Briefing Slides for Commission Assistants Brief on Oconee Flood Protection and the Jocassee Dam Hazard
ML14058A025
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 08/12/2008
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML14055A421 List: ... further results
References
FOIA/PA-2012-0325
Download: ML14058A025 (11)


Text

1US.NRC '-nn"ernai"-

)pmoicixi;

~peop ad dtr~i~ ~ mmiIOconee Flood Protection and theJocassee Dam HazardCommission Assistants briefAugust 12, 200810/3/2012

,,Official U nly -Sens' emai m 'n1D wo

/ 2U.S.NRC I o,-aPmkig htpk : at brnon~etOverview, Objective

-Provide background information for issue.-Attain senior management alignment on issuance of arequest for information per 10 CFR 50.54(f).

Alignments meetings held within NRR (7/28) and betweenNRR, RII, OE and OGC (8/1) for path forward on letter., Success-Understanding of the regulatory and safety issues.-Confirmation of the path forward to resolve issue.10/3/2012 Official e ly -Sen ive 2ternalin ma n (iUS.NRCPrdm5 Ptoyk ad GdwFriromwaes\In'trral Infor eThe oo cenarioRupture of Jocassee DamI JocasseeNioNlrnois toe .385-ftMeeaway__ Nine Timesark " ' o" Six Mile1d PickenaC a l10/3/2012 3

ýUOS.NRCfteain Pkpt.md the Earimmmi:

JOciae Inem __ o tiionJo cwassee uam Aerial1013/2012 4

~US.NRC~MrD1TO"I AUrol f Wc'j Mr,I I ~ChIPepcAtirmnI 5

~US.NRC0IDSTi~QI ftN WVCL OM SMUNLMPr*cdwZPoap&

W dw £mvntrnume

,' , I Use lin\ ensitieThet talF nfoor arrierThe SSF Flood BarriersIf'"'-'4"10/3/2012 6

(USSRCPIutiqD op an WA~ Er.4rmeKey Insights from Reactor Oversight Process, Staff discovered that the Jocassee dam failureissue had not been adequately resolved.

, Duke Hydro/FERC Inundation Study completed in early 1990s. Estimated flood heights up to16.8 ft above SSF grade level.* Floods in excess of 5 ft lead to three-unit coredamage event., Staff identified an under-estimate in licensee's dam failure frequency.

10/3/2012 fia y Sensiivq7 Inerna t

-~U.S.NRC (1WIU~VIIssuance 50.54() Letter50.54 letter is best regulatory approach to initiateresolution.

Goal to issue letter by August 8.Letter seeks information to assure protection of publicand elevates NRC's regulatory and safety concerns.

  • Letter states that Jocassee Dam Failure Inundation Study indicates flood heights up to 16.8 feet above SSFgradeNRR Director and Region Il Administrator to have jointcall with Duke senior management when letter is issued.Brief Commissioner Assistants prior to letter issuance.

10/312012 icial Us My -Se 'tive 8Internal In rm on I$yUSNRCPrcmPeopl aid 11w EavirmwNgt Actions Concurrent with 50.54(f)

Letter* Backfit evaluation:

external flooding withinlicensing basis, Licensee did not addressJocassee dam failure.Cost-benefit estimate of $3 million inmodifications.

Modifications on the order of $13million justified, 10/3/2012 9

~U.STINRU

=%W%'lEDti Eo l Actions Concurrent with 50.54() Letter(continued)

Generic issue preliminary assessment completed.

-Twenty five sites have a dependency on dam performance.

Eightsites (including Oconee) have dams up river of the site.-Draft Information Notice has been written., Communication plan developed for Oconee actions andgeneric implications.

Plan covers internal stakeholders only because information concerning issue is sensitive.

Justification for continued interim operations of Oconeein progress.

10/3/2012 0 i Use y Sensiti e 10Interna Inform ?iom

' icial Use y -

USRC al Inforom 10cr~ng hople adAtA E~rn-miled Followoup Actions After Issuanceof 50.54() Letter, Prepare a draft Safety Order to direct Oconeeplant modifications and modify Oconee license.* NRC senior management to call Duke seniormanagement when letter is issued.* Evaluate licensee's response to letter., Determine if Safety Order is the appropriate regulatory vehicle.10/3/2012 11