IR 05000341/2018410

From kanterella
Revision as of 00:12, 3 May 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Fermi Power Plant, Unit 2 - NRC Security Baseline Inspection Report 05000341/2018410 (Cover Letter Only) (DRS-N.Egan)
ML18108A483
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 04/18/2018
From: Orth S K
Plant Support Branch II
To: Polson K
DTE Energy
References
IR 2018410
Download: ML18108A483 (3)


Text

April 18, 2018

Mr. Keith Polson, Senior VP and Chief Nuclear Officer DTE Energy Company Fermi 2 - 260 TAC 6400 North Dixie Highway Newport, MI 48166 SUBJECT: FERMI POWER PLANT, UNIT 2-NRC SECURITY BASELINE INSPECTION REPORT 05000341/2018410

Dear Mr. Polson,

On March 8, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a Security Inspection at your Fermi Nuclear Power Plant, Unit 2 and the NRC inspector discussed the results of this inspection with you and other members of your staff. The results of the inspection are documented in the enclosed report. The NRC inspector did not identify any finding or violation of more-than-minor significance. This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (CFR), Part 2.390, "Public Inspections, Exemptions, Requests for Withholding." However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii). Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely,/RA/ Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 Nonpublic

Enclosure:

IR 05000341/2018410 cc: M. O'Connor, Security Manager D. Asselin, State Liaison Officer, State of Michigan cc w/o encl: Distribution via LISTSERV