ML12065A380 | |
Person / Time | |
---|---|
Site: | Brunswick ![]() |
Issue date: | 03/26/2012 |
From: | Susco J J NRC/NRR/DLR/RERGUB |
To: | Crabtree R US Dept of Commerce, National Marine Fisheries Service |
Balsam B | |
References | |
Download: ML12065A380 (22) | |
Similar Documents at Brunswick | |
---|---|
Category:Letter
MONTHYEARIR 05000324/20230112023-12-26026 December 2023
[Table view]NRC Fire Protection Team Inspection - FPTI Report 05000324/2023011 and 05000325/2023011 IR 05000324/20234022023-12-14014 December 2023 Security Baseline Inspection Report 05000324-2023402 and 05000325-2023402 ML23297A0262023-11-27027 November 2023 Proposed Alternatives to ASME Code Section XI Subsection IWE Requirements for Torus Metallic Liner Inspections ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230032023-11-0101 November 2023 Integrated Inspection Report 05000324/2023003 and 05000325/2023003 IR 05000324/20230102023-10-17017 October 2023 Biennial Problem Identification and Resolution Inspection Report 05000324/2023010 and 05000325/2023010 IR 05000325/20234012023-10-16016 October 2023 Security Baseline Inspection Report 05000324 and 05000325 2023401 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000324/20230052023-08-23023 August 2023 Updated Inspection Plan for Brunswick Steam Electric Plant, Units 1 and 2 (Report 05000324/2023005 and 05000325/2023005) IR 05000324/20230022023-08-0404 August 2023 Integrated Inspection Report 05000324/2023002 and 05000325/2023002 ML23201A2042023-07-28028 July 2023 Summary of Regulatory Audit in Support of Alternative Request RA-22-0308 for Inservice Inspection of the Torus Metallic Liner IR 05000324/20243012023-07-25025 July 2023 Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 ML23212B2682023-07-25025 July 2023 Notification of Licensed Operator Initial Examination 05000325/2024301 and 05000324/2024301 ML23146A0012023-05-24024 May 2023 EN 56538 - Engine Systems Inc and Brunswick ML23212A9502023-05-24024 May 2023 Engine Systems, Inc., Part 21 Report Re Woodward EGB-35P Governor/Actuator with Foreign Material ML23130A3902023-05-12012 May 2023 Regulatory Audit Plan in Support of Alternative Request RA 22-0308 for Inservice Inspection of the Torus Metallic Liner IR 05000324/20230012023-05-10010 May 2023 Integrated Inspection Report 05000324 2023001 and 05000325 2023001 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI IR 05000324/20220042023-04-0404 April 2023 Reissue - Brunswick Steam Electric Plant - Integrated Inspection Report 05000324/2022004 and 05000325/022004 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility IR 05000324/20220062023-03-0101 March 2023 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 NRC Inspection Reports 05000324/2022006 and 05000325/2022006 ML23033A5252023-02-0808 February 2023 Integrated Inspection Report 05000324/2022004 and 05000325/2022004 IR 05000324/20223012023-02-0303 February 2023 NRC Operator License Examination Report 05000325/2022301 and 05000324/2022301 IR 05000324/20224022022-11-23023 November 2022 Security Baseline Inspection Report 05000324 2022402 and 05000325 2022402 ML22332A0132022-11-23023 November 2022 Operator Licensing Written Examination Approval 05000325/2022301 and 05000324/2022301 ML22096A0032022-11-18018 November 2022 McGuire Nuclear Station and Shearon Harris Nuclear Power Plant Authorization of RA-19-0352 Regarding Use of Alternative for RPV Head Closure Stud Examinations ML22256A2532022-11-14014 November 2022 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-541, Rev. 2 IR 05000324/20224032022-11-10010 November 2022 Cyber Security Inspection Report 05000324/2022403 and 05000325/2022403 ML22307A1762022-11-0707 November 2022 Notification of an NRC Fire Protection Team Inspection (FPTI) IR 05000324/20220032022-11-0707 November 2022 Integrated Inspection Report 05000324/2022003 and 05000325/2022003 ML22258A0302022-09-15015 September 2022 Evacuation Time Estimate Reports IR 05000324/20220052022-08-24024 August 2022 Updated Inspection Plan for Brunswick Steam Electric Plant (Report 05000324/2022005 and 05000325/2022005) ML22230D0692022-08-22022 August 2022 Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-ichi Accident IR 05000324/20220022022-08-0505 August 2022 Integrated Inspection Report 05000324/2022002 and 05000325/2022002 IR 05000324/20220102022-06-27027 June 2022 Design Basis Assurance Inspection (Teams) Inspection Report 05000324 2022010 and 05000325 2022010 ML22028A1742022-05-12012 May 2022 Issuance of Amendment Nos. 309 and 337 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-580, Revision 1 IR 05000324/20220012022-05-10010 May 2022 Integrated Inspection Report 05000324/2022001 and 05000325/2022001 ML22119A1352022-05-0909 May 2022 Information Request for the Cyber-Security Baseline Security Inspection, Notification to Perform Inspection 05000325/2022403; 05000324/2022403 ML22082A2682022-05-0202 May 2022 Issuance of Amendment Nos. 308 and 336 Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-505, Revision 2 ML22102A0502022-04-11011 April 2022 301 Corporate Notification Letter IR 05000324/20224012022-03-16016 March 2022 Security Baseline Inspection Report 05000324/2022401 and 05000325/2022401 ML22054A2152022-03-0808 March 2022 Correction to Amendments to Revise Standby Liquid Control System Boron Solution Storage Tank Volume Technical Specifications IR 05000324/20210062022-03-0202 March 2022 Annual Assessment Letter for Brunswick Steam Electric Plant, Units 1 and 2 (Reports No. 05000324/2021006 and 05000325/2021006) IR 05000324/20210042022-02-14014 February 2022 Integrated Inspection Report 05000324/2021004 and 05000325/2021004 ML22035A1262022-02-0909 February 2022 Withdrawal of Exemption Request from the Requirements of 10 CFR Part 50, Appendix E, Section IV.F.2.d (EPID L-2021-LLE-0055 (COVID-19)) ML21354A5032022-01-24024 January 2022 Requested Exemption from 10 CFR 50, Appendix E, Section IV.F.2.D Not Required (EPID L-2021-LLE-0055 (COVID-19)) ML22018A1842022-01-18018 January 2022 Notification of Brunswick Steam Electric Plant, Units 1 & 2 - Design Bases Assurance Inspection - U.S. Nuclear Regulatory Inspection Report 05000324/2022010 and 05000325/2022010 ML21348A7192021-12-21021 December 2021 Regulatory Audit Summary Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times 2023-09-25 Category:Environmental Assessment MONTHYEARML12065A3802012-03-26026 March 2012
[Table view]Request to Reinitiate Section 7 Consultation for Atlantic Sturgeon at Brunswick Steam Electric Plant, Units 1 and 2 ML11105A1172011-05-0909 May 2011 Federal Register Notice - Environmental Assessment ML11105A1062011-05-0909 May 2011 Transmittal Letter - Environmental Assessment and Finding of No Significant Impact. ML0522006342005-08-31031 August 2005 Enclosure - Biological Assessment for Species Under the Jurisdiction of Fish and Wildlife Service ML0504006102005-02-28028 February 2005 Environmental Assessment, Issuance of Exemption to 10 CFR Part 50, Appendix J ML0213506512002-05-14014 May 2002 Environmental Assessment and Finding of No Significant Impact, an Increase in the Maximum Power Level from 2558 Mwt to 2923 Mwt ML0208805092002-03-29029 March 2002 Draft Environmental Assessment and Finding of No Significant Impact (TAC Nos. MB2700 and MB2701) ML0203505091993-08-18018 August 1993 Federal Register Notice, Environmental Assessment, Replacement of Steam Leak Detection Equipment with GE Numac Equipment 2012-03-26 Category:Report MONTHYEARRA-22-0165, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 242022-06-0909 June 2022
[Table view]Inservice Inspection Program Owner'S Activity Report for Refueling Outage 24 RA-22-0134, Unit 1 Cycle 23 Mellla+ Eigenvalue Tracking Data2022-05-25025 May 2022 Unit 1 Cycle 23 Mellla+ Eigenvalue Tracking Data RA-21-0198, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 252021-06-21021 June 2021 Inservice Inspection Program Owner'S Activity Report for Refueling Outage 25 RA-21-0176, Cycle 24 Mellla+ Eigenvalue Tracking Data2021-06-0707 June 2021 Cycle 24 Mellla+ Eigenvalue Tracking Data RA-20-0353, Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Service Water (SW) System Buried Piping in Accordance with 10 CFR 50.55a(z)(1)2021-02-24024 February 2021 Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Service Water (SW) System Buried Piping in Accordance with 10 CFR 50.55a(z)(1) RA-20-0347, 10 CFR 71.95 Report on the 3-60B Cask2020-11-16016 November 2020 10 CFR 71.95 Report on the 3-60B Cask RA-19-0479, Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies2019-12-31031 December 2019 Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies RA-19-0411, Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies2019-10-23023 October 2019 Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies RA-19-0338, Pressure and Temperature Limits Report for Unit Nos. 1 and 22019-08-15015 August 2019 Pressure and Temperature Limits Report for Unit Nos. 1 and 2 RA-19-0243, Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies2019-07-0202 July 2019 Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies RA-19-0223, Annual Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models Pursuant to 10CFR 50.462019-05-30030 May 2019 Annual Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models Pursuant to 10CFR 50.46 RA-19-0240, Response to Request for Additional Information Regarding Advanced Framatome Methodologies License Amendment Request2019-05-29029 May 2019 Response to Request for Additional Information Regarding Advanced Framatome Methodologies License Amendment Request RA-19-0139, Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies2019-03-18018 March 2019 Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies RA-18-0100, Request for License Amendment Regarding Application of Advanced Framatome Methodologies2018-10-11011 October 2018 Request for License Amendment Regarding Application of Advanced Framatome Methodologies RA-18-0131, Technical Requirements Manual, Revision 662018-08-13013 August 2018 Technical Requirements Manual, Revision 66 ML18249A1592018-08-13013 August 2018 Technical Requirements Manual, Revision 73 RA-18-0024, Supplemental Information to Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report2018-05-29029 May 2018 Supplemental Information to Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report BSEP 18-0044, Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D2018-04-11011 April 2018 Application of Dissimilar Metal Weld Full Structural Overlay - Reactor Pressure Vessel Nozzles N4A and N4D ML17024A0362016-12-31031 December 2016 Operating Data Report for 2016 ML16287A4222016-09-26026 September 2016 FS1-0028339 Revision 1.0, Brunswick, Unit 1, Cycle 21 and Unit 2 Cycle 23 MELLLA SLMCPR Analyses with SAFLIM30 Methodology. ML16223A7252016-08-17017 August 2016 Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Phase 2 of Order EA-13-109 (Severe Accident Capable Hardened Events) CAC Nos. MF4467 and MF4468) ML18250A0022016-08-11011 August 2016 Technical Requirements Manual, Revision 70 ML18250A0032016-08-11011 August 2016 Technical Requirements Manual, Revision 63 ML16257A4112016-07-31031 July 2016 DUKE-0B21-1104-000(NP), Safety Analysis Report for Brunswick Steam Electric Plant, Units 1 and 2, Maximum Extended Load Line Limit Analysis Plus. ML16041A4352016-03-0101 March 2016 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50 Section 50.54(f) Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force ML16257A4062015-12-31031 December 2015 ANP-3106(NP), Revision 2, Brunswick Units 1 and 2 LOCA-ECCS Analysis MAPLHGR Limit for Atrium 10XM Fuel for Mellla+ Operation. ML15275A2902015-09-30030 September 2015 Areva, Inc., - ANP-3397NP, Revision 0, Brunswick, Unit 2, Atrium 11 Lead Test Assemblies Design & Licensing Summary Report. BSEP 16-0056, ANP-3108(NP), Revision 1, Applicability of Areva BWR Methods to Brunswick Extended Power Flow Operating Domain.2015-07-31031 July 2015 ANP-3108(NP), Revision 1, Applicability of Areva BWR Methods to Brunswick Extended Power Flow Operating Domain. ML16257A4082015-07-31031 July 2015 ANP-3105(NP), Revision 1, Brunswick Units 1 and 2 LOCA Break Spectrum Analysis for Atrium 10XM Fuel for Mellla+ Operation. BSEP 15-0004, Enclosure 3 - Areva Operability Assessment. (CR 2014-7395)2015-01-13013 January 2015 Enclosure 3 - Areva Operability Assessment. (CR #2014-7395) BSEP 14-0131, Expedited Seismic Evaluation Process Report in Response to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident2014-12-18018 December 2014 Expedited Seismic Evaluation Process Report in Response to 10 CFR 50.54(f) Request for Information Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-lchi Accident ML14297A2662014-10-24024 October 2014 Record of Review, Brunswick Steam Electric Plant, Units 1 and 2, LAR Attachment U- Table U-1 Internal Events PRA Peer Review- Facts and Observations (F&Os), 10/24/14 BSEP 14-0101, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors2014-09-0404 September 2014 Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors BSEP 14-0093, Report of 10 CFR 50.59 Evaluations and Commitment Changes2014-08-14014 August 2014 Report of 10 CFR 50.59 Evaluations and Commitment Changes ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 BSEP 14-0028, Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi A2014-03-31031 March 2014 Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accid ML13220A0902013-11-22022 November 2013 Interim Staff Evaluation Regarding Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies ML13317A5922013-11-20020 November 2013 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Brunswick Steam Electric Plant, Units 1 and 2, TAC Nos.: MF0975 and MF0976 ML13277A0412013-09-19019 September 2013 Transition to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition ML16257A4072013-05-31031 May 2013 ANP-3013(NP), Revision 0, Brunswick Unit 1 Cycle 19 Fuel Cycle Design Mellla+ Operating Domain. BSEP 13-0030, Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2013-02-28028 February 2013 Overall Integrated Plan in Response to March 12, 2012, Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events BSEP 13-0002, Technical Data Record, 12-9197120-000, Brunswick SAFLIM3D LAR Support - Calculation Error Impact2013-01-14014 January 2013 Technical Data Record, 12-9197120-000, Brunswick SAFLIM3D LAR Support - Calculation Error Impact ML13031A0112013-01-11011 January 2013 Engineering Information Record, Document No. 51-9196989-000, Supplemental Information for Brunswick SAFLIM3D Submittal: Impact of Assemblies Outside Existing Channel Bow Fast Fluence Gradient Database BSEP 12-0133, Document No. 51-9195058-000, Areva Input to Process Energy: Follow-Up to SAFLIM3D LAR Request for Additional Information 3, Enclosure 3 to BSEP 12-01332012-11-27027 November 2012 Document No. 51-9195058-000, Areva Input to Process Energy: Follow-Up to SAFLIM3D LAR Request for Additional Information 3, Enclosure 3 to BSEP 12-0133 BSEP 12-0127, Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident2012-11-27027 November 2012 Recommendation 2.3 Seismic Walkdown of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident BSEP 12-0128, Special Report - Technical Requirements Manual Section 3.4, Accident Monitoring Instrumentation2012-11-14014 November 2012 Special Report - Technical Requirements Manual Section 3.4, Accident Monitoring Instrumentation ML12321A3192012-11-0101 November 2012 1000771.402NP, Revision 2, Life Extension for Core Plate Plugs at Brunswick Nuclear Plant Unit 2. ML12065A3802012-03-26026 March 2012 Request to Reinitiate Section 7 Consultation for Atlantic Sturgeon at Brunswick Steam Electric Plant, Units 1 and 2 BSEP 12-0031, Areva Document ANP-3086(NP), Brunswick Units 1 and 2 SLMCPR Operability Assessment Critical Power Correlation for Atrium 10XM Fuel - Improved K-factor Model, Enclosure 20 to BSEP 12-00312012-02-29029 February 2012 Areva Document ANP-3086(NP), Brunswick Units 1 and 2 SLMCPR Operability Assessment Critical Power Correlation for Atrium 10XM Fuel - Improved K-factor Model, Enclosure 20 to BSEP 12-0031 ML12076A0632012-02-17017 February 2012 Areva Document No. 51-9177317-000, Brunswick Unit 1 Cycle 19 SLMCPR Analysis with SAFLIM3D Methodology, Engineering Information Record, Enclosure 8 to BSEP 12-0031 2022-06-09 Category:Technical MONTHYEARRA-22-0134, Unit 1 Cycle 23 Mellla+ Eigenvalue Tracking Data2022-05-25025 May 2022
[Table view]Unit 1 Cycle 23 Mellla+ Eigenvalue Tracking Data RA-21-0176, Cycle 24 Mellla+ Eigenvalue Tracking Data2021-06-0707 June 2021 Cycle 24 Mellla+ Eigenvalue Tracking Data RA-20-0347, 10 CFR 71.95 Report on the 3-60B Cask2020-11-16016 November 2020 10 CFR 71.95 Report on the 3-60B Cask RA-19-0411, Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies2019-10-23023 October 2019 Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies RA-19-0338, Pressure and Temperature Limits Report for Unit Nos. 1 and 22019-08-15015 August 2019 Pressure and Temperature Limits Report for Unit Nos. 1 and 2 RA-19-0243, Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies2019-07-0202 July 2019 Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies RA-19-0240, Response to Request for Additional Information Regarding Advanced Framatome Methodologies License Amendment Request2019-05-29029 May 2019 Response to Request for Additional Information Regarding Advanced Framatome Methodologies License Amendment Request RA-19-0139, Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies2019-03-18018 March 2019 Supplement to Request for License Amendment Regarding Application of Advanced Framatome Methodologies RA-18-0100, Request for License Amendment Regarding Application of Advanced Framatome Methodologies2018-10-11011 October 2018 Request for License Amendment Regarding Application of Advanced Framatome Methodologies RA-18-0131, Technical Requirements Manual, Revision 662018-08-13013 August 2018 Technical Requirements Manual, Revision 66 ML18249A1592018-08-13013 August 2018 Technical Requirements Manual, Revision 73 RA-18-0024, Supplemental Information to Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report2018-05-29029 May 2018 Supplemental Information to Request for License Amendment to Revise the Technical Specifications to Relocate the Pressure-Temperature Limit Curves to a Pressure and Temperature Limits Report ML16287A4222016-09-26026 September 2016 FS1-0028339 Revision 1.0, Brunswick, Unit 1, Cycle 21 and Unit 2 Cycle 23 MELLLA SLMCPR Analyses with SAFLIM30 Methodology. ML18250A0032016-08-11011 August 2016 Technical Requirements Manual, Revision 63 ML18250A0022016-08-11011 August 2016 Technical Requirements Manual, Revision 70 ML16257A4112016-07-31031 July 2016 DUKE-0B21-1104-000(NP), Safety Analysis Report for Brunswick Steam Electric Plant, Units 1 and 2, Maximum Extended Load Line Limit Analysis Plus. ML16257A4062015-12-31031 December 2015 ANP-3106(NP), Revision 2, Brunswick Units 1 and 2 LOCA-ECCS Analysis MAPLHGR Limit for Atrium 10XM Fuel for Mellla+ Operation. ML15275A2902015-09-30030 September 2015 Areva, Inc., - ANP-3397NP, Revision 0, Brunswick, Unit 2, Atrium 11 Lead Test Assemblies Design & Licensing Summary Report. BSEP 16-0056, ANP-3108(NP), Revision 1, Applicability of Areva BWR Methods to Brunswick Extended Power Flow Operating Domain.2015-07-31031 July 2015 ANP-3108(NP), Revision 1, Applicability of Areva BWR Methods to Brunswick Extended Power Flow Operating Domain. ML16257A4082015-07-31031 July 2015 ANP-3105(NP), Revision 1, Brunswick Units 1 and 2 LOCA Break Spectrum Analysis for Atrium 10XM Fuel for Mellla+ Operation. ML14176A9612014-06-24024 June 2014 Submittal of Non-Proprietary BWROG Technical Product, BWROGTP-11-006 - ECCS Containment Walkdown Procedure, Rev 1 (January 2011), as Formally Requested During the Public Meeting Held on April 30, 2014 BSEP 14-0028, Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi A2014-03-31031 March 2014 Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accid ML13220A0902013-11-22022 November 2013 Interim Staff Evaluation Regarding Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies ML13317A5922013-11-20020 November 2013 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Brunswick Steam Electric Plant, Units 1 and 2, TAC Nos.: MF0975 and MF0976 ML16257A4072013-05-31031 May 2013 ANP-3013(NP), Revision 0, Brunswick Unit 1 Cycle 19 Fuel Cycle Design Mellla+ Operating Domain. BSEP 13-0002, Technical Data Record, 12-9197120-000, Brunswick SAFLIM3D LAR Support - Calculation Error Impact2013-01-14014 January 2013 Technical Data Record, 12-9197120-000, Brunswick SAFLIM3D LAR Support - Calculation Error Impact ML13031A0112013-01-11011 January 2013 Engineering Information Record, Document No. 51-9196989-000, Supplemental Information for Brunswick SAFLIM3D Submittal: Impact of Assemblies Outside Existing Channel Bow Fast Fluence Gradient Database BSEP 12-0133, Document No. 51-9195058-000, Areva Input to Process Energy: Follow-Up to SAFLIM3D LAR Request for Additional Information 3, Enclosure 3 to BSEP 12-01332012-11-27027 November 2012 Document No. 51-9195058-000, Areva Input to Process Energy: Follow-Up to SAFLIM3D LAR Request for Additional Information 3, Enclosure 3 to BSEP 12-0133 ML12321A3192012-11-0101 November 2012 1000771.402NP, Revision 2, Life Extension for Core Plate Plugs at Brunswick Nuclear Plant Unit 2. ML12065A3802012-03-26026 March 2012 Request to Reinitiate Section 7 Consultation for Atlantic Sturgeon at Brunswick Steam Electric Plant, Units 1 and 2 BSEP 12-0031, Areva Document ANP-3086(NP), Brunswick Units 1 and 2 SLMCPR Operability Assessment Critical Power Correlation for Atrium 10XM Fuel - Improved K-factor Model, Enclosure 20 to BSEP 12-00312012-02-29029 February 2012 Areva Document ANP-3086(NP), Brunswick Units 1 and 2 SLMCPR Operability Assessment Critical Power Correlation for Atrium 10XM Fuel - Improved K-factor Model, Enclosure 20 to BSEP 12-0031 ML12076A0632012-02-17017 February 2012 Areva Document No. 51-9177317-000, Brunswick Unit 1 Cycle 19 SLMCPR Analysis with SAFLIM3D Methodology, Engineering Information Record, Enclosure 8 to BSEP 12-0031 ML12076A0642012-02-17017 February 2012 Areva Document No. 51-9177315-000, Brunswick Unit 1 Cycle 19 SLMCPR Analysis with SAFLIM3D Methodology - Operability Assessment, Enclosure 11 to BSEP 12-0031 ML12076A0852012-02-17017 February 2012 Areva Document No. 51-9177314-000, Brunswick Unit 2 Cycle 20 SLMCPR Analysis with SAFLIM3D Methodology, Enclosure 14 to BSEP 12-0031 ML12076A0862012-02-17017 February 2012 Areva Document No. 51-9177316-000, Brunswick Unit 2 Cycle 20 SLMCPR Analysis with SAFLIM3D Methodology - Operability Assessment, Enclosure 17 to BSEP 12-0031 BSEP 12-0040, ANP-3061(NP), Revision 0, Brunswick, Unit 1, Cycle 19 Reload Safety Analysis.2011-12-31031 December 2011 ANP-3061(NP), Revision 0, Brunswick, Unit 1, Cycle 19 Reload Safety Analysis. ML12100A0872011-05-31031 May 2011 ANP-2989(NP), Revision 0, Brunswick, Unit 1, Thermal-Hydraulic Design Report for Atrium 10XM Fuel Assemblies. BSEP 11-0031, Areva Report ANP-2992NP, Revision 0, Areva Response to Additional RAI on the Brunswick RODEX4 LAR2011-03-31031 March 2011 Areva Report ANP-2992NP, Revision 0, Areva Response to Additional RAI on the Brunswick RODEX4 LAR ML1111010202011-03-24024 March 2011 Reactor Pressure Vessel Flaw Evaluation BSEP 10-0141, ANP-2978NP, Rev. 0, Areva Responses to RAIs on the Atrium 10XM Compliance Audit and Brunswick Lars.2010-12-16016 December 2010 ANP-2978NP, Rev. 0, Areva Responses to RAIs on the Atrium 10XM Compliance Audit and Brunswick Lars. BSEP 10-0118, ANP-2950NP, Revision 0, Atrium 10XM Fuel Rod Thermal and Mechanical Evaluation for Brunswick Unit 2 Cycle 20 Reload BRK2-20.2010-10-12012 October 2010 ANP-2950NP, Revision 0, Atrium 10XM Fuel Rod Thermal and Mechanical Evaluation for Brunswick Unit 2 Cycle 20 Reload BRK2-20. ML1019305492010-01-20020 January 2010 Impact of Tritium Leak on Public BSEP 09-0034, Enclosure 10 to BSEP 09-0034 - ANP-2771(NP), Rev. 0, Brunswick, Unit 2 Cycle 19 Reload Safety Analysis, Dated January 20092009-01-31031 January 2009 Enclosure 10 to BSEP 09-0034 - ANP-2771(NP), Rev. 0, Brunswick, Unit 2 Cycle 19 Reload Safety Analysis, Dated January 2009 ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 ML0909702482008-07-31031 July 2008 Enclosure 4 and 6 to BSEP 09-0034 - ANP-2729(NP), Rev. 0, Brunswick, Unit 2, Thermal-Hydraulic Design Report for ATRIUM-10 Fuel Assemblies, and Areva Affidavit Withholding ANP-2727(P), Rev. 0 Form Public Disclosure ML0909702462008-06-30030 June 2008 Enclosure 7 and 9 to BSEP 09-0034 - ANP-2727(NP), Rev. 0, Brunswick, Unit 2, Cycle 19 Fuel Cycle Design, and Areva Affidavit Re Withholding ANP-2771(P), Rev. 0 from Public Disclosure BSEP 07-0102, ANP-2661 (Np), Revision 0, Brunswick Nuclear Plant New Fuel Storage Vault Criticality Safety Analysis for ATRIUM-10 Fuel.2007-09-30030 September 2007 ANP-2661 (Np), Revision 0, Brunswick Nuclear Plant New Fuel Storage Vault Criticality Safety Analysis for ATRIUM-10 Fuel. ML0728402192007-09-30030 September 2007 ANP-2642(NP), Revision 0, Brunswick Nuclear Plant Spent Fuel Storage Pool Criticality Safety Analysis for ATRIUM-10 Fuel. ML0721803722007-07-31031 July 2007 Areva Report ANP-2658(NP), Revision 0, Brunswick Unit 1 Cycle 17 Fuel Cycle Design, Enclosure 3 BSEP 07-0075, Areva Report ANP-2638NP, Revision 0, Applicability of Areva Np BWR Methods to Extended Power Uprate Conditions, Enclosure 62007-07-31031 July 2007 Areva Report ANP-2638NP, Revision 0, Applicability of Areva Np BWR Methods to Extended Power Uprate Conditions, Enclosure 6 2022-05-25 |