IR 05000413/1985004
| ML20127E265 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 04/18/1985 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| Shared Package | |
| ML20127E268 | List: |
| References | |
| NUDOCS 8505200017 | |
| Download: ML20127E265 (1) | |
Text
'
y$)g
--
.
APR 181985 Duke Power Company ATTN: Mr. H. B. Tucker, Vice President Nuclear Production Department
.422 South Church Street Charlotte, NC 28242 Gentlemen:
SUBJECT: REPORT NO. 50-413/85-04 Thank you for your response of March 28, 1985,to our Notice of Violation issued on February 27, 1985, concerning activities conducted at your Catawba facility under NRC Operating License No. NPF-35.
We have evaluated your response and found that it meets the requirements of 10 CFR 2.201.
We will examine the implementation of your corrective actions during future inspections.
We appreciate your cooperation in this matter.
Sincerely, Virgil L. Brownlee, Chief Reactor Projects Branch 2 Division of Reactor Projects cc:
R. L. Dick, Vice President -
Construction J. W. Hampton, Station Manager bec: G. Johnson, ELD K. N. Jabbour, NRR Document Control Desk State of South Carolina 8505200017 850418 PDR ADOCK 05000413 G
PDR gIb RII
'RII RII I
SBur s:jw AH dt PFkmis f'
4/}l/85 4//b85 4/W/85 4/ p765 lO gEo/
i i i
-