MONTHYEARML20211H4311999-08-27027 August 1999 Revised Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints ML20211D9201999-08-20020 August 1999 Revised Pages to Third Ten Year ISI Program & Relief Requests ML20210L1631999-08-0404 August 1999 Proposed Tech Specs,Ack Establishment of Seal Injection for RCP in Isolated & Drained Loop as Prerequisite for vacuum-assisted Backfill Technique & Extending Drained Loop Verification to 4 H Prior to Commencing Backfill Operation ML20212J3041999-06-22022 June 1999 Proposed Tech Specs Re Revised Surveillance Frequency & Action Times Reactor Trip & ESFAS ML20195B5881999-05-14014 May 1999 Rev 8,Change 2 to Vepc North Anna Unit 2 IST Program Plan for Pumps & Valves Second Insp Interval,901214-001214 ML20195B5691999-05-14014 May 1999 Rev 8,Change 2 to Vepc North Anna,Unit 1 IST Program Plan for Pumps & Valves Second Insp Interval 901214-001214 ML20206N3691999-05-0606 May 1999 Proposed Tech Specs,Revising Surveillance Frequency for RTS & ESFAS Analog Instrumentation Channels & Modifying AOT & Action Times for RTS & ESFAS Analog Instrumentation Channels & Actuation Logic ML20206G8361999-05-0303 May 1999 Proposed Tech Specs,Deleting &/Or Relocating Addl primary- to-secondary Leak Rate Limits & Enhanced Leakage Monitoring Requirements Imposed Following 1987 SG Tube Rupture Event ML20206H0301999-05-0303 May 1999 Proposed Tech Specs Bases Page B 3/4 6-1,allowing Use of NRC Staff Approved/Endorsed Integrated Leak Test Methodologies to Perform Containment Leakage Rate Testing ML20206G8811999-05-0303 May 1999 Proposed Tech Specs,Increasing Allowable Leakage from ECCS Components,Establishing Consistent Licensing Basis for Accidents Requiring Dose Analysis & Clarifying Requirements of CREVS ML20205P2511999-05-0101 May 1999 Rev 0 to Vepc North Anna Power Station Unit 1 ISI Program Plan for Third Insp Interval:Components & Component Supports ML20205P2341999-05-0101 May 1999 Rev 0 to Vepc North Anna Unit 1 ISI Program for Third Insp Interval Vol 1:ISI Program for Components & Component Supports for Interval 3 990501-090430 ML20203C8251999-02-0505 February 1999 Proposed Tech Specs Re Allowed Outage Time for PORV Nitrogen Accumulators & Separate Actions for PORV Operability ML20205P2651999-02-0404 February 1999 Rev 0 to Vepc North Anna Power Station Unit 1 ISI Plan for Third Interval for Sys Pressure Tests ML20198J0971998-12-22022 December 1998 Proposed Tech Specs Bases Changes Re EDG Steady State Frequency to Be Incorporated Into TS During Implementation of Amends 216 & 197 ML20196K1971998-12-22022 December 1998 Rev 0 to NE-1176, North Anna Unit 1,Cycle 14 Startup Physics Tests Rept, Dec 1998 ML20206N8851998-12-14014 December 1998 Rev 0 to ASME Section XI Sys Pressure Test Program,Second Insp Interval ML20206N8711998-11-30030 November 1998 Rev 11,Vol I to ISI Plan for Second Insp Interval for Components & Component Supports ML20195J4431998-11-18018 November 1998 Proposed Tech Specs Re Revs to Allowable Groundwater Elevations & Removal of Piezometer Device Numbers Associated with Svc Water Reservoir ML20195C9461998-11-10010 November 1998 Proposed Tech Specs,Clarifying Operability Requirements for Pressurizer Heaters & Emergency Power Source for Pressurizer Heaters ML20154P2831998-10-16016 October 1998 Marked-up & Typed Tech Spec Pages to Revise EDG Section to Be Consistent with Station Procedures Associated with Steady State Conditions & W NSAL 93-022,for 980728 Application for Amends to Licenses NPF-4 & NPF-7 ML20153H5341998-09-24024 September 1998 Proposed Tech Specs 3/4.5.1 Re Safety Injection Accumulator Boron Concentration Verification ML20236U8411998-07-28028 July 1998 Proposed Tech Specs 4.6.2.2.1 & 4.6.2.2.2,revising Testing Acceptance Criteria to Demonstrate Operability of Casing Cooling & Outside Recirculation Spray Pumps ML20236U8711998-07-28028 July 1998 Proposed Tech Specs,Revising EDG Section to Be Consistent W/ Station Procedures Associated W/Steady State Conditions & W Nuclear Safety Advisory Ltr NSAL 93-022 ML20236U8651998-07-28028 July 1998 Proposed Tech Specs 3/4.1.2 & 3/4.5.5,re RWST & Boron Concentration Ph Range Bases Change to Address Discrepancies Between Previous NRC Issued Ser,Ts Bases & Applicable Sections of SRP ML20236H5311998-07-0101 July 1998 Draft Nuclear Control Room Operator Development Program NAPS Module NCRODP-78 Spent Fuel Dry Storage Cask System. Draft Lesson Plans & Job Performance Measures Included ML20236U8891998-06-25025 June 1998 Rev 0 to NE-1163, North Anna Unit 2 Cycle 13 Startup Physics Tests Rept ML20249C7211998-06-19019 June 1998 Proposed Improved Tech Specs for North Anna ISFSI ML20236H5541998-06-0404 June 1998 Rev 5 to Procedure VPAP-0810, Crane & Hoist Program ML20236H5391998-06-0404 June 1998 Rev 1 to Procedure VPAP-0809, NUREG-0612 Heavy Load Program ML20206N8581998-04-30030 April 1998 Rev 5,Vol 1 to ISI Program for Second Insp Interval & Components & Component Supports,For 901214-010430 ML20236H5701998-04-0202 April 1998 Rev 8 to Procedure VPAP-1901, Industrial Safety & Health ML18152A3651998-03-25025 March 1998 Proposed Tech Specs Revising Station Mgt Titles to Reflect New Positions Approved by Vepc Board of Directors on 980220 ML20217E9011998-03-25025 March 1998 Proposed Tech Specs Re Configuration Risk Mgt Program for risk-informed Allowed Outage Times & Insp Frequency of EDGs ML20236H5631998-02-10010 February 1998 Rev 11 to Procedure VPAP-0105, Fitness for Duty Program ML20202E1551998-02-0909 February 1998 Proposed Tech Specs Re EDG Allowed Outage Time ML20202C5871998-02-0303 February 1998 Proposed Tech Specs Re Reactor Coolant Pump Flywheel Insps & Loop Flow Straightener Insps ML20202C3381998-02-0303 February 1998 Proposed Tech Specs Modifying Testing Requirements for Reactor Trip Bypass Breaker ML20210Q2051997-12-31031 December 1997 1997 Severe Accident Management Tabletop (Scenario 1) Drill Manual ML20203G5191997-12-29029 December 1997 Ultrasonic Exam Technique for Detection of Microbilogically Induced Corrosion in North Anna Stainless Steel Service Water Piping ML20199G4161997-11-18018 November 1997 Revised Proposed TS Pages,Establishing 14 Day AOT Applicable Whenever EDG Is Inoperable ML20199H4001997-11-18018 November 1997 Proposed Tech Specs Permitting Quarterly Testing of Turbine Governor & Throttle Valves ML20199A1481997-11-0505 November 1997 Proposed Tech Specs Pages,Providing Administrative Controls in TS 3/4.9.7,to Permit Spent Fuel Pit Gate Movement Over Irradiated Fuel ML20198G5401997-08-31031 August 1997 Rev 0 to NE-1133, North Anna Unit 1,Cycle 13 Startup Physics Tests Rept, Aug 1997 ML20199G5681997-06-30030 June 1997 Rev 5 to VPAP-2001, Station Planning & Scheduling. Even Numbered Pages of Incoming Submittal Not Included ML20210Q1991997-06-10010 June 1997 Rev 0 to VPAP-2604, Severe Accident Mgt Guideline (SAMG) Program Administration ML20141F3741997-05-14014 May 1997 Proposed Tech Specs Revising Wording in Surveillance Requirement 4.7.1.7.2.a to Clarify Testing & Insp Methodology of Turbine Governor Control Valves.Clarification Also Provided for TS 3/4.7.1.7 ML20137C8581997-03-18018 March 1997 Proposed Tech Specs Re Containment Gaseous & Particulate Radiation Monitors ML20134J4141997-02-0404 February 1997 Revised Pp of Proposed TS Changes Re Intermediate Range Trip Setpoints & Allowable Values for Units 1 & 2 ML20134F1231997-02-0303 February 1997 Proposed Tech Specs Re Use of Lead Test Assemblies in Plant,Units 1 & 2 1999-08-04
[Table view] Category:TEST/INSPECTION/OPERATING PROCEDURES
MONTHYEARML20211D9201999-08-20020 August 1999 Revised Pages to Third Ten Year ISI Program & Relief Requests ML20195B5881999-05-14014 May 1999 Rev 8,Change 2 to Vepc North Anna Unit 2 IST Program Plan for Pumps & Valves Second Insp Interval,901214-001214 ML20195B5691999-05-14014 May 1999 Rev 8,Change 2 to Vepc North Anna,Unit 1 IST Program Plan for Pumps & Valves Second Insp Interval 901214-001214 ML20205P2511999-05-0101 May 1999 Rev 0 to Vepc North Anna Power Station Unit 1 ISI Program Plan for Third Insp Interval:Components & Component Supports ML20205P2341999-05-0101 May 1999 Rev 0 to Vepc North Anna Unit 1 ISI Program for Third Insp Interval Vol 1:ISI Program for Components & Component Supports for Interval 3 990501-090430 ML20205P2651999-02-0404 February 1999 Rev 0 to Vepc North Anna Power Station Unit 1 ISI Plan for Third Interval for Sys Pressure Tests ML20206N8851998-12-14014 December 1998 Rev 0 to ASME Section XI Sys Pressure Test Program,Second Insp Interval ML20206N8711998-11-30030 November 1998 Rev 11,Vol I to ISI Plan for Second Insp Interval for Components & Component Supports ML20236H5311998-07-0101 July 1998 Draft Nuclear Control Room Operator Development Program NAPS Module NCRODP-78 Spent Fuel Dry Storage Cask System. Draft Lesson Plans & Job Performance Measures Included ML20236H5391998-06-0404 June 1998 Rev 1 to Procedure VPAP-0809, NUREG-0612 Heavy Load Program ML20236H5541998-06-0404 June 1998 Rev 5 to Procedure VPAP-0810, Crane & Hoist Program ML20206N8581998-04-30030 April 1998 Rev 5,Vol 1 to ISI Program for Second Insp Interval & Components & Component Supports,For 901214-010430 ML20236H5701998-04-0202 April 1998 Rev 8 to Procedure VPAP-1901, Industrial Safety & Health ML20236H5631998-02-10010 February 1998 Rev 11 to Procedure VPAP-0105, Fitness for Duty Program ML20210Q2051997-12-31031 December 1997 1997 Severe Accident Management Tabletop (Scenario 1) Drill Manual ML20199G5681997-06-30030 June 1997 Rev 5 to VPAP-2001, Station Planning & Scheduling. Even Numbered Pages of Incoming Submittal Not Included ML20210Q1991997-06-10010 June 1997 Rev 0 to VPAP-2604, Severe Accident Mgt Guideline (SAMG) Program Administration ML20199G4461996-08-29029 August 1996 Rev 28 to 1-MOP-6.90, Emergency Diesel Generator 1-EE-EG-1H. Page 35 of 72 in Attachment 4 of Incoming Submittal Was Not Included ML20236H5561996-08-0202 August 1996 Rev 3 to Procedure TRCP-0009, Instructional Staff Training & Qualifications ML20134J9601996-05-31031 May 1996 /Unit 2 Fuel Assembly Insp Program ML20138B5421996-05-16016 May 1996 Rev 7 to VPAP-2103, Odcm ML20217K4481995-10-31031 October 1995 Seismic Design & Evaluation Guidelines for DOE HLW Storage Tanks & Appurtenances ML20084U1811995-04-30030 April 1995 Rev 5 to Second 10-yr Interval ISI Program Plan ML20069A7971994-03-29029 March 1994 Second Interval ISI Plan, Rev 5 ISI Program,Rev 3 ML20065H9221993-11-30030 November 1993 ISI Program General Second Insp Interval ML20058N4911993-11-0505 November 1993 Rev 7 to North Anna Units 1 & 2 IST Program Plan Second Insp Interval 901214-001214 ML20092M9061991-09-0101 September 1991 Rev 2 to VPAP-2103, Odcm ML20081F3501991-05-28028 May 1991 Rev 1 to North Anna Unit 1 Inservice Insp Plan for Components & Component Supports,Second Insp Interval ML20082K8211991-05-0303 May 1991 Rev 1 to Station Administrative Procedure VPAP-2104, Radwaste Process Control Program ML18151A6551990-11-14014 November 1990 Revised Corporate Emergency Plan Implementing Procedures, Including Rev 0 to CPIP-1.0,CPIP-2.0,CPIP-2.1,CPIP-2.2, CPIP-2.3,CPIP-2.4,CPIP-2.5,CPIP-2.6,CPIP-3.0,CPIP-3.1 & CPIP-3.2 ML20058C1151990-10-17017 October 1990 Inservice Testing Program Plan for North Anna Unit 1 ML20065P2741990-09-30030 September 1990 Rev 1 to Vol 1 of VEPCO North Anna Power Station Unit 2 Inservice Insp Plan for Second Insp Interval:For Components & Component Supports 901214-001214 ML20065P2711990-09-30030 September 1990 Vol 1,Rev 0 to VEPCO North Anna Power Station Unit 1 Inservice Insp Plan for Second Insp Interval:For Components & Component Supports Dec 1988 - Dec 1998 ML20058G0551990-08-31031 August 1990 Inservice Insp Program for Second Insp Interval,Vol 1,Inservice Insp Program for Components & Component Supports ML20055D4931990-06-14014 June 1990 Rev 6 to VEPCO North Anna Power Station Unit 1 Inservice Testing Program Plan for Pumps & Valves Second Insp Interval 901214-001214 ML20055D4941990-06-14014 June 1990 Rev 6 to VEPCO North Anna Power Station Unit 2 Inservice Testing Program Plan for Pumps & Valves Second Insp Interval 901214-001214 ML20043B1091990-04-27027 April 1990 Rev 0 to Station Administrative Procedure VPAP-2103, Odcm. ML20043B1111990-04-27027 April 1990 Rev 0 to Station Administrative Procedure VPAP-2104, Radwaste Process Control Program. ML20248E9231989-10-0303 October 1989 Inservice Testing Program Plan for Pumps & Valves First Insp Interval 801214 - 901214, Rev 5 ML20248E9201989-10-0303 October 1989 Inservice Testing Program Plan for Pumps & Valves First Insp Interval 780606 - 901214, Rev 5 ML20197F1261988-03-31031 March 1988 Rev 0 to Inservice Insp Program Plan for Second Insp Interval,Vol 1,Inservice Insp Program Plan for Components & Component Supports,880606-980606. W/92 Oversize Drawings ML20235U3391987-06-12012 June 1987 Revised Emergency Plan Implementing Procedures,Including Rev 1.00 to 1-ES-3.1, Post-STGR Cooldown Using Backfill (W/No Attachments) & Rev 1.00 to 1-EP-0, Reactor Trip or Safety Injection (W/No Attachments). Related Info Encl ML20215K2681985-12-19019 December 1985 Offsite Dose Calculation Manual,North Anna Power Station Units 1 & 2 ML20215K2731985-11-27027 November 1985 Process Control Program,North Anna Power Station Units 1 & 2 ML20108A1041985-03-0404 March 1985 Proposed Methodology for Implementing Mechanical Cleaning of Svc Water Piping & Repair of Svc Water Isolation Valves ML20108B5801985-02-28028 February 1985 VEPCO Proposed Program,Mechanical Cleaning & Valve Repair Svc Water Sys,North Anna Power Station,Feb 1985. W/One Oversize Drawing.Aperture Card Available in PDR ML20112G3771984-11-15015 November 1984 Emergency Exercise 841115,Exercise Manual ML18141A5301984-03-0101 March 1984 Control Room Design Review Program Plan for North Anna & Surry Power Stations, in Response to Suppl 1 to NUREG-0737 ML20079L5361983-12-21021 December 1983 Public Version of Rev 5 to Emergency Plan Implementing Procedure EPIP-3.04, Activation of Emergency Operation Facility ML18142A1371983-09-15015 September 1983 Procedure 1-OP-4.19, Receipt & Storage of Spent Fuel TN-8L Shipping Cask,Unloading & Handling Procedures. 1999-08-20
[Table view] |
Text
-
l b.i7ss7oo C
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURE NUMBER PROCEDURE TITLE REVISION 05 EPIP-3.04 ACTIVATION OF EMERGENCY OPERATIONS FACILITY pAGE (With 4 Attachments) 1 of 6 PURPOSE 1.
To provide guidance to personnel performing initial activation of EOF.
USER Two (2) Security Team members ENTRYCONDITIONS 1.
Declaration of an Alert. Site Emergency or General Emergency; AND 2.
Direction of the Station Emergency Manager through the on-duty Security Shift Supervisor.
SAttTf RELATED REVISION RECORD REV. 00 PAGE(S): Entire Procedure DATE: 07-02-82 REY. 01 PAGE(S): Entire Procedure DATE: 07-22-82 REY. 02 PAGE(S): Entire Procedure IATE: 09-01-82 REV. 03 PAGE(S): Entire Procedure DATE: 03-09-83 REV. 04 PAGE(S): Entire Procedure DATE: 05-24-83 REV. 05 PAGE(S): Entire Procedure DATE: 12-21-83 REY.
PAGE(S):
DATE:
APPROVAL RECOMMENCEO APPROV OA Tk f-12-21-83 CHAIRMAN STA T N NUCLEAR SAFE AND OPERATING COMMITTEE G401260205 840120 PDR ADOCK 05000338 g
Y O OS-F PDR
.,,.. m..
NUNCER PROCT 00RE TITLE REVISION 05 EPIP-3.04 ACTIVATION OF EMERGENCY OPERATIONS FACILITY PAGE (WITH 4 ATTACHMENTS) 3 of 6 STEP ACTION / EXPECTED RESPONSE RESPONSENOTODTAINED
- 3. Remove the Terminal and Printer from the roll-around stand and place on the permanent stand already located in the RAC Area.
- 4. Reconnect the TSO System.
NOTE: Maps, manuals, badges, plug-in phone and other emergency i
supplies are sected in the SRAC office file cabinet.
1
~.
4.
. COMMUNICATIONS:.
a) Remove phone for security use from emergency supply cabinet in SRAC office and place on wall at entrance to simulator hallway.
b) Refer to Attachment 3 for Energency Facility Phone Numbers.
5..
SECURITY:
a) Maintain physical control of EOF and Training Bldg.
until relieved by VEPCO Corporate Security per-sonnel and allow entry to:
- 1) VEPCO EOF Team Members who possess a VEPCO ID with the initials " CERT" affixed to the back, or who are listed in the CERP Manual
- 2) VEPCO employee with Valid ID and approved for access by
.the Recovery Manager or his designee
l s
No. 97887210 P
l NUMBER P40CEDURE TITLE REVISION 05 EPIP-3.04 ACTIVATION OF EMERGENCY OPERATIONS FACILITY PAGE (WITH 4 ATTACHMENTS) 2 of 6 STEP ACTION / EXPECTED RESPONSE RESPONSENOTOBTAINED 1.
INITIATE EPIP-3.04:
a)
BY:
DATE:
TIME:
NOTE: This procedure should be performed by two persons.
2.
ENTRANCE:
a) Obtain door key to NAPS
)
Training Building, Simulator, Maintenance Area, SRAC office, and Office Supervisors' office from Security Shift Supervisor 3.
AREA SET-UP:
a) Refer to EPIP-3.04, Attachment i and 2 for area locations b) Locate the two (2) status boards stored in the SRAC office and place in the RAC/RM console area.
c) 1. Disconnect TSO Computer Terminal and Printer located in the Training Office Supervisors' office.
- 2. Relocate system to the RAC Area in the Simulator Room.
I
~
v No.97887210 NUNDER PROCEDURE TITLE REVIS10N 05 EPIP-3.04 ACTIVATION OF EMERGENCY OPERATIONS FACILITY PAGE (WITH 4 ATTACHMENTS) 4 of 6
$7EP ACTION / EXPECTED RESPONSE RESPONSENOTORTAINED
- 3) Visitors who have positive ID stating both the individ-ual and organization repre-sented, and who are listed in CERP Manual or are approved for access by the Recovery Manager or his designee.
This shall include repre-sentatives of federal, rtate and local agencies.
a) There will be no te-quirement for visitors to be escorted unless deemed appropriate by the Recovery Manager, his designes or the EOF
)
Security Supervisor.
- 4) Those individuals who do not meet the above criteria but are approved for access by the Recovery Manager B) Personnel Badging:
- 1) After personnel identifiention and authorization have been verified, each person will be issued an " EOF Security Identification Badge" that is te be displayed on the person (in the chest area) at all times while in EOF.
- 2) Badge Issuance
- 1. Vepco Employees (All) - white colored background (100-199)
- 2. Federal Agency Personnel - blue colored background (200-299)
- 3. State Agency Personnel - green colored background (300-399)
- 4. Local Agency Personnel - yellow colored background (400-499)
- 5. Miscellaneous Personnel - red colored background (500-599)
6
~......m s.
NUMBER PROCEDURE TITLE REVISION 05 EPIP-3.04 ACTIVATION OF EMERGENCY OPERATIONS FACILITY PAGE (WITH 4 ATTACHMENTS) 5 of 6 STEP ACTION, EXPECTED RESPONSE RESPONSE NOT08TAINED 6.
PERSONNEL ACCOUNTABILITY a) Prior to a person's initial entry to the EOF, security personnel will record on the " EOF Access Log" (Attachment 4) the following:
- 1. Badge number issued.
- 2. Name of individual.
- 3. Social Security Number of individual.
- 4. Company / organization represented.
(Vepco, include department)
- 5. Access aathorized by (if applicable).
- 6. Whether ascort is required.
- 7. Time of entry.
b) Prior to exiting the EOF, all personnel will be. required to surrender their " EOF Security Identification Badge" and security
_ _.. _ Personnel will record the time of exit on the " EOF Access Log."
c) Re-entry to the EOF will require that all personnel request their previously assigned badge number for that day and, if requested by security personnel, produce positive identification. Security personnel will then record the time of re-entry on the " EOF Access l
l Log."
d) Access authorizations and badge number assignments will be valid through 2400 on the day received. Personnel may retain their assigned badge if staying beyond 2400.
I
(
e) EOF Access Register will be closed-out at 2400 each day (real l
time). Personnel staying in the EOF af ter 2400 vill be transferred by security to the new log.
I f) In addition to the above, all entry and exit to and from the EOF I
will be in accordance with established Health Physica (R.P.)
procedures.
1 No.97847210 NUMBER PROCEDURE TITLE REVJSION OS EPIP-3.04 ACTIVATION OF EMERGENCY OPERATIONS FACILITY PAGE (WITH 4 ATTACHMENTS) 6 of 6 STEP ACTION / EXPECTED RESPONSE RESPONSE NOTOBTAINED s
7.
TERMINATE:
a) Verify Corporate Security a) IF NOT, GO TO Step 5_
personnel have assumed responsibility for EOF Eacurity b) Close out
- 1) COMPLETED BY:
DATE:
TIME:
c) Forward this procedure to SNSOC for review
..)
t END
___.__..__________i____
__._.___________.___._____.._)
g b
no.neersso NUMBER A TTACHMENT TITLE REVISION EPIP-3.04 05 EMERGENCY OPT ATIONS FACILITY ATTACHMENT pAgg 1
COMMUNICATIONS 1 of 1
-2 2,
=
-8
=
-$$ 3 III
.a i
- 5. 3. U 3 - - ~7 7 "
A a
l3 E ~4:2 IvW::
a 3
3 e
E8.
e 3
s t--
u-
~
u n,
, S.
I ]a Es 3 o
v g22 3
2 u
a ;;a; J J J.d 4 a"
5 CCWN-*
d
=
,i u<
w w
l l
8
-g z
r
=
A U
1 l.
7 o
z 7
s o
al m
esos a
i u
(
1
-g 4
2 3
q 3
l 3
3.
l 3h 1
a*5 g g8=:
^
g 2d. g2 j
E 8
,- w
- ~I
.. a S-g~55!."4.*:.0
- 1. 3 m
Om a
o M
~g~3 5
-~
~gu--
3 ~ u : 2 g., ~4 4 5 t'a
=
c-W S=
- * ?.,
(
! ses j==
g gs:HSP-2s"^
dW
~~
- 33. ass.an21=2 s
- z
-u
=
2:
e
- 4 1.o__
ry a
1..=.
sgs 3
She-w 84 4 a 5 d i d i d a d s.: a w
e s.::
<=ueu r
g $. k k.
bu b
3 g
m I
n O
w STO E
3j
=
2.
SS" 222 i
155'
~
N.<?
~~5u
~0**
11:33
.ana.
.l go 53 a-
~~.##
<5EE E'#
O,j 5 s g' g
'I g.=0
=.
F 3 E M O.
5m2o
<m:8 8
225222
,ESS2 U *...
o 1
34 ua
.usw 2
U W.
8
=
___ l a-
=
1l l
l s
. 0* M5
n' q Fso h Q 8 R a mSpCd
8 n
- k" c
NN.
R 8 62 I O
l T
E C
l C
U T
~ ~ ~
i I
A F
R O
~"
l r
T i
o S
S O
l N
B 5
l l-E I
b-T M
[
U l
l 0
l~
M 0
EII O
H Y
C CA R
I sna l
P y
J c
l E
n s'
I C
R e
I N
r a
e e
E m
r N
E a
E N
e
'f d
I T
s RA I
a S
A M
s n
I e
i r
u. d d a e I
~
ee r R
cr o oa t
O I
r s
T PCA s A
.R d
I L
aS r
U d
a l
a n o M
ci B
~
I ad s e#+
c S
l R e u D
r t
F o a Ot t
E a S 4
1 2
NI b
T L
l C
/A l
l l
l rE N L l
D T
nA af eT S
I l
t E
C E
/
O I
S l
A
~
No.97087220 NUMBER A TTACHMENT TITLE REVISION EPIP-3.04 05 EMERGENCY OPERATIONS FACILITY ATTACHMENT PAGE 3
WORK AREAS 1 of 1 EMERGENCY WORK AREA:
CONTROL ROOM:
PBX NUMBER:
Unit No. 1 Control Room Operator 2512 Unic No. 1 Shift Supervissr 2511 Unit No. 2 Control Room Operator 2522 Unit No. 2 Shift Supervisor 2521 TECHNICAL SUPPORT CENTER Station Emergency Manager 2914 Health Physics 2252 Technical Services 2263
~ ~ ~
Operations 2301
/
Maintenance 2254
~~~
NRC
- 2316 OPERATIONAL SUPPORT CENTER Primary OSC 2746 Alternate OSC 2797 EMERGENCY OPERATIONS FACILITY Recovery Manager 2166 SECURITY Secondary Alarm Station (SAS) 2221 Central Alarm Station (CAS) 2249 Shift Supervisor 2224 OTHER VEPCO NUMBERS l
Vepco Information (Visitor) Center 2919 f
l
4 No.97887220 NUMBER A TTACHMENT TITLE REVISION EPIP-3.04 05 EMERGENCY OPERATIONS FACILITY A TTACHMENT PAGE 4
EOF ACCESS LOG 1 of 1
=
s j
E W I a
l l
l l
l l
l l
si I
l l
8 i
l l
i l
8 !d l
3 a Id W
7 W
g u b U
U<
g q-Oy sa I
f.
I I
~
E4 g.
s a
4
-~-
a
.i VIBOINIA ELECTEIC AND PowEn COMPANY RIcaxown, VrmorxxA P3261 Janaary 4, 1984 Mr. James P. O'Reilly Serial No. 001 Regional Administrator N0/ REB /vgv/LM2-080 U. S. Nuclear Regulatory Commission Docket Nos. 50-338 Region II 50-339 101 Marietta Street, Suite 2900 License Nos. NPF-4 Atlanta, Georgia 30303 NPF-7 REVISIONS TO NORTH ANNA POWER STATION
~
EMERGENCY PLAN IMPLEMENTING PROCEDURES
Dear Mr. O'Reilly:
Pursuant to 10CPR 50, paragraph 50.54(q), revisions to the North Anna Power Station Emergency Plan Implementing Procedures subject as listed on enclosure are submitted.
Sincerely, i CV
_D
.L,1%X W. L. Stewart Enclosures cc: Document Control Desk w/o Enclosures cc:
Mr. James R. Miller,~ Chief Operating Reactors Branch No. 3 i
Mr. M. W. Branch - (NRC - North Anna) f e
i i
i
+
VIRGINIA ELECTRIC AND POWER COMPANY
~
REVISIONS TO NORTH ANNA POWER STATION EMERGENCY PLAN IMPLEMENTING PROCEDURES Enclosed are recently revised pages to the North Anna Power Station Emergency Plan Implementing Proceriures.
Please take the following actions in order to keep your manual updated with the most recent revisions.
Remove and Destroy Enter EPIP List EPIP List dated 12-29-83 EPIP 3.04, Activation EPIP 3.04, Activation of Emergency Operations of Emergency Operations Facility Facility dated 12-21-83.
LM2-080/jaj
_.-__._.,.- _.~.__-. ~. _ _
a.
c.
,m -
EPIF PROC. LIST 12-29-83 Page 1 of 3 EMERJENCY PLAN IMPLEMENTING PROCEDURES P
EPIP NO.
Procedure Safety Code Effective Date
" ~
EPIP-1.01 Emergency Manager Controlling Procedure EPIP-1.02 Response to Unusual Ivent S
07-22-82 EPIP-1.03 Response to Alert' S
05-24-83 EPIP-1.04 Hesponse-to Site Emergency S
05-24-83 j
t EPIP-1.05 Response to General Emergency S
05-24-83 e
EPIP-2.01 Notification of State and Local Governments S
05-24-83 EPIP-2.02 Notification of NRC S
07-22-82 EPIP-2.03 Reports of Offsite Agencies S
09-01-82 EPIP-3.01 Callout of Emergency. Response Personnel S
05-24-83 EPIP-3.02 Activation of Technical Support Center E
05-24-83 i
EPIP-3.03 Activation of Operational Support Center S
05-24-83 EPIP-3.04 Activation of Emergency Operations Facility S
12-21-83 EPIP-4.01 Radiological Assessment Director Controlling Procedure S
05-24-83 EPIP-4.02 Radiation Protection Supervisor Controlling Procedure S.
05-24-83 EPIP-4.03 Dose Assessnent Controlling Procedure S
05-24-83 EPIP-4.04
. Emergency Personnel Radiation Exposure S
05-24-83 EPIP-4.05 P.espiratory Protection S
09-01-82
r~s EPIP PROC. Ll; 12-29-83 Page 2 of 3 i
EPIP NO.
Procedure Safety Code Effective Date EPIP-4.06 Personnel Monitoring and Decontamination S
05-24-83 1
EPIP-4.07 Protective Neasures S
05-24-83 EPIP-4.08 Initial Offsite Release Assessment S
05-24-83 4
EPIP-4.09 Source Tern Assessment S
05-24 '
i EPIP-4.10 Determination of X/Q S
05-24-83 EPIP-4.11 Follow-Up Offsite Release Assessment S
05-24-83 5
EPIP-4.12 Offsite Environmental Monitoring Instructions S
05-24-83 i
EPIP-4.13 Offsite Release Assessment with Environmental Data S
05-24-83 i
i EPIP-4.14 Inplant Monitoring S
09-01-82 j
EPIP-4.15 Onsite Monitoring S
05-24-83 EPIP-4.16 Offsite Monitoring S
05-24-83 EPIP-4.17 Monitoring of OSC and TSC S.
05-24-83 1
i EPIP-4.18 Honitoring of EOF S
05-24-83 i
EPIP-4.19 Use of Radios for Health Physica Honitoring S
05-24-83 i
j EPIP-4.20 Health Physics Actions for Transport of Contaminated Injured Personnel S
05-24-83 4
i EPIP-4.21 Evacuation and Remote Assembly Area Monitoring S
09-01-82 EPIP-4.22 Post Accident Sampling of Containment Air S
05-24-83 4
I.
I A
=
m
g EPIP PROC. LIST 12-29-83 Page 3 of'3' EPIP No.
Procedure Safety Code Effective Date EPIP-4.23 Post Accident Sampling of Reactor Coolant S
05-24-83 EPIP-4.24 Gaseous Effluent Sampling During an Emergency S
09-01-82 EPIP-4.25 Liquid Effluent Sampling During an Emergency S
09-01-82 EPIP-4.26 High Level Activity Sample Analysis S
09-01-82 EPIP-5.01 Tranportation of Contaminated Injured Personnel S
09-01-82 EPIP-5.02 Search and Rescue S
07-22-82 EPIP-5.03 Personnel Accountability S
05-24-83 EPIP-5.04 Access Control S
07-22-82 EPIP-5.05 Site Evacuation S
05-24-83 EPIP-5.06 Emergency Radiation Exposure Authorization S
09-01-82 EPIP-5.07 Administration of Radioprotective Drugs S
09-01-82 EPIP-5.08 Damage Control Guideline S
07-22-82 EPIP-6.01 Re-entry / Recovery Guideline S
07-22-82
,