ML20128K423

From kanterella
Revision as of 13:30, 12 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Press Release II-96-84, NRC Postpones Two Meetings Scheduled for Wednesday,961009 at Fl Power Corp Crystal River Plant
ML20128K423
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/07/1996
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
References
PR-II-96-084, PR-II-96-84, NUDOCS 9610110065
Download: ML20128K423 (1)


Text

/

x.

United States Nuclear Regulatory Commission Office of Public Affairs Region II 101 Marietta Street, Suite 2900 Atlanta, GA 30323 No.:

II-96-84 FOR IMMEDIATE RELEASE Contacts: Ken Clark 404-331-5503 (Monday, October 7, 1996)

Roger Hannah 404-331-7878 NRC POSTPONES 'iWO MEETINGS SCHEDULED FOR WEDNESDAY, OCTOBER 9, AT FLORIDA POWER CORPORATION'S CRYSTAL RIVER PLANT The Nuclear Regulatory Commission has postponed two meetings scheduled for Wednesday, October 9, at Florida Power Corporation's Crystal River nuclear power plant in Crystal River due to severe weather predicted for the west coast of Florida where the plant is located.

The first meeting, which was scheduled for 9:00 a.m.,

is a special NRC inspection exit meeting to discuss NRC inspection findings concerning a potential tampering event at Crystal River.

The second meeting, which was scheduled for 10:00 a.m.,

is a special meeting requested by the NRC to dicuss FPC's corrective actions to address weaknesses in engineering performance at the Crystal River plant.

The meetings will be rescheduled for a later date and the NRC will issue a news release announcing the new date and time for each meeting.

9610110065 961007 PDR PRESS R RG-II-96-084 PDR 110034 P go \\

oh