated that valves 753A and B would be added to the in-service

inspection

program and require leak testing." It is correct that check valves 753A and 753B will be added to the Ginna Station Inservice Testing Program, but with a test requirement

of check valve closure verification

testing and not seat leakage testing.II!Ill!(llllll/llllllllllllillf

Illa'll

Check valves 753A and 753B are in the CCW System supply piping to the reactor coolant pump thermal barriers.Although these valves'are designed as pressure class boundaries

between the Reactor Coolant System and the lower pressure CCW System, they are not, considered

pressure isolation valves (PIVs)since, should a thermal barrier leak occur, the associated

CCW piping is protected from overpressure

by pressure relief valves and the Ginna Station licensing basis considers a thermal barrier leak as a small break loss of coolant accident.Since the capacity of the associated

pressure relief valves is sufficient

to provide overpressure

protection

for the affected CCW System piping should a thermal barrier leak occur, the safety function of check valves 753A and 753B is to close to mitigate the consequences

of the accident.Thus, seat, leakage in the closed position is inconsequential.

Therefore, RG&E agrees that it is prudent to subject check valves 753A and 753B to periodic inservice testing to verify closure capability.

In order to perform closure verification

testing, a modification

is required to install suitable test connections.

Due to the short amount of time from when the commitment

for inservice testing was made prior to the commencement

of the current refueling outage, the proper preparations

were not able to be made to perform this required modification.

However, RG&E has disassembled

check valves 753A and 753B during this refueling outage to verify valve obturator movement to the closed position in accordance

with OMa-1988, Part 10, Section 4.3.2.4.This activity is an acceptable

alternative

pursuant to Position 2 of NRC Generic Letter 89-04 and, as such, does not require a request for relief from Code requirements.

RG&E intends to modify the affected piping system to install suitable test connections

during the Spring, 1999 refueling outage and to commence the periodic closure verification

testing schedule in accordance

with the Ginna Station Inservice Testing Program at that time.Very truly yours,/~grq'Robert C.Mecredy GJW5482

xc: Mr.Guy S.Vissing (Mail Stop 14B2).Project Directorate

I-1 Washington, D.C.20555 U.S.Nuclear Regulatory

Commission

Region I 475 Allendale Road King of Prussia, PA 19406 US NRC Ginna Senior Resident Inspector