IR 05000390/2014001

From kanterella
Revision as of 03:26, 1 July 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
Jump to navigation Jump to search
Annual Assessment Letter for Watts Bar Nuclear Plant Unit 1, NRC Inspection Report 05000390/2014001
ML15063A454
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 03/04/2015
From: King M F
Reactor Projects Region 2 Branch 6
To: Shea J W
Tennessee Valley Authority
References
IR 2014001
Download: ML15063A454 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303

-1257 March 4, 2015 Mr. Joseph Vice President, Nuclear Licensing Tennessee Valley Authority 1101 Market Street, LP 3D

-C Chattanooga, TN 37402

-2801

SUBJECT: ANNUAL ASSESSMENT LETTER FOR WATTS BAR NUCLEAR PLANT UNIT 1, NRC INSPECTION REPORT 05000390/2014001

Dear Mr. Shea:

On February 10

, 2015, the NRC completed its end-of-cycle performance review of Watts Bar Nuclear Plant Unit 1

. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2014, through December 31, 2014. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Watts Bar Unit 1 operated in a manner that preserved public health and safety and met all cornerstone objectives.

The NRC determined the performance at the Watts Bar Nuclear Plant Unit 1 during the most recent quarter was within the Licensee Response Column of the NRC

's Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The enclosed inspection plan lists the inspections scheduled through June 30, 2016. Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

This inspection plan does not include security related inspections, which will be sent via separate, non

-publicly available correspondence.

In addition to the ROP baseline inspections at your facility, we also plan on conducting infrequently performed inspections which include: Temporary Instruction (TI) 191, "

Inspection of the Implementation of Mitigation Strategies and Spent Fuel Pool Instrumentation Orders and Emergency Preparedness Communication

/Staffing/Multi-Unit Dose Assessment Plans," Inspection Procedure (IP) 43004, "Inspection of Commercial

-Grade Dedication Programs

," and an initial operator license examination. In accordance with 10 CFR 2.390 of the NRC's "Agency Rules of Practice and Procedure

," a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading

-rm/adams.html (the Public Electronic Reading Room).

Please contact me at (404) 997-4511 with any questions you have regarding this letter.

Sincerely,/RA/ Michael F. King, Chief Reactor Projects Branch 6 Division of Reactor Projects Docket No.

50-390 License No.
NPF-90

Enclosure:

Watts Bar Inspection/Activity Plan (03/01/2015 - 06/30/2016) cc Distribution via List Serv

________________

SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP RII:DRP SIGNATURE

/RA By SRS5/

/RA By MFK1/

NAME SSandal MKing DATE 3/ /2015 3/ /2015 3/ /2015 3/ /2015 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO Letter to Joseph from Michael F. King dated March 4, 2015

SUBJECT: ANNUAL ASSESSMENT LETTER FOR WATTS BAR NUCLEAR PLANT UNIT 1, NRC INSPECTION REPORT 05000390/2014001

Distribution w/encl

D. Gamberoni, RII L. Gibson, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMWattsBar Resource ROP Assessment ROP Reports Institute of Nuclear Power Operations (INPO)

Page 1 of 1 02/05/2015 08:20:27Report 22 UnitNumberPlanned Dates Start EndInspection ActivityTitleNo. of Staff on SiteWatts BarInspection / Activity Plan 03/01/2015

-06/30/2016 HS-TRIENNIAL HEAT SINK PERFORMANCE 11 IPHeat Sink Performance7111107T06/08/2015 06/12/2015OL EXAM-INITIAL LICENSE EXAM PREP 31 WATTS BAR U1/JULY 2015 INITIAL EXAM AT POWER FACILITIES V2342306/22/2015 06/26/2015OL EXAM-INITIAL LICENSE EXAM 31 WATTS BAR U1/JULY 2015 INITIAL EXAM AT POWER FACILITIES V2342307/20/2015 07/24/2015 RP-RP OCCUPATIONAL BASELINE WEEK 1 31 IPRadiological Hazard Assessment and Exposure Controls71124.0110/05/2015 10/09/2015 1 IPOccupational ALARA Planning and Controls71124.0210/05/2015 10/09/2015 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/05/2015 10/09/2015 1 IPOccupational Dose Assessment71124.0410/05/2015 10/09/2015 1 IPRadiation Monitoring Instrumentation71124.0510/05/2015 10/09/2015 1 IPPerformance Indicator Verification7115110/05/2015 10/09/2015 ISI-UNIT 1 IN-SERVICE INSPECTION 11 IPInservice Inspection Activities - PWR7111108P10/12/2015 10/16/2015 RP-RP OCCUPATIONAL BASELINE WEEK 2 21 IPRadiological Hazard Assessment and Exposure Controls71124.0110/19/2015 10/23/2015 1 IPOccupational ALARA Planning and Controls71124.0210/19/2015 10/23/2015 1 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0310/19/2015 10/23/2015 1 IPOccupational Dose Assessment71124.0410/19/2015 10/23/2015 1 IPRadiation Monitoring Instrumentation71124.0510/19/2015 10/23/2015 1 IPPerformance Indicator Verification7115110/19/2015 10/23/2015 EP-EP EXERCISE 81 IPEmergency Action Level and Emergency Plan Changes711140411/16/201511/20/2015 1 IPExercise Evaluation - Hostile Action (HA) Event711140711/16/201511/20/2015 1 IPPerformance Indicator Verification7115111/16/201511/20/2015 CDBI-COMPONENT DESIGN BASES INSPECTION 71 IPComponent Design Bases Inspection711112102/01/2016 02/05/2016 1 IPComponent Design Bases Inspection711112102/29/2016 03/04/2016 1 IPComponent Design Bases Inspection711112103/14/2016 03/18/2016 1 IPComponent Design Bases Inspection711112103/28/2016 04/01/2016OL EXAM-INITIAL LICENSE EXAM PREP 31 WATTS BAR JULY 2016 INITIAL EXAM AT POWER FACILITIES V2347506/20/2016 06/24/2016 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.