Letter Sequence Request |
---|
|
|
MONTHYEARJAFP-17-0077, Mitigating Strategies Assessment (MSA) for the Reevaluated Flooding Hazards Pursuant to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1: Flooding of the Near-Term Task Force Review of Insights from the Fukushima..2017-07-27027 July 2017 Mitigating Strategies Assessment (MSA) for the Reevaluated Flooding Hazards Pursuant to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1: Flooding of the Near-Term Task Force Review of Insights from the Fukushima.. Project stage: Request ML17355A1102017-12-12012 December 2017 Submittal of Revised Mitigating Strategies Assessment Report for Flooding Project stage: Request ML17321B0402017-12-18018 December 2017 Flood Hazard Mitigation Strategies Assessment(Cac Nos. MF7919 and MF7920; EPID L-2016-JLD-0007) Project stage: Other ML18019A2692018-02-12012 February 2018 Flood Hazard Mitigation Strategies Assessment Project stage: Other ML17234A4322018-02-12012 February 2018 Flood Hazard Mitigation Strategies Assessment Project stage: Other ML18071A1692018-03-22022 March 2018 Flood Hazard Mitigation Strategies Assessment Project stage: Acceptance Review L-18-096, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI - Notification of Petition for Bankruptcy2018-04-0202 April 2018 ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI - Notification of Petition for Bankruptcy Project stage: Request L-18-109, Certification of Permanent Cessation of Power Operations for Beaver Valley Power Station. Unit Nos. 1 and 2. Davis-Besse Nuclear Power Station. Unit No. 1. and Perry Nuclear Power Plant. Unit No. 12018-04-25025 April 2018 Certification of Permanent Cessation of Power Operations for Beaver Valley Power Station. Unit Nos. 1 and 2. Davis-Besse Nuclear Power Station. Unit No. 1. and Perry Nuclear Power Plant. Unit No. 1 Project stage: Request ML18108A6942018-05-0303 May 2018 Flood Hazard Mitigation Strategies Assessment Project stage: Other ML17249A7302018-05-0909 May 2018 Flood Hazard Mitigation Strategies Assessment Project stage: Other ML18045A0522018-06-27027 June 2018 Flood Hazard Mitigating Strategies Assessment (Public) Project stage: Other ML18275A2962018-09-26026 September 2018 NRR E-mail Capture - (External_Sender) Brunswick Flooding MSA Review Project stage: Request ML18284A3972018-10-30030 October 2018 Flood Hazard Mitigation Strategies Assessment Project stage: Other L-18-252, Request for Deferral of Actions Related to Beyond-Design-Basis External Events Flooding Actions2018-12-0707 December 2018 Request for Deferral of Actions Related to Beyond-Design-Basis External Events Flooding Actions Project stage: Request L-19-193, Resumption of Actions Related to Beyond-Design-Basis External Events Flooding Actions2019-08-30030 August 2019 Resumption of Actions Related to Beyond-Design-Basis External Events Flooding Actions Project stage: Other 2018-03-22
[Table View] |
Beaver Valley, Units 1 and 2, ISFSI, Davis-Besse, Unit 1, ISFSI, Perry, Unit 1, ISFSI - Notification of Petition for BankruptcyML18094A661 |
Person / Time |
---|
Site: |
Beaver Valley, Davis Besse, Perry, 07201043, 07200069 |
---|
Issue date: |
04/02/2018 |
---|
From: |
Moul D A FirstEnergy Nuclear Operating Co |
---|
To: |
Document Control Desk, Region 1 Administrator, Region 3 Administrator |
---|
References |
---|
L-18-096 |
Download: ML18094A661 (2) |
|
|
---|
Category:Letter
MONTHYEARIR 05000346/20240032024-11-14014 November 2024 Integrated Inspection Report 05000346/2024003 IR 05000334/20244032024-11-13013 November 2024 Cybersecurity Problem Identification and Resolution Inspection Report 05000334/2024403 and 05000412/2024403 (Cover Letter Only) IR 05000334/20240032024-11-13013 November 2024 Integrated Inspection Report 05000334/2024003 & 05000412/2024003 L-24-243, License Renewal Application for the Perry Nuclear Power Plant Revision O - Supplement 62024-11-0707 November 2024 License Renewal Application for the Perry Nuclear Power Plant Revision O - Supplement 6 L-24-226, License Renewal Application for the Perry Nuclear Power Plant Revision O - Response to Requests for Confirmatory Information (Rcls) - Set 12024-10-31031 October 2024 License Renewal Application for the Perry Nuclear Power Plant Revision O - Response to Requests for Confirmatory Information (Rcls) - Set 1 IR 05000440/20240032024-10-30030 October 2024 Integrated Inspection Report 05000440/2024003 and 07200069/2024001 ML24303A3282024-10-29029 October 2024 Information Request for the Cyber Security Baseline Inspection Identification to Perform Inspection L-24-179, License Renewal Application for the Perry Nuclear Power Plant Revision 0 - Supplement 52024-10-21021 October 2024 License Renewal Application for the Perry Nuclear Power Plant Revision 0 - Supplement 5 IR 05000334/20240112024-10-17017 October 2024 License Renewal Phase IV Inspection Report 05000334/2024011 ML24281A0662024-10-0404 October 2024 EN 57363 - MPR Associates, Inc. Report in Accordance with 10 CFR Part 21 on Incomplete Dedication of Contactors Supplied as Basic Components L-24-208, License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 2)2024-10-0202 October 2024 License Renewal Application for the Perry Nuclear Power Plant - Responses to Request for Additional Information - Round 1 (Set 2) IR 05000346/20244032024-09-27027 September 2024 Security Baseline Inspection Report 05000346/2024403 L-24-223, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-09-26026 September 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 ML24269A0552024-09-25025 September 2024 Submittal of the Updated Final Safety Analysis Report, Revision 35 05000346/LER-2021-001-01, Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground2024-09-19019 September 2024 Emergency Diesel Generator Speed Switch Failure Due to Direct Current System Ground L-24-015, Twenty-Ninth Refueling Outage Inservice Inspection Summary Report2024-09-17017 September 2024 Twenty-Ninth Refueling Outage Inservice Inspection Summary Report L-24-038, License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References2024-09-17017 September 2024 License Amendment Request to Remove the Expired One-Time Action for Valve Leak Repair in Technical Specification (TS) 3.5.2 and to Correct Core Operating Limits Rep Ort (COLR) References ML24134A1522024-09-17017 September 2024 Exemption from the Requirements of 10 CFR 50.71(e)(4) Final Safety Analysis Report Update Schedule (EPID L-2024-LLE-0005) - Letter ML24260A1912024-09-16016 September 2024 Operator Licensing Examination Approval L-24-207, License Renewal Application for the Perry Nuclear Power Plant-Response to Request for Additional Information - Set 12024-09-16016 September 2024 License Renewal Application for the Perry Nuclear Power Plant-Response to Request for Additional Information - Set 1 ML24260A2382024-09-16016 September 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML24225A0512024-09-13013 September 2024 Issuance of Alternative Request VR-9, Revision 0, Associated with the Fourth 10-Year Inservice Testing Interval ML24256A0872024-09-11011 September 2024 Fws to NRC, Concurrence with Endangered Species Act Nlaa Determinations for Perry License Renewal ML24255A8032024-09-11011 September 2024 Technical Specification 5.6.6 Steam Generator Tube Inspection 180-Day Report L-24-201, Spent Fuel Storage Cask Registration2024-09-0909 September 2024 Spent Fuel Storage Cask Registration ML24250A0412024-09-0606 September 2024 Fws to NRC, Perry Nuclear Plant, Unit 1, License Renewal List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected ML24249A0882024-09-0606 September 2024 Letter to Rickey Armstrong, President_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0862024-09-0606 September 2024 Letter to Regina Gasco-Bentley, Chairperson_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0782024-09-0606 September 2024 Ltr. to Kenneth Meshigaud, Chairperson, _ Re., NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0752024-09-0606 September 2024 Letter to Charles Diebold, Chief_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24249A0762024-09-0606 September 2024 Letter to Douglas Lankford, Chief_ Re. NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24247A0212024-09-0606 September 2024 NRC Request for Concurrence with Endangered Species Act Determinations for Perry License Renewal, Issuance of Draft Supplemental Environmental Impact Statement, and Opportunity for Public Comment (Consultation Code: 2024-0006782) ML24166A0172024-09-0606 September 2024 Ltr. to Glenna Wallace, Chief, Eastern Shawnee Tribe of Oklahoma; Re., NOA of the Draft Site-Specific EIS and Finding of No Historic Properties Affected by Perry Plant Unit 1 Lr ML24255A8642024-09-0606 September 2024 Rscc Wire & Cable LLC Dba Marmon Industrial Energy & Infrastructure - Part 21 Retraction of Final Notification ML24249A1602024-09-0505 September 2024 Information Request to Support Upcoming Material Control and Accounting Inspection at Davis-Besse Nuclear Power Station L-24-200, License Renewal Application for Revision to Supplement 4 for Editorial Corrections2024-09-0505 September 2024 License Renewal Application for Revision to Supplement 4 for Editorial Corrections ML24228A1712024-09-0303 September 2024 Ltr to Brian Dickens, EPA-Perry Nuclear Power Plant Unit 1-Notice of Avail of the Draft Supp 61 to the GEIS for License Renew of Nuclear Plants ML24228A1702024-09-0303 September 2024 Ltr to Rod L. Penfield-Perry Nuclear Power Plant Unit 1-Notice of Avail of the Draft Supp 61 to the GEIS for License Renew of Nuclear Plants IR 05000334/20240052024-08-29029 August 2024 Updated Inspection Plan for Beaver Valley Power Station, Units 1 and 2 (Reports 05000334/2024005 and 05000412/2024005) L-24-188, Submittal of Quality Assurance Program Manual, Revision 302024-08-27027 August 2024 Submittal of Quality Assurance Program Manual, Revision 30 ML24240A1482024-08-27027 August 2024 Notification of an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information L-24-190, Spent Fuel Storage Cask Registration2024-08-26026 August 2024 Spent Fuel Storage Cask Registration ML24239A7782024-08-26026 August 2024 Aging Management Audit - Perry Unit 1 - License Renewal Application August 26 2024 ML24239A3972024-08-23023 August 2024 Rssc Wire & Cable LLC Dba Marmon - Part 21 Final Notification - 57243-EN 57243 IR 05000346/20240052024-08-22022 August 2024 Updated Inspection Plan for Davis-Besse Nuclear Power Station (Report 05000346/2024005) IR 05000334/20244022024-08-22022 August 2024 Security Baseline Inspection Report 05000334/2024402 and 05000412/2024402 (Cover Letter Only) L-24-199, Discharge Monitoring Report (NPDES) Permit No. PA00256152024-08-22022 August 2024 Discharge Monitoring Report (NPDES) Permit No. PA0025615 IR 05000440/20240052024-08-22022 August 2024 Updated Inspection Plan for Perry Nuclear Power Plant (Report 05000440/2024005) L-24-174, Response to Perry Nuclear Power Plant License Renewal Environmental Report Severe Accident Mitigation Alternatives 2nd Round Request for Additional Information2024-08-15015 August 2024 Response to Perry Nuclear Power Plant License Renewal Environmental Report Severe Accident Mitigation Alternatives 2nd Round Request for Additional Information 2024-09-09
[Table view] |
Text
Solutions Donald A. Moul President
& CNO FirstEnergy Solutions Generation Companies April 2, 2018 L-18-096 U.S. Nuclear Regulatory Commission, Region I Attention:
Regional Administrator 2100 Renaissance Boulevard, Suite 100 King of Prussia, Pennsylvania 19406-2713 U.S. Nuclear Regulatory Commission, Region Ill Attention:
Regional Administrator 2443 Warrenville Road Suite 210 Lisle, Illinois 60532-4352
SUBJECT:
Beaver Valley Power Station, Unit Nos. 1 and 2 Docket No. 50-334, License No. DPR-66 Docket No. 50-412, License No. NPF-73 Beaver Valley Power Station, Unit Nos. 1 and 2, ISFSI Docket No. 72-1043 Davis-Besse Nuclear Power Station, Unit No. 1 Docket No. 50-346, License No. NPF-3 Davis-Besse Nuclear Power Station, Unit No. 1 ISFSI Docket No. 72-14 Perry Nuclear Power Plant, Unit No. 1 Docket No. 50-440, License No. NPF-58 Perry Nuclear Power Plant, Unit No. 1 ISFSI Docket No. 72-69 Notification of Petition for Bankruptcy 341 White Pond Drive Akron, OH 44320 330-315-6800 10 CFR 30.34(h)(1) 10 CFR 40.41(f)(1) 10 CFR 50.54(cc)(1) 10 CFR 70.32(a)(9) 10 CFR 72.44(b)(6)
Pursuant to 10 CFR 30.34(h)(1
), 10 CFR 40.41 (f)(1 ), 10 CFR 50.54(cc)(1
), 10 CFR 70.32(a)(9), and 10 CFR 72.44(b )(6), FirstEnergy Nuclear Operating Company, acting on behalf of itself and as agent for and on behalf of FirstEnergy Nuclear Generation, LLC and its parent company, FirstEnergy Solutions Corp., hereby notifies the Nuclear Regulatory Commission (NRC)
Beaver Valley Power Station, Unit Nos. 1 and 2 Davis-Besse Nuclear Power Station, Unit No. 1 Perry Nuclear Power Plant, Unit No. 1 L-18-096 Page2 that a voluntary petition for relief under Chapter 11 of Title 11 of the United States Code has been filed March 31, 2018 on behalf of each of these entities in the United States Bankruptcy Court for the Northern District of Ohio, Eastern Division.
There are no regulatory commitments contained in this letter. If there are any questions, or if additional information is required, please contact Mr. Thomas A. Lentz, Manager -Fleet Licensing, at 330-315-6810.
Sincerely, Donald A. Moul cc: Director, Office of Nuclear Reactor Regulation General Counsel, Office of the General Counsel NRC Document Control Desk NRC Project Manager -Beaver Valley Power Station, Unit Nos. 1 and 2 NRC Project Manager -Davis-Besse Nuclear Power Station, Unit No. 1 NRC Project Manager -Perry Nuclear Power Plant, Unit No. 1 NRC Project Manager -FirstEnergy Nuclear Operating Company Fleet NRC Resident Inspector
-Beaver Valley Power Station, Unit Nos. 1 and 2 NRC Resident Inspector
-Davis-Besse Nuclear Power Station, Unit No. 1 NRC Resident Inspector
-Perry Nuclear Power Plant, Unit No. 1 Director BRP/DEP Site BRP/DEP Representative
-Beaver Valley Power Station, Unit Nos. 1 and 2 Utility Radiological Safety Board