Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML17284A9121999-10-13013 October 1999 Proposed Tech Specs 3.3.6.1,Table 3.3. 6.1-1, Primary Containment Isolation Instrumentation. ML17284A8761999-08-27027 August 1999 Replacement Page 9 of 9 to Attachment 4 of Procedure 13.10.6 ML17284A8491999-07-29029 July 1999 Proposed Tech Specs,Revising SR 3.5.2.2 Re Condensate Storage Tank Water Level ML17284A8421999-07-29029 July 1999 Proposed Tech Specs Revising SR of TS 3.8.4, DC Sources - Operating & SR 3.8.5.1 of TS 3.8.5, DC Sources - Shutdown. ML17284A8461999-07-29029 July 1999 Proposed Tech Specs,Revising Table 3.3.5.1-1, ECCS Instrumentation Items 1.a,2.a,4.a & E.A. ML17284A8521999-07-29029 July 1999 Proposed Tech Specs 3.4.9, RHR Shutdown Cooling Sys - Hot Shutdown. ML17333A0021999-04-20020 April 1999 Proposed Tech Specs Section 3.4.11,replacing Existing Reactor Pressure Temp Limit Curves by 000630 ML17292B6341999-04-0707 April 1999 Proposed Tech Specs Modifying MCPR Safety Limits to Allow Continued Power Operation at Plant Following Restart from R-14 RFO ML17292B5731999-03-0101 March 1999 ODCM for WNP-2 ML17292B4881998-12-17017 December 1998 Proposed Tech Specs SR 3.8.1.8,allowing Capability to Manually Transfer Between Preferred & Alternate Offsite Power Sources During Modes 1 & 2 by 990125 ML20198A7051998-11-30030 November 1998 Revs 8 Through 13 to TS Bases & Revs 12 Through 15 of Licensee Controlled Specs ML17284A7181998-08-0505 August 1998 Proposed Tech Specs SR 3.8.4.7,allowing Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 1 & 3,125 Vdc Batteries E-B1-1 & HPCS-B1-DG3 & Div 1,250 Vdc Battery E-B2-1 ML17284A7071998-07-17017 July 1998 Proposed Tech Specs Modifying SR 3.8.4.7 to Allow Performance Discharge Test to Be Performed in Lieu of Battery Svc Test for Div 2,125 Vdc,Battery E-B1-2 ML17284A6431998-05-29029 May 1998 Revised Plant Procedure Sys for Site Wide Procedures, Replacing Pages Located in Manual W/Pages in Package ML17292B2831998-03-0909 March 1998 Proposed Tech Specs Establishing Interim SLMCPR for Siemens Power Corp ATRIUM-9X Fuel Applicable to Cycle 14 Only ML17292B2591998-01-31031 January 1998 Offsite Dose Calculation Manual. ML17292B1321997-12-0404 December 1997 Proposed Tech Specs Modifying Min Critical Power Ratio Safety Limits ML17292B0281997-08-14014 August 1997 Proposed Tech Specs Revising TS 5.5.6 by Adding Note That Would Extend Interval Requirement to Perform Full Stroke Exercise Testing of TIP-V-6 Until 1998 Refueling Outage ML17292A9691997-08-12012 August 1997 Proposed Tech Specs Supporting Request for Enforcement Discretion for Period of 45 Days from TS Action 3.6.1.3.A Required Actions to Isolate Purge Line & Verify Penetration Flow Path Isolated Every 31 Days ML17292A9421997-07-16016 July 1997 Proposed Tech Specs Adding New Min Reactor Vessel Pressure Versus Reactor Vessel Metal Temp (P/T) Curves,Applicable Up to 12 EFPYs ML17292A8901997-06-0606 June 1997 Revised Tech Spec Page 2.0-1 Modified to Indicate That SLMCPR for ATRIUM-9X Fuel Applies Only to Cycle 13 & Corresponding Bases Pages ML17292A8651997-05-20020 May 1997 Proposed Tech Specs,Requesting Mod of Minimum Critical Power Ratio Safety Limits by 970615 ML17292A8301997-03-31031 March 1997 Wppss WNP-2 RPV Surveillance Matls Testing & Analysis. ML17292A7621997-03-24024 March 1997 Rev 5 to TS Bases. ML17292A7631997-03-24024 March 1997 Rev 7 to Licensee Controlled Specs. ML17292A7581997-03-22022 March 1997 Proposed Tech Specs Modifying Response Time Testing SR for RPS Instrumentation,Primary Containment Isolation Actuation Instrumentation & ECCS Actuation Instrumentation ML17292A7531997-03-20020 March 1997 Proposed Tech Specs Re Response Time Testing Requirements ML17292A6591997-01-14014 January 1997 Proposed Tech Specs Reflecting Compilation of TS Change Requests Submitted to NRC in Ltrs Dtd 951208,960709 & 1212 ML17292A6341996-12-12012 December 1996 Proposed Tech Specs Requesting Conversion Based Upon NUREG-1434,rev 1 ML17292A6161996-11-19019 November 1996 Rev 1 to WNP-2 IST Program Plan (Pumps & Valves) 2nd Interval (941213-041212). ML17292A5511996-10-15015 October 1996 Proposed Tech Specs Re Secondary Containment & SGTS to Reflect Revised Secondary Containment Drawdown & post- Accident Analyses Results ML17292A5411996-10-10010 October 1996 Proposed Tech Specs Requesting Addition of Section 2B(6) Re Storage of Byproduct,Source & Special Nuclear Materials ML17292A4501996-09-0606 September 1996 Proposed Tech Specs,Containing Corrections to Factual Statements & Proposed Info to Clarify Evaluations ML17292A4111996-08-0909 August 1996 Proposed Tech Specs,Revising TS Section 6.3 Re Unit Staff Qualifications,By Changing Operations Manager Qualification Requirements Associated W/Operations Knowledge from Meeting Ansi/Ans N18.1-1971 ML17292A3561996-07-0909 July 1996 Proposed Tech Specs,Revising Rev a, Including Changes in Vol 7.Proposed Rev Does Not Change Conclusion of NSHC or Environ Assessment Provided Rev a ML17292A7241996-05-31031 May 1996 Offsite Dose Calculation Manual. ML17292A2741996-04-25025 April 1996 Rev 0 to UT-WNP2-208V0, Exam Summary Sheet. ML20107M3391996-04-24024 April 1996 Proposed Tech Specs,Modifying TS to Support Cycle 12, Scheduled to Begin Subsequent to Spring 1996 Outage ML17292A1511996-04-22022 April 1996 Proposed Tech Specs,Supplementing TS That Describes Administrative & Editorial Changes to Section 6.0, Administrative Controls. ML17291B2801996-03-19019 March 1996 Proposed Tech Specs Re Containment Leakage Testing ML17291B2491996-02-26026 February 1996 Proposed Tech Specs,Submitting Revised Copy of TS Bases Which Include Minor Changes & Clarifications Made Per Requirements of 10CFR50.59 ML17333A0201996-01-19019 January 1996 Proposed Tech Specs Re Primary Containment Leakage Testing ML17291B1751995-12-31031 December 1995 Reactor Power Uprate Startup Test Rept, for WNP-2. W/951215 Ltr ML17291B0941995-10-26026 October 1995 Proposed Tech Specs,Replacing Existing Reactor Recirculation Flow Control Sys W/Adjustable Speed Drive Sys ML17291A9911995-08-16016 August 1995 Proposed Tech Specs Page 3/4 4-4,incorporating Surveillance Notes in Front of Surveillances 4.4.1.2.1 & 4.4.1.2.2 for Jet Pump Operability to Clarify That Notes Apply to Each Surveillance ML17291A9591995-07-28028 July 1995 Operations Instructions OI-23,Rev a to, Human Performance Improvement Program. ML20087E2831995-07-26026 July 1995 Performance Enhancement Strategy 1995 ML17291A8401995-06-0606 June 1995 Proposed Tech Specs Index,Deleting Ref to Bases Pages ML17291A8371995-06-0606 June 1995 Proposed Tech Specs Section 6.9.3.2,adding Ref to Three TRs Describing Analytical Methods That May Be Used in Determining Reactor Core Operating Limits for Reload Licensing Applications ML17291A8441995-06-0606 June 1995 Proposed Tech Specs Section 6.0, Administrative Controls. 1999-08-27
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML17284A8761999-08-27027 August 1999 Replacement Page 9 of 9 to Attachment 4 of Procedure 13.10.6 ML17292B5731999-03-0101 March 1999 ODCM for WNP-2 ML17284A6431998-05-29029 May 1998 Revised Plant Procedure Sys for Site Wide Procedures, Replacing Pages Located in Manual W/Pages in Package ML17292B2591998-01-31031 January 1998 Offsite Dose Calculation Manual. ML17292A6161996-11-19019 November 1996 Rev 1 to WNP-2 IST Program Plan (Pumps & Valves) 2nd Interval (941213-041212). ML17292A7241996-05-31031 May 1996 Offsite Dose Calculation Manual. ML17292A2741996-04-25025 April 1996 Rev 0 to UT-WNP2-208V0, Exam Summary Sheet. ML17291A9591995-07-28028 July 1995 Operations Instructions OI-23,Rev a to, Human Performance Improvement Program. ML20087E2831995-07-26026 July 1995 Performance Enhancement Strategy 1995 ML17291B1621995-03-0606 March 1995 Rev 9 to Procedure Qci 6-4, Ultrasonic Exam Feedwater Nozzle Inner Radii. ML17291A1341994-06-16016 June 1994 Pages 9 & 10 to Rev 11 to PPM 13.12.15,inadvertently Omitted from Original Submittal ML17291A6661994-04-30030 April 1994 WNP-2 Odcm. ML17290A9951993-12-31031 December 1993 Amend 16 to Odcm. ML17290A3771993-05-27027 May 1993 Amend 1 to Inservice Insp Program Plan,First Insp Interval. New Relief Request Will Be Submitted to Define Areas of Limited Exam of RPV nozzle-to-shell Welds ML17272B0141993-04-28028 April 1993 Amend 1 to Vols 1-3 of ISI Program Plan. ML17289B2621993-02-22022 February 1993 Rev 1 to LTI7.4, Operations Liaison Responsibilities. ML17289B1931993-01-31031 January 1993 Offsite Dose Calculation Manual. ML17289A7811992-07-31031 July 1992 Revised Plant Procedures Manual Including Rev 10 to 13.8.2, Backup Emergency Dose Projection Sys Operations & Rev 7 to 13.11.1, Recovery Manager Duties. ML20097H7511992-04-23023 April 1992 Plant Procedure 10.25.89, One Hour - Three Hour Fire Barrier Installation ML17289A5031992-04-0101 April 1992 Washington Nuclear Plant - 2 Licensed Operator Requalification Program Corrective Action Plan Resolution Documentation. ML17286B1791991-11-21021 November 1991 Rev 4 to Pump & Valve Inservice Test Program Plan,WPPSS-2. ML17286A9051991-06-28028 June 1991 Odcm. ML17286A7381991-04-30030 April 1991 Revised Plant Procedures Manual Including,Procedures 13.7.7, 12.7.8,13.8.1 & 13.11.15 ML17286A4971990-12-0505 December 1990 Revised Epips,Including Rev 8 to 13.8.2,Rev 10 to 13.10.9, Rev 8 to 13.11.13,Rev 8 to 13.14.1,Rev 6 to 13.14.3,Rev 10 to 13.14.4 & Rev 7 to 13.14.9 ML17285B0621990-02-26026 February 1990 Amend 7 to Odcm. ML17285B0501990-02-22022 February 1990 Rev 6 to Plant Procedures Manual 13.8.2, Manual Offsite Dose Calculations. W/900222 Ltr ML20066K0451989-03-28028 March 1989 Rev 5 to Qci 6-4, Ultrasonic Exam Feedwater Nozzle Inner Radii ML17285A2621988-11-30030 November 1988 Amend 6 to Offsite Dose Calculation Manual. ML17285A2511988-11-30030 November 1988 Amend 6 to Offsite Dose Calculation Manual. ML20090M2951987-11-17017 November 1987 Rev 4 to FATE-84-100, Vipre Code Maint Procedures Manual ML20236N3071987-11-0606 November 1987 Corrected Page 16 of Rev 7 to Procedure 13.14.2, Process for Determining Protective Action Recommendations & Protective Action Decisions ML17279A5931987-10-0808 October 1987 Rev 3b to Pump & Valve Inservice Test Program Plan. ML17284A3901987-06-30030 June 1987 Draft A-3453-87-6, Washington Nuclear Plant 2 Generic PRA- Based Insp Plan. ML17278B1221986-11-17017 November 1986 Rev 2 to Emergency Procedure 5.3.6, Reactor Pressure Vessel Flooding (Contingency). ML20215B7551986-07-24024 July 1986 Rev 3 to NDE & I Instruction Qci 6-4, Ultrasonic Exam BWR Nozzle Inner Radius ML20215B7631986-03-20020 March 1986 Rev 3 to NDE & I Instruction Qci 6-13, Ultrasonic Exam of Piping Welds (Manual) ML17278A5681986-01-0606 January 1986 Rev 5 to Emergency Plan Implementing Procedure 13.14.7, Emergency Training. ML17278A5341985-12-20020 December 1985 Rev 3a to Pump & Valve Inservice Test Program Plan. ML17278A4731985-11-0101 November 1985 Revised Emergency Procedures,Including Rev 1 to Procedure 5.0.0, Emergency Procedure General Precautions, Rev 0 to Procedure 5.0.1, Emergency Operating Procedure Flow Chart & Rev 1 to Procedure 5.1.3, Reactor Power Control. ML17278A5491985-09-24024 September 1985 Rev 0 to Procedure Tp 8.6.6, Special Test Procedure for Tdas Class 1E Isolators. ML20133N3611985-09-0909 September 1985 WPPSS-2 Emergency Preparedness Exercise Manual for 850909-13 ML20129B5491985-05-0606 May 1985 Vol 1 of Rev 0 to Inservice Insp Program Plan ML17278A4291985-03-20020 March 1985 Rev 1 to Operating & Engineering Test Procedure 8.2.92, UHS Performance. ML17277B6461985-03-0505 March 1985 Amend 4 to 85-01, Preservice Insp Program Plan, Vols 1-4 ML17277B3101984-02-29029 February 1984 Control Room Design Review Program Plan. ML17277B3091984-02-17017 February 1984 Function & Task Analysis of Emergency Operating Procedures. ML17277B7331983-12-28028 December 1983 Rev 2 to 23A1900AA, RHR Sys. ML17277B0401983-11-0707 November 1983 Rev 6 to Administrative Procedure 1.3.8, Equipment Clearance & Tagging. ML17277B0421983-11-0707 November 1983 Rev 6 to Administrative Procedure 1.5.1, Tech Spec Surveillance Testing Program. ML17277B0361983-11-0707 November 1983 Rev 5 to Administrative Procedure 1.3.1, Standing Orders/ Night Orders. 1999-08-27
[Table view] |
Text
WASHINGTON PUBLIC POWER SUPPLY SYSTEM wxp PROCEDURE NUMBER+1.3.6 VOLUME NAME APPRO D DATE 12/14/82 1,ADMINISTRATIVE PROC RES SECTION l."3 CONDUCT OF'OPERATIONS TITI E+1.3.6 SHIFT TURNOVER 1.3.6.1~FezZeee This procedure provides instruction for offgoing and oncoming shift per-sonnel during shift turnover to ensure a canprehensive exchange of infor-mation and accomplishment of individual shift responsibilities.
1.3.6e2 Procedure A.No person shall permit a relief person to assume the shift if.there is doubt the relief is alert, coherent, and fully capable of re-sponsible performance; no person shall assume a shift position un-less physically'nd mentally fit.B.Offgoing shift personnel shall not leave assigned work stations un-til satisfied the relief person is fully aware of existing condi-tions and not until the relief states RYou are relieved." C.D.E.Each shift position shall be relieved by a qualified person who is properly licensed and/or qualified to assume the responsibilities of the position.The offgoing shift should place the plant or any ongoing activity.in a stable condition.
prior to beginning the shift turnover process.Prior.to assuming the shift, the relieving individual shall review documented information applicable to the position such as logs, special instruction, night orders, and procedure which were gen-.erated in the offtime interval.Oncoming and offgoing Control Room Operators shall walk-down control boards/consoles to verify checklist items and exchange other per-tinent information.
83040804ih
.830323 PDR ADOCK 05000397 E'PDR WP 597 R1 PROCEOURE NUMBER REVISION NUMBER PAGE NUMBER 1..6 1 1.3.-1 of 7
~..G.'The oncoming Shift Manager sha" complete the checklist per Attach-ment I.H.The offgoing and oncoming Control Room Supervisor shall complete the~checklist per Attachment II.I.The offgoing and oncoming Shift Support supervisors shall complete the checklist per Attachment III.J.Shift Turnover Checklists shall be collected and transmitted to the Operations Manager at the end of each week-day night shift.1.3.6.3'Documentation After review by the Operations Manager, the checklists shall be retains,'er the 1.6 Series of the Plant Procedure Manual.I l.3.6.4 Attachments A.Attachment I-Shift Manager Shift Turnover Checklist B.Attachment II-Control Roon Supervisor Shift Turnover hecklist C.Attachment III-Shift Support Supervisor Shift Turnover Checklist WP 599 PROCEDURE NUMBER 1.3.6 REVISION NUMBER PAGE NUMBER.3.6-2 of 7 ATTACHMENT I SHIFT MANAGER SHIFT TURNOVER CHECKLIST Offgoing Manager Oncceing Manager Date Shift M D.S Part I-To be reviewed prior to oncoming Manager relieving the shift (check).Shift Crew Coaposition Fire Brigade Composition Liquid Discharge Permits Shift Manager'Log Night Orders Log LCO Status Active MWRs RWPs Active Surveillance Pri.Cont.Status (Outages)Sec.Cont.Status (Outages)Inop Equipment Status.Part II-To be reviewed shortly after assuaing the shift (check).C.R.S.Log Buyer Log/Inventory Inop/Bypass Boards New/Revised Procedures Controlled Key Status C.R.S.Shift Turnover Checklist S.S.S.Shift Turnover Checklist Liquid Waste Capacity Surveillance Schedule Planned MWR/Operations Hot Work Permits Equip.Oper.Log Sheet WP 598 PROCEDURE NUMBER 1.3.6 REVISION NUMBER PAGE NUMBER.3.6-3 of 7 ATTACHMENT II CONTROL ROOM SUPERVISOR SHIFT TURNOVER CHECKLIST Offgoing C.R.S.Ongoing C.R.S.Date Shift M D S Part I-To be completed by offgoing Supervisor.
A.Mode Switch: Shutdown Refuel Startup Run B.C.D.Power: SRM IRM: W APRM MWE Press: ps'Recirc: Loop A M/A: Man.W Valve'uto Loop 8 M/A: Man.W Valve Auto Flux M/A: Man.W Set Auto Master M/A: W Set X IOS lb/hr, core I Feedwater:
S.U.Valve M/A Man.W Open~.'uto Stpt RFWDT A M/A Man.RPM Auto RFWDT B M/A Man.RIB Auto'Master M/A Man.Auto.Stpt, Element 1 Demins on line (~8 Demin dP~sid Power Limits: PCIOMR Yes No Power Distribution Yes No F.'Rcds: Sequence Rod Notch Inops (List)G.'ypassed:
IRM APRM Flow RBM RSCS H.MAPLHGR A C E G A C E Unit A C A (List Rods)LIMIT B D F N 8 D F B D B MFLPO MCPR FRTP-WP-598 PROCEDURE NUMBER 1.3.6 REVISION NUMBER PAGE NUMBER'.3.6-4 of 7 I'I r~~~'~~'I.-.Inop'/Bypass Status Boards: Initial for, check of earth board;explain all Bypass/Inop indications.
LFCI-A LPCI-B LPCI-C RCIC Div I RCIC Div II'G-1 DG-2 NSSS Div I NSSS Div II SW-A~SW-8 SLC-A SLC-A RPS-A RPS-B 24 VDC Div I 24 VDC Div II 125 VDC Div I t 125 VDC Div II 250 VDC NSLC Div I NSLC Div II CIA-A CIA-8 SBGT Div I SBGT Div II CAC Div I CAC Div II CR HSV Djv I CR MEV Div II Vent h Purge Div'I Vent 4 Purge Div II Inop/Bypass indication explanations:
Degraded Equipment:
List'systems or components and if applicable, Tech-nical Specification Time limitation.
~Se/Com Date/Time Entering De raded Mode Time Interval Allowed Date/Time Required V tv t'Reviewed: Oncoming Supervisor, Date/Time WP-598 PROCEOURE NUMBER 1.3.6 REVISION NUMBER PAGE NUMBER 1.3.6-5 of 7 Ccntrol Board Walkdown Alarms Offsite Power Sources Lifted Wire/Dumper Log Active Surveillance Active MWR/CO Part III-To be reviewed shortly after shift tu."nover.
A.SRVs: 1)List SRVs having a tailpipe temperature greater than 250oF 2)List SRVs having an unilluminated neon circuit continuity liuent B.Plant Parameters:
Drywell: Press Ave.Suppression Pool/Chamber:
Spray Ponds (A/B): Levt51 Offgas: Pretreat (mr/hr)Feedwater:
mho/cm Level Ave.Temp (M20)X 02 Stack (cpm)C.Annunciators:
Tested D.Controllers nulled: CRO Flow RCIC FW RFW Putlp Minimus Flow RECIRC E.Procedures:
New/revised procedures reviewed ,F.Indicating Lamp Survey=List any failed lamps not immediately replaced and/or repaired WP.598 PROCEDURE NUMBER 1.3.6 REVISION NUMBER PAGE NUMBER~1.3.6-6 of 7 ATTACHMENT III SHIFT SUPPORT SUPERVISOR SHIFT TURNOVER CHECKLIST Offgoing Support Supervisor Oncaning Support.Supervisor Date Shift~.D Part I-To be completed by offgoing Supervisor.
Condensate:
On-line demins: A 8 C D E F dp psig.Waste TK Levels: CPR-TK-14, CPR-TK-92A CPR-TK-92B Demin H20: DW-TK-1 Level Inservice Train A B Radwaste Tank: Levels: FDR-TK-6,.EDR-TK-2, EDR-TK-5 Diesel Oil Levels:.DO-TK-1A, DO-TK-1B, DO-TK-2 Part II-To be reviewed during shift Radwaste Log Shift Crew Ccmposition Ed Log Sheets.Active MWR/CO Active'urveillance turnover.Inop Equip Status Liquid Discharge Permits Fire Watch/Weld Permits RWP Part III-To be reviewed shortly after shift turnover.MWR/CO Schedule Surveillance Schedule New/Revised Procedures N2 Inventory for Inert N2 CRD Accumulators N2 CIA Backup Protective Clothing Status M.U.H20 Treat Log WP-598 PRf C$DgRE NUMBER REVISION NUMBER PQQg IhIU+Py