ML13196A258

From kanterella
Revision as of 20:42, 4 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Oconee, Units 1, 2, and 3, Independent Spent Fuel Storage Installation, Updated Final Safety Analysis Report (UFSAR) 2012 Revision
ML13196A258
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 07/01/2013
From: Batson S L
Duke Energy Carolinas
To:
Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
Download: ML13196A258 (10)


Text

4 DUKE Scott L. BatsonENERGY. Vice President Oconee Nuclear StationDuke EnergyONOIVP 17800 Rochester HwySeneca, SC 2967210 CFR 72.70(b) o: 864.873.3274 f 864.873.

4208Scott.Batson@duke-energy.com July 1, 2013Director, Office of Nuclear MaterialSafety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

Duke Energy Carolinas, LLC (Duke Energy)Oconee Nuclear Station, Units 1, 2, and 3Docket Nos. 72-4, 50-269, 50-270, 50-287Independent Spent Fuel Storage Installation Updated Final Safety Analysis Report (UFSAR)2012 RevisionPursuant to 10 CFR 72.70(b),

enclosed is a copy of the 2012 revision to the OconeeIndependent Spent Fuel Storage Installation UFSAR. The effective date of the revision isDecember 31, 2012.The first part of the enclosure provides instructions for inserting this revision into existingmanuals including a list of effective pages required by 10 CFR 72.70(b).

This submittal document contains no regulatory commitments.

If there are any questions, please contact Susan Perry at (864) 873-4370.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on the 1st dayof July, 2013.Sincerely, Scott L. BatsonEnclosure.

www.duke-energy.com U. S. Nuclear Regulatory Commission July 1, 2013Page 2xc:Mr. Victor McCreeAdministrator, Region IIU.S. Nuclear Regulatory Commission Marquis One Tower245 Peachtree Center Ave., NE, Suite 1200Atlanta, GA 30303-1257 Mr. John BoskaProject ManagerU.S. Nuclear Regulatory Commission 11555 Rockville PikeMail Stop O-8G9ARockville, MD 20852-2746 Mr. Ed CroweSenior Resident Inspector Oconee Nuclear Station ONS ISFSI UFSAR UPDATEINSERTION INSTRUCTIONS Submittal Due Date: 6/30/13Effective Date: 12/31/121. Replace List of Effective Pages (LOEP) for Tables and Figures with the 2012 LOEP Update.2. Replace entire text portions (including the Table of Contents, List of Tables, List of Figures and Listof Abbreviations) with the updated text portion.3. Update Tables and Figures according to the following instructions NOTE: No Tables or Figures were updated on this revision.

OCONEE ISFSI UFSAR -2012 UPDATEList of Effective Pages (LOEP) for Table and FiguresThe purpose of this list is to assure that the pages in the Tables and Figures section of your manual matchthe most recent issue, as well as to show a full accounting of all tables and figures, including those thathave been deleted.

The earliest effective date, 12/31/07, was used when all tables and figures were re-issued.Effective Table Table TitleDate No.12/31/07 A-i Design Parameters for the Oconee ISFSI12/31/07 A-2 Summary of ISFSI Fuel Handling Operations 12/31/07 A-3 Primary Design Parameters for the ISFSI Transport System12/31/07 A-4 Major Systems, Subsystems, and Components of the Oconee ISFSI12/31/07 A-5 Population Growth in Oconee, Pickens, and Anderson

Counties, South Carolina (1980-2005)12/31/07 A-6 Population Projections for Oconee, Pickens, and Anderson
Counties, South Carolina(2010-2050) 12/31/07 A-7 Joint Frequencies of Wind Distribution and Speed by Stability Class (Pages 1-6)12/31/07 A-8 Soil Permeability Test Results12/31/07 A-9 Significant Earthquakes in the Southeast United States (Intensity V or Greater)

(Pages1-5)12/31/07 A-10 Physical Characteristics of PWR Fuel Assemblies Based on Nominal Design12/31/07 A- 1I Transfer Cask Stress Analysis for Tornado Effects12/31/07 A-12 Oconee ISFSI Major Components and Functions 12/31/07 A- 13 Oconee ISFSI Radioactive Material Confinement Barriers12/31/07 A-14 Oconee ISFSI Major Components and Design Requirements 12/31/07 A-15 ONS ISFSI Project Transfer Trailer Design Parameters 12/31/07 A-16 Oconee ISFSI Major Components and Classification 12/31/07 A-17 Gamma Energy Spectrum12/31/07 A-18 Shielding Analysis Results (Pages 1-2)12/31/07 A-19 Summary of Estimated On-site Doses Resulting from ISFSI Operation (Per DSCTransfer to HSM) (Pages 1-2)12/31/07 A-20 Dose Estimate for Construction of Additional Horizontal Storage Modules Based onLabor Estimates for 2 X 10 Array12/31/07 A-21 Neutron and Gamma Energy Spectrum12/31/07 A-22 Comparison of Total Dose Rates for HSM With and Without Air Outlet Shielding Blocks12/31/07 A-23 Cask Drop Target Parameters Effective Date: 12/31/12 Page 2 of 3Effective Figure Figure TitleDate No.12/31/07 B-1 Location of ISFSI12/31/07 B-2 General Location12/31/07 B-3 Site Plan12/31/07 B-4 ISFSI Layout12/31/07 B-5 Topography Within 5. Miles12/31/07 B-6 Relative Positions of Meteorological Instruments 12/31/07 B-7 Relative Elevation of Meteorological Instruments 12/31/07 B-8 Areal Groundwater Survey12/31/07 B-9 Groundwater Survey at Station Site12/31/07 B- 10 Well Permeameter Test Apparatus 12/31/07 B-11 Formulae for Determining Permeability 12/31/07 B-12 General Site Area12/31/07 B-13 Site Boring Plan12/31/07 B-14 Core Boring Record (Pages 1-2)12/31/07 B-15 Core Boring Record (Pages 1-2)12/31/07 B-16 Core Boring Record12/31/07 B-17 Core Boring Record12/31/07 B-18 Core Boring Record (Pages 1-2)12/31/07 B-19 Core Boring Record (Pages 1-2)12/31/07 B-20 Core Boring Record (Pages 1-2)12/31/07 B-21 Core Boring Record (Pages 1-2)12/31/07 B-22 Core Boring Record (Pages 1-2)12/31/07 B-23 Core Boring Record12/31/07 B-24 Core Boring Record (Pages 1-2)12/31/07 B-25 Core Boring Record (Pages 1-2)12/31/07 B-26 Core Boring Record (Pages 1-2)12/31/07 B-27 Core Boring Record12/31/07 B-28 ISFSI Foundation Profile12/31/07 B-29 Site Layout and Route12/31/07 B-30 Site Plan12/31/07 B-31 Transfer Cask Lifting Yoke12/31/07 B-32 Transfer Cask Lift Extension 12/31/07 B-33 Spent Fuel Pool AreaEffective Date: 12/31/12 Page 3 of 3Effective Figure Figure TitleDate No.12/31/07 B-3412/31/07 B-3512/31/07 B-3612/31/07 B-3712/31/07 B-3812/31/07 B-3912/31/07 B-4012/31/07 B-4112/31/07 B-4212/31/07 B-4312/31/07 B-4412/31/07 B-4512/31/07 B-46B-4712/31/07 B-48Spent Fuel Pool AreaSpent Fuel Pool AreaNUHOMSO System Loading Operations Flowchart NUHOMSb System Loading Operations Flowchart NUHOMS System Loading Operations Flowchart NUHOMS System Loading Operations Flowchart NUHOMS System Loading Operations Flowchart NUHOMS System Loading Operations Flowchart Location of Dose RatesDose Rate Versus Distance from Surface of HSMDose from Filled HSM ArrayDose from Filled HSM ArrayRadiation Zone Map of Modules Surface Dose RatesDeleted Per 1991 UpdateFuel Assembly Burnup Requirements Effective Date: 12/31/12 ONS ISFSI UFSAR UPDATEINSERTION INSTRUCTIONS Submittal Due Date: 6/30/13Effective Date: 12/31/121. Replace List of Effective Pages (LOEP) for Tables and Figures with the 2012 LOEP Update.2. Replace entire text portions (including the Table of Contents, List of Tables, List of Figures and Listof Abbreviations) with the updated text portion.3. Update Tables and Figures according to the following instructions NOTE: No Tables or Figures were updated on this revision.

OCONEE ISFSI UFSAR -2012 UPDATEList of Effective Pages (LOEP) for Table and FiguresThe purpose of this list is to assure that the pages in the Tables and Figures section of your manual matchthe most recent issue, as well as to show a full accounting of all tables and figures, including those thathave been deleted.

The earliest effective date, 12/31/07, was used when all tables and figures were re-issued.Effective Table Table TitleDate No.12/31/07 A-I Design Parameters for the Oconee ISFSI12/31/07 A-2 Summary of lSFSI Fuel Handling Operations 12/31/07 A-3 Primary Design Parameters for the ISFSI Transport System12/31/07 A-4 Major Systems, Subsystems, and Components of the Oconee ISFSI12/31/07 A-5 Population Growth in Oconee, Pickens, and Anderson

Counties, South Carolina (1980-2005)12/31/07 A-6 Population Projections for Oconee, Pickens, and Anderson
Counties, South Carolina(2010-2050) 12/31/07 A-7 Joint Frequencies of Wind Distribution and Speed by Stability Class (Pages 1-6)12/31/07 A-8 Soil Permeability Test Results12/31/07 A-9 Significant Earthquakes in the Southeast United States (Intensity V or Greater)

(Pages1-5)12/31/07 A-10 Physical Characteristics of PWR Fuel Assemblies Based on Nominal Design12/31/07 A-] I Transfer Cask Stress Analysis for Tornado Effects12/31/07 A-12 Oconee ISFSI Major Components and Functions 12/31/07 A-13 Oconee ISFSI Radioactive Material Confinement Barriers12/31/07 A-14 Oconee ISFSI Major Components and Design Requirements 12/31/07 A-15 ONS ISFSI Project Transfer Trailer Design Parameters 12/31/07 A-16 Oconee ISFSI Major Components and Classification 12/31/07 A- 17 Gamma Energy Spectrum12/31/07 A-18 Shielding Analysis Results (Pages 1-2)12/31/07 A-19 Sunmmary of Estimated On-site Doses Resulting from ISFSI Operation (Per DSCTransfer to HSM) (Pages 1-2)12/31/07 A-20 Dose Estimate for Construction of Additional Horizontal Storage Modules Based onLabor Estimates for 2 X 10 Array12/3 1/07 A-21 Neutron and Gamma Energy Spectrum12/31/07 A-22 Comparison of Total Dose Rates for HSM With and Without Air Outlet Shielding Blocks12/31/07 A-23 Cask Drop Target Parameters Effective Date: 12/31/12 Page 2 of 3Effective Figure Figure TitleDate No.12/31/07 B-1 Location of ISFSI12/31/07 B-2 General Location12/31/07 B-3 Site Plan12/31/07 B-4 ISFSI Layout12/31/07 B-5 Topography Within 5 Miles12/31/07 B-6 Relative Positions of Meteorological Instruments 12/31/07 B-7 Relative Elevation of Meteorological Instruments 12/31/07 B-8 Areal Groundwater Survey12/31/07 B-9 Groundwater Survey at Station Site12/31/07 B-10 Well Penneameter Test Apparatus 12/31/07 B-I l Formulae for Determining Permeability 12/31/07 B-12 General Site Area12/31/07 B-13 Site Boring Plan12/31/07 B-14 Core Boring Record (Pages 1-2)12/31/07 B-15 Core Boring Record (Pages 1-2)12/31/07 B- 16 Core Boring Record12/31/07 B- 17 Core Boring Record12/31/07 B-18 Core Boring Record (Pages 1-2)12/31/07 B-19 Core Boring Record (Pages 1-2)12/31/07 B-20 Core Boring Record (Pages 1-2)12/31/07 B-21 Core Boring Record (Pages 1-2)12/31/07 B-22 Core Boring Record (Pages 1-2)12/31/07 B-23 Core Boring Record12/31/07 B-24 Core Boring Record (Pages 1-2)12/31/07 B-25 Core Boring Record (Pages 1-2)12/31/07 B-26 Core Boring Record (Pages 1-2)12/31/07 B-27 Core Boring Record12/31/07 B-28 ISFSI Foundation Profile12/31/07 B-29 Site Layout and Route12/31/07 B-30 Site Plan12/31/07 B-31 Transfer Cask Lifting Yoke12/31/07 B-32 Transfer Cask Lift Extension 12/31/07 B-33 Spent Fuel Pool AreaEffective Date: 12/31/12 Page 3 of 3Effective Figure Figure TitleDate No.12/31/07 B-3412/31/07 B-3512/31/07 B-3612/31/07 B-3712/31/07 B-3812/31/07 B-3912/31/07 B-4012/31/07 B-4112/31/07 B-4212/31/07 B-4312/31/07 B-4412/31/07 B-4512/31/07 B-46B-4712/31/07 B-48Spent Fuel Pool AreaSpent Fuel Pool AreaNUHOMS System Loading Operations Flowchart System Loading Operations Flowchart NUHOMS System Loading Operations Flowchart NUHOMS System Loading Operations Flowchart NUHOMS System Loading Operations Flowchart NUHOMS System Loading Operations Flowchart Location of Dose RatesDose Rate Versus Distance from Surface of HSMDose from Filled HSM ArrayDose from Filled HSM ArrayRadiation Zone Map of Modules Surface Dose RatesDeleted Per 1991 UpdateFuel Assembly Burnup Requirements Effective Date: 12/31/12