ML20206P232

From kanterella
Revision as of 00:03, 7 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Proposed Tech Specs Section 3.7.4,providing Specific Conditions & Required Actions for Control Bldg Barrier Degradation (as Opposed to Ventilation Train Degradation)
ML20206P232
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 05/10/1999
From:
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
To:
Shared Package
ML20206P230 List:
References
NUDOCS 9905180192
Download: ML20206P232 (12)


Text

I I

SFU System I.

3.7.4

^

[

3.7 PLANT SYSTEMS I

3.7.4 Standby Filter Unit (SFU) System LC0 3.7.4 Two SFU subsystems shall be OPERABLE.

APPLICABILITY:

MODES 1. 2. and 3.

During movement of irradiated fuel assemblies in the secondary containment.

During CORE ALTERATIONS, During Operations with a Potential for Draining the Reactor Vessel (0PDRVs).

ACTIONS CONDITION REQUIRED ACTION COMPLETION TIME A.

One SFU subsystem A.1 Restore SFU subsystem 7 days inoperable.

to OPERABLE status.

k (,Be in MODE 3.

Required Action and 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion o

Time of Condition A

.A_NJ not met in MODE 1. 2.

[@ &,2 or 3.

Be in MODE 4.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />

h.,C%

(continued) 3., %o SFu sAsgs6s 'a.1 Ves%<e ceWoi zq wout e,

'me,ee< A\\e che to b a ick m 3 w w b j h eeer *\\e Co W oI

+o ofeR ABLE shbs w \\ck k j b e d e /

in M6MS bI N3.,

~

{_' _ _ _

_ __ _ _ _ _ __ g oT 6 _.- - - - -- - - - -

% e_ ex

  • H d\\ 'b s \\ c h3 bowdM j M9 ke, &fustd Y

._.- _ _N __

DAEC 3.7-7 Amendment 223 9905180192 990510 PDR ADOCK 05000331 P

PDR l

)

SFU System 3.7.4 ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME Required Action and


NOTE-------------

associated Completion LC0 3.0.3 is not applicable.

Time of Condition A not met during movement of irradiated 1

Place OPERABLE SFU Immediately fuel assemblies in the subsystem in the secondary containment, isolation mode.

during CORE ALTERATIONS. or during, QR OPDRVs.

2.1 Suspend movement of Immediately irradiated fuel assemblies in the secondary containment.

AND I '2.2 Susaend CORE Immediately ALTERATIONS.

9 M.D 2.3 Initiate action to Immediately suspend OPDRVs.

Both SFU subsystems

.1 Enter LCO 3.0.3.

Immediately inoperable in MODE 1.

E 2.or{.

(continued)

%s een.%ss 0%-f

( h C4WtrfTIoM DAEC 3.7-8 Amendment 223

SFU System 3.7.4

~

ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME Both SFU subsystems


NOTE-------------

inoperable during LCO 3.0.3 is not applicable.

movenent of irradiated fuel assemblies in the i

secondary containment,

.1 Suspend movement of Immediately during CORE irradiated fuel ALTERAT:0NS, or during F

assemblies in the OPDRVs.

secondary containment.

MQ

.2 Suspend CORE Immediately ALTERATIONS.

AND

.3 Initiate action to Immediately suspend OPDRVs.

f l

SURVEILLANCE REQUIREMENTS SURVEILLANCE FRE0VENCY SR 3.7.4.1 Operate each SFU subsystem for 31 days a 15 minutes.

SR 3.7.4.2 Perform required SFU filter testing in In accordance a:cordance with the Ventilation Filter with the VFTP Testing Program (VFTP).

(continued)

DAEC 3.7-9 Amendment 223 L

SFU System B 3.7.4 BASES LC0 b.

HEPA filter and charcoal adsorbers are not excessively (continued) restricting flow and are capable of performing their filtration functions: and c.

Heater, demister, ductwork, valves, and dampers are OPERABLE. and air circulation can be maintained.

In addition, the control room boundary must be maintained in a condition sufficiently leak-tight such that the pressurization limit of SR 3.7.4.4 can be met.

However, it is acceptable for access doors to be open for normal control IMsERT room entry and exit and not consider it to be a failure to LC_c A)DTE meet the LCO.

hs e 4

-+

APPLICABILITY In MODES 1. 2. and 3. the SFU System must be OPERABLE to control operator exposure during and following a DBA. since the DBA could lead to a fission product release.

In MODES 4 and 5. the probability and consequences of a DBA are reduced because of the pressure and temperature limitations in these MODES. Therefore. maintaining the SFU System OPERABLE is not required in MODE 4 or 5. except for the following situations under which significant radioactive releases can be postulated:

a.

During Operations with Potential for Draining the Reactor Vessel (OPDRVs):

b.

During CORE ALTERATIONS: and c.

During movement of irradiated fuel assemblies in the secondary containment.

ACTIONS A_1 With one SFU subsystem inoperable. the inoperable 3FU subsystem must be restored to OPERABLE status within 7 days.

With the unit in this condition. the remaining OPERABLE SFU subsystem is adequate to perform control room radiation protection.

However, the overall reliability is reduced because a single failure in the OPERABLE subsystem could result in reduced SFU System' capability.

The 7 day (continued)

DAEC B 3.7-20 Amendment 223

E

)

1

\\

INSERT l

l LCO NOTE Bases i

The LCO is modified by a Note allowing the control building boundary to be opened intermittently under administrative controls. For entry and exit through the doors the administrative control of the opening is performed by the person (s) entering or exiting the area. For other openings these controls consist of stationing a dedicated individual at the opening who is in continuous communication with the control room. This individual will have a method to rapidly close the opening when a need for control building isolation is indicated.

SFU System B 3.7.4 BASES ACTIONS A.1 (continued)

Completion Time is based on the low probability of a DBA occurring during this time period, and that the remaining subsystem can provide the required capabilities.

hSERT1D.

hCoMN'Nh

.1 and In MODE 1. 2. or 3. if the inoperable SFU subsystem cannot be restored to OPERABLE status within the associated Completion Time, the unit must be placed in a MODE that minimizes risk. To achieve this status, the unit must be placed in at least MODE 3 within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in MODE 4 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The allowed Completion Times are reasonable, based on operating experience, to reach the recuired unit conditions from full power conditions in an orcerly manner and without challenging unit systems.

h 1

2.1.

2.2. and 2.3 LCO 3.0.3 is not applicable in MODE 4 or 5.

However. since irradiated fuel assembly movement ca ccur in MODE 1. 2. or

3. the Required Actions of Condition are modified by a Note indicating that LCO 3.0.3 does not apply.

If moving j

irradiated fuel assemblies while in MODE 1. 2. or 3. the fuel movement is independent of reactor operations.

Therefore, inability to suspend movement of irradiated fuel assemblies is not sufficient reason to require a reactor shutdown.

i During movement of irradiated fuel assemblies in the secondary containment, during CORE ALTERATIONS. or during OPDRVs. if the inoperable SFU subsystem cannot be restored to OPERABLE status within the required Completion Time, the OPERABLE SFU subsystem may be placed in the isolation mode (i.e.. one SFU subsystem in operation with the control building isolated). This action ensures that the remaining subsystem is OPERABLE. that no failures that would prevent automatic actuation will occur, and that any active failure will be readily detected.

An alternative to Required Action E.1 is to immediately suspend activities that present a potential for releasing radioactivity that might require isolation of the control (continued)

DAEC B 3.7-21 Amendment 223

INSERT 1

. B.1 If the control building boundary is inoperable in MODES 1,2 and 3 such that the SFU subsystems can not establish or maintain the required pressure, action must be taken to restore an OPERABLE control building boundary within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. The 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Completion Time is reasonable based on the low probability of a DBA occurring during this time period, and the availability of the SFU system to provide a filtered environment (albeit with pctential control building in-leakage).

1

SFU System B 3.7.4 I

BASES h 1.

ACTIONS 2.1.

2.2. and 2.3 (continued) room.

This places the unit in a condition that minimizes risk.

If applicable. CORE ALTERATIONS and movement of irradiated fuel assemblies in the secondary containment must be suspended immediately.

Suspension of these activities shall not preclude completion of movement of a com)onent to a safe position.

Also, if applicable, action must 3e initiated immediately~ to suspend OPDRVs to minimize the probability of a vessel draindown and the subsequent potential for fission product release. Action must continue until the OPDRVs are suspended.

Soc reasows o% er h an hefera.9 e. to&eA WM AM)i g

bou^A^fY(iem Oc*DHod If both SFU subsystems are inoperable in MODE 1. 2. or 3(

the SFU System may not be capable of performing the intended function and the unit is in a condition outside the accident analyses.

Therefore. LC0 3.0.3 must be entered immediately.

!LI.

2. and

.3 LC0 3.0.3 is not applicable in MODE 4 for 5.

However, since irradiated fuel assembly movement canloccur in MODE 1, 2. or

3. the Required Actions of Condition El are modified by a Note indicating that LCO 3.0.3 does not apply.

If moving irradiated fuel assemblies while in MODE 1. 2. or 3. the fuel movement is independent of reactor operations.

Therefore, inability to suspend movement of irradiated fuel assemblies is not sufficient reason to require a reactor shutdown.

During movement of irradiated fuel assemblies in the secondary containment, during CORE ALTERATIONS. or during l

OPDRVs. with two SFU subsystems inoperable, action must be taken imediately to suspend activities that present a potential for releasing radioactivity that might require isolation of the control room. This places the unit in a condition that minimizes risk.

If applicable. CORE ALTERATIONS and movement of irradiated

)

fuel assemblies in the secondary containment must be

]

(continued) 1 DAEC B 3.7-22 Amendment 223

SFU System i

B 3.7.4 l

BASES M 1.

ACTIONS

2. and 3 (continued) suspended immediately.

Suspension of these activities shall not preclude completion of movement of a component to a safe position.

If applicable. action must be initiated immediately to suspend OPDVRs to minimize the probability of a vessel draindown and subsequent potential for fission product release. Action must continue until the OPDRVs are suspended.

SURVEILLANCE SR 3.7.4.1 REQUIREMENTS Operating each SFU subsystem for = 15 minutes ensures that botn subsystems are OPERABLE and that all associated controls are functioning properly.

It also ensures that blockage or fan or motor failure, can be detected for corrective action.

Since the SFU subsystems do not take credit for the heaters that are installed. each. subsystem need only be operated for a 15 minutes to demonstrate the function of each subsystem. The 31 day Frequency was developed in consideration of the known reliability of fan motors and controls and the redundancy available in the system.

SR 3.7.4.2 l

This SR verifies that the required SFU testing is performed in accordance with the Ventilation Filter Testing Program (VFTP).

The VFTP includes testing HEPA filter performance, charcoal adsorber efficiency, minimum syttem flow rate, and the physical properties of the activated charcoal (general use and following specific operations).

Specific test frequencies and additional information are discussed in detail in the VFTP.

SR 3.7.4.3 This SR verifies that on an actual or simulated initiation signal, each SFU subsystem starts and operates. This SR also ensures that the control room isolates.

The LOGIC SYSTEM FUNCTIONAL TEST in LCO 3.3.7.1. " Standby Filter Unit Instrumentation." overlaps this-SR to provide complete (continued)

DAEC B 3.7-23 Amendment 223

T$CR-Oll to NG-99-0276 PageIofI SAFETY ASSESSMENT l

By letter dated May 10,1999, IES Utilities, Inc. submitted a request for revision of Technical Specifications for the Duane Arnold Energy Center (DAEC). The proposed change is consistent with Revision 2 to Traveler TSTF-287 for the Improved Standard Technical Specifications for General Electric BWR/4 plants (NUREG-1433). This traveler is currently in the TSTF review process.

Evaluation:

This change provides specific Conditions and Required Actions for control building barrier degradation (as opposed to ventilation train degradation). The Surveillances that test the integrity of the control room banier require a positive pressure limit to be satisfied for the control room with one required ventilation train operating. While other Surveillances in the same specification test the operability of the ventilation train, these barrier surveillances ensure the control building envelope leak tightness is adequate to meet the design assumptions. However, there are no corresponding Conditions, Required Actions, or Completion Times associated with failure of these barrier Surveillances.

Under existing specifications, LCO 3.0.3 must be entered (for two train inoperability).

The proposed change would allow 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> (during operating MODES) to restore the capability to maintain proper control room pressure before requiring the unit to perform an orderly shutdown. Requiring the plant to enter LCO 3.0.3 when the ventilation envelope is not intact is excessively restrictive. The proposed change is acceptable 4

because of the low probability (less than 3.04x10 ) of a DBA occurring during the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Completion Time, and the availabihty of the SFU system to provide a filtered environment (albeit with potential control building in-leakage).

An LCO Note is being added to allow intermittent opening of the control building barrier (e.g. as for entering and exiting) under administrative control without entering the Actions. This change allows for intermittent opening of control building doors and other readily closable control building boundaries. For entry and exit through the doors the administrative control of the opening is performed by the person (s) entering or exiting the area. For other openings these controls consist of stationing a dedicated individual at the opening who is in continuous communication with the ( ontrol room. This individual will have a method to rapidly close the opening when a need for control building isolation is indicated.

Therefore, based on the above, we have concluded that the proposed revision to the DAEC Technical Specifications is acceptable.

l

TSCR-Oli to NG-99-0276 Page1of2 ENVIRONMENTAL CONSIDERATION 10 CFR Section 51.22(c)(9) identifies certain licensing and regulatory actions which are eligible for categorical exclusion from the requirement to perform an environmental assessment. A proposed amendment to an operating license for a facility requires no environmental assessment if operation of the facility in accordance with the proposed amendment would not: (1) involve a significant hazards consideration; (2) result in a significant change in the types or significant increase in the amounts of any effluents that may be released off site; and (3) result in a significant increase in individual or cumulative occupational radiation exposure. IES Utilities Inc. has reviewed this request and determined that the proposed amendment meets the eligibility criteria for categorical exclusion set forth in 10 CFR Section 51.22(c)(9). Pursuant to 10 CFR Section 51.22(b),

no environmental impact statement or environmental assessment needs to be prepared in connection with the issuance of the amendment. The basis for this determination follows:

Basis The change meets the eligibility criteria for categorical exclusion set forth in 10 CFR Section 51.22(c)(9) for the following reasons:

1.

As demonstrated in Attachment I to this letter, the proposed amendment does not involve a significant hazards consideration.

2.

This change provides specific Conditions and Required Actions for control building barrier degradation (as opposed to ventilation train degradation).

The Surveillances that test the integrity of the control room barrier require a positive pressure limit to be satisfied for the control room with one required ventilation train operating. While other Surveillances in the same specification test the operability of the ventilation train, these barrier Surveillances ensure the control building envelope leak tightness is adequate to meet the design assumptions. However, there are no corresponding Conditions, Required Actions, or Completion Times associated with failure of these barrier Surveillances. Under existing specifications, LCO 3.0.3 must be entered (for two train inoperability).

The proposed change would allow 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> (during toerating MODES) to restore the capabihty to maintain proper control room pressure before requiring the unit to perform an orderly shutdown and also allows intermittent opening of the control building barrier under administrative control. Requiring the plant to enter LCO 3.0.3 when the ventilation envelope is not intact is excessively restrictive.

The proposed change is acceptable because of the low probability (less than 4

3.04x10 ) of a DBA occurring during the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Completion Time, and the availability of the SFU system to provide a filtered environment (albeit with potential control building in-leakage).

An LCO Note is being added to allow intermittent opening of the control building (e.g. as for entering and exiting) without entering the Actions. This change allows

hsCR-011

- to NG-99-0276 Page 2 of 2 for intermittent opening of doors and other readily closable control building boundaries. For entry and exit through the doors the administrative control of the opening is performed by the person (s) entering or exiting the area. For other openings these controls consist of stationing a dedicated individual at the opening who is in continuous communication with the control room. This individual will have a method to rapidly close the opening when a need for control building isolation is indicated.

Thus, there will be no significant change in the types or significant increase in the amounts of any effluents that may be released off site.

3.

This change provides specific Conditions and Required Actions for control building barrier degradation (as opposed to ventilation train degradation).

The Surveillances that test the integrity of the control room require a positive pressure limit to be satisfied in the control rocm with one required ventilation train operating. While other Surveillances in the same specification test the operability of the ventilation train, these barrier Surveillances ensure the control building envelope leak tightness is adequate to meet the design assumptions.

However, there are no corresponding Conditions, Required Actions, or Completion Times associated with failure of these barrier Surveillances. Under existing specifications, LCO 3.0.3 must be entered (for two train inoperability).

The proposed change would allow 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> (during operating MODES) to restore the capability to maintain proper control room pressure before requiring the unit to perform an orderly shutdown and also allows intermittent opening of the control building barrier under administrative control. Requiring the plant to enter LCO 3.0.3 when the control building envelope is not intact is excessively restrictive. The proposed change is acceptable because of the low probability (less than 3.04x10' ) of a DBA occurring during the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> Completion Time, and the availability of the SFU system to provide a filtered environment (albeit with potential control room in-leakage).

An LCO Note is being added to allow intermittent opening of the control building (e.g. as for entering and exiting) without entering the Actions. This change allows for intermittent opening of doors and other readily closable control building boundaries. For entry and exit through the doors the administrative control of the opening is performed by the person (s) entering or exiting the area. For other openings these controls consist of stationing a dedicated individual at the opening who is in continuous communication with the control room. This individual will have a method to rapidly close the opening when a need for control building isolation is indicated.

Thus, there will be no significant increase in either individual or cumulative occupational radiation exposure.