OFFICIAL USE ONLY - SECURITY RELATED INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this transmittal document is decontrolled.
LIMITED INTERNAL DISTRIBUTION PERMITTED OFFICIAL USE ONLY - SECURITY RELATED INFORMATION October 31, 2013 Mr. George T. Hamrick Vice President
Shearon Harris Nuclear Power Plant
Carolina Power and Light Company
P.O. Box 165, Mail Code: Zone 1 New Hill, NC 27562-0165
SUBJECT: SHEARON HARRIS NUCLEAR PLANT - NRC TEMPORARY INSTRUCTION 2515/186 INSPECTION REPORT 0500400/2013404 Dear Mr. Hamrick: On October 3, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Shearon Harris Nuclear Plant using Temporary Instruction 2515/186, "Inspection of
Procedures and Processes for Responding to Potential Aircraft Threats". The enclosed
inspection report documents the inspection results which were discussed on October 3, 2013,
with Mr. John Onfner and other members of your staff.
The objective of this inspection was to assess the implementation procedures and processes of
Shearon Harris Nuclear Plant that are required by Title 10 of the Code of Federal Regulations (CFR), Part 50.54(hh)(1), which provides the requirements for responding to a potential aircraft
threat. The results from this inspection, along with the results from this inspection performed at
other operating commercial nuclear plants in the United States, will be used to evaluate the U.S.
nuclear industry's readiness to safely respond to similar events. These results will also help the
NRC to determine if additional regulatory actions are warranted. No findings were identified during this inspection.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be
available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system, ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION G. Hamrick 2 OFFICIAL USE ONLY - SECURITY RELATED INFORMATION NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from public disclosure under 10 CFR 2.390" in accordance
with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390 (b)(1).
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
Sincerely,
/RA/
Mark E. Franke, Chief
Operations Branch 2 Division of Reactor Safety
Docket No. 50-400
License No. NPF-64
Enclosure: Inspection Report 0500400/2013404 w/Attachment: Supplemental Information (Official Use Only)
cc: (See page 3)
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION G. Hamrick 2 OFFICIAL USE ONLY - SECURITY RELATED INFORMATION NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from public disclosure under 10 CFR 2.390" in accordance
with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390 (b)(1).
In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response contained in the enclosure, and in accordance with 10 CFR 2.390, a copy of this letter's enclosure will not be available for public inspection.
Sincerely,
/RA/
Mark E. Franke, Chief
Operations Branch 2 Division of Reactor Safety Docket No. 50-400
License No. NPF-64 Enclosure: Inspection Report 0500400/2013404 w/Attachment: Supplemental Information (Official Use Only) cc: (See page 3)
PUBLICLY AVAILABLE x NON-PUBLICLY AVAILABLE x SENSITIVE NON-SENSITIVE ADAMS: x Yes ACCESSION NUMBER:_________________________ x SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS RII;DRS RII:DRS SIGNATURE RA RA RA RA RA NAME DLANYI AGOLDAU BBONSER BDESAI MFRANKE DATE 10/31/2013 10/31/2013 10/24/2013 10/29/2013 10/31/2013 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO OFFICIAL RECORD COPY DOCUMENT NAME: G:\DRSII\OBII\TI-186 INSPECTIONS\HARRIS\HARRIS TI-186 INSPECTION REPORT.DOCX
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION G. Hamrick 3 OFFICIAL USE ONLY - SECURITY RELATED INFORMATION cc: Lara S. Nichols
Deputy General Counsel
Duke Energy Corporation
550 S.Tyron Street Mail Code DEC45A Charlotte, NC 28202
Ernest J. Kapopoulos Jr.
Plant General Manager Carolina Power and Light Company Shearon Harris Nuclear Power Plant
5413 Shearon Harris Road
New Hill, NC 27562
Terrence E. Slake Manager
Nuclear Plant Security
Shearon Harris Nuclear Power Plant
5413 Shearon Harris Road
New Hill, NC 27562 Progress Energy Carolinas, Inc.
ATTN: Mr. Donald L. Griffith
Training Manager
Harris Energy & Env. Center Shearon Harris Nuclear Power Plant P.O. Box 327, State Road 1127
New Hill, NC 27562-0165
OFFICIAL USE ONLY - SECURITY RELATED INFORMATION OFFICIAL USE ONLY - SECURITY RELATED INFORMATION Letter to George T. Hamrick from Mark E. Franke dated October 31, 2013.
SUBJECT: SHEARON HARRIS NUCLEAR PLANT - NRC TEMPORARY INSTRUCTION 2515/186 INSPECTION REPORT 0500400/2013404
Distribution: RidsNrrPMShearonHarris Resource C. Evans, RII EICS
L. Douglas, RII EICS
RIDSNRRDIRS
PUBLIC S. Coker, NSIR/DSO/DDSO/ST T. Dimitriadis, RI
R. Albert, NSIR B. Desai, RII
B. Huffman, NSIR/DPR/DDIR/OB D. Funk, RIII J. Kozal, NSIR/DPR/DDIR/CB M. Haire, RIV E. Bowman, NRR/DPR/PGCB [Any required agreement state distribution]