|
---|
Category:SAFETY EVALUATION REPORT--LICENSING & RELATED ISSUES
MONTHYEARML20207A7181999-05-13013 May 1999 Safety Evaluation Supporting Amends 134 & 132 to Licenses DPR-80 & DPR-82,respectively ML20206H2861999-05-0303 May 1999 Safety Evaluation Supporting Amends 133 & 131 to Licenses DPR-80 & DPR-82,respectively ML20206D5661999-04-29029 April 1999 Safety Evaluation Supporting Amends 132 & 130 to Licenses DPR-80 & DPR-82,respectively ML20205B6061999-03-26026 March 1999 Safety Evaluation Supporting Amends 131 & 129 to Licenses DPR-80 & DPR-82,respectively ML20249B6881998-06-11011 June 1998 Safety Evaluation Supporting Amends 128 & 126 to Licenses DPR-80 & DPR-82,respectively ML20249B5961998-06-0505 June 1998 Safety Evaluation Supporting Amends 127 & 125 to Licenses DPR-80 & 82,respectively ML20249B6041998-06-0505 June 1998 Safety Evaluation Supporting Amends 126 & 124 to Licenses DPR-80 & DPR-82,respectively ML20248D4041998-05-28028 May 1998 Safety Evaluation Supporting Amends 125 & 123 to Licenses DPR-80 & DPR-82,respectively ML20248L8761998-03-12012 March 1998 Safety Evaluation Supporting Amends 124 & 122 to Licenses DPR-80 & DPR-82,respectively ML20197B7091998-02-27027 February 1998 Safety Evaluation Supporting Amends 123 & 121 to Licenses DPR-80 & DPR-82,respectively ML20203L4881998-02-17017 February 1998 Safety Evaluation Supporting Amends 122 & 120 to Licenses DPR-80 & DPR-82,respectively ML20203L2981998-02-13013 February 1998 Safety Evaluation Supporting Amends 121 & 119 to Licenses DPR-80 & DPR-82,respectively ML20203M4321998-02-0303 February 1998 Safety Evaluation Supporting Amends 120 & 118 to Licenses DPR-80 & DPR-82,respectively ML20149H4281997-07-17017 July 1997 Corrected SE Re Amends 119 & 117 to Licenses DPR-80 & DPR-82,respectively ML20129G9351996-10-25025 October 1996 Safety Evaluation Supporting Amends 117 & 115 to Licenses DPR-80 & DPR-82,respectively ML20129G7771996-10-25025 October 1996 Safety Evaluation Supporting Amends 116 & 114 to Licenses DPR-80 & DPR-82,respectively ML20129J4311996-10-18018 October 1996 Safety Evaluation Approving Corporate Restructuring & Establishment of Holding Company Under Temporary Name PG&E Parent Co.,Inc of Which PG&E Would Become Wholly Owned Subsidiary ML20117E5541996-08-19019 August 1996 Safety Evaluation Supporting Amends 115 & 113 to Licenses DPR-80 & DPR-82,respectively ML20117K4671996-05-28028 May 1996 Safety Evaluation Supporting Amends 113 & 111 to Licenses DPR-80 & DPR-82,respectively ML20092F3411995-08-23023 August 1995 Corrected SE Supporting Amends 107 & 106 to Licenses DPR-82 & DPR-80,respectively ML20082H9121995-04-11011 April 1995 Safety Evaluation Supporting Amends 99 & 98 to Licenses DPR-80 & DPR-82,respectively ML20063M1481994-03-0303 March 1994 Safety Evaluation Supporting Amends 90 & 89 to Licenses DPR-80 & DPR-82,respectively ML20063M1111994-03-0202 March 1994 Safety Evaluation Supporting Amends 89 & 88 to Licenses DPR-80 & DPR-82,respectively ML20063M0431994-02-24024 February 1994 Safety Evaluation Supporting Amends 88 & 87 to Licenses DPR-80 & DPR-82,respectively NUREG-0675, SER Concluding That Seismic Margins of Structures & Equipment/Components at Plant Reported in LTSP Final Rept Are Adequate Even After Considering Staff Estimate of Increased Seismic Ground Motions1992-04-17017 April 1992 SER Concluding That Seismic Margins of Structures & Equipment/Components at Plant Reported in LTSP Final Rept Are Adequate Even After Considering Staff Estimate of Increased Seismic Ground Motions ML20092E0021992-01-22022 January 1992 Safety Evaluation Supporting Amends 67 & 66 to Licenses DPR-80 & DPR-82,respectively ML20082V1441991-09-0606 September 1991 Safety Evaluation Supporting Amends 66 & 65 to Licenses DPR-80 & DPR-82,respectively ML20082V2621991-09-0505 September 1991 Safety Evaluation Supporting Amends 65 & 64 to Licenses DPR-80 & DPR-82,respectively ML20081L3021991-06-27027 June 1991 Safety Evaluation Supporting Amends 62 & 61 to Licenses DPR-80 & DPR-82,respectively ML20081F2021991-05-23023 May 1991 Safety Evaluation Supporting Amends 61 & 60 to Licenses DPR-80 & DPR-82,respectively ML20070H1821991-03-0606 March 1991 Safety Evaluation Supporting Amends 59 & 58 to Licenses DPR-80 & DPR-82,respectively ML20246K9501989-07-10010 July 1989 Safety Evaluation Supporting Amends 42 & 41 to License DPR-80 & DPR-82,respectively ML20245F8371989-06-22022 June 1989 Safety Evaluation Supporting Amends 41 & 40 to Licenses DPR-80 & DPR-82,respectively ML20244C8771989-06-0707 June 1989 Safety Evaluation Supporting Amends 40 & 39 to Licenses DPR-80 & DPR-82,respectively ML20244C8551989-06-0707 June 1989 Safety Evaluation Supporting Amends 39 & 38 to Licenses DPR-80 & DPR-82,respectively ML20247H9771989-05-23023 May 1989 Safety Evaluation Supporting Amends 38 & 37 to Licenses DPR-80 & DPR-82,respectively ML20247B1201989-05-10010 May 1989 Safety Evaluation Supporting Amends 37 & 36 to Licenses DPR-80 & DPR-82,respectively ML20245L2511989-04-25025 April 1989 Safety Evaluation Supporting Amends 36 & 35 to Licenses DPR-80 & DPR-82,respectively ML20245H6991989-04-14014 April 1989 Safety Evaluation Supporting Amends 34 & 35 to Licenses DPR-82 & DPR-80,respectively ML20247L2931989-03-27027 March 1989 Safety Evaluation Supporting Amends 34 & 33 to Licenses DPR-80 & DPR-82,respectively ML20153E5331988-08-29029 August 1988 Safety Evaluation Supporting Amends 31 & 30 to Licenses DPR-80 & DPR-82,respectively ML20196E4811987-12-28028 December 1987 Safety Evaluation Supporting Amends 26 & 25 to Licenses DPR-80 & DPR-82,respectively ML20238C4611987-12-16016 December 1987 Safety Evaluation Supporting Amends 24 & 23 to Licenses DPR-80 & DPR-82,respectively ML20238C6061987-12-16016 December 1987 Safety Evaluation Supporting Amends 25 & 24 to Licenses DPR-80 & DPR-82,respectively ML20235G7671987-09-18018 September 1987 Safety Evaluation Supporting Amends 21 & 20 to Licenses DPR-80 & DPR-82,respectively ML20238D3871987-09-0303 September 1987 Safety Evaluation Supporting Amends 19 & 18 to Licenses DPR-80 & DPR-82,respectively ML20238D3931987-09-0303 September 1987 Safety Evaluation Supporting Amends 20 & 19 to Licenses DPR-80 & DPR-82,respectively ML20237L5631987-08-31031 August 1987 Safety Evaluation Supporting Amends 18 & 17 to Licenses DPR-80 & DPR-82,respectively ML20237G5541987-08-27027 August 1987 Safety Evaluation Supporting Amends 17 & 16 to Licenses DPR-80 & DPR-82,respectively ML20236H3811987-07-27027 July 1987 Safety Evaluation Supporting Amends 16 & 15 to Licenses DPR-80 & DPR-82,respectively 1999-05-03
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20211A9981999-07-12012 July 1999 Draft,Probabilistic Safety Assessment, Risk Info Matrix, Risk Ranking of Systems by Importance Measure ML20207A7181999-05-13013 May 1999 Safety Evaluation Supporting Amends 134 & 132 to Licenses DPR-80 & DPR-82,respectively ML20206H2861999-05-0303 May 1999 Safety Evaluation Supporting Amends 133 & 131 to Licenses DPR-80 & DPR-82,respectively ML20206D5661999-04-29029 April 1999 Safety Evaluation Supporting Amends 132 & 130 to Licenses DPR-80 & DPR-82,respectively ML20205B6061999-03-26026 March 1999 Safety Evaluation Supporting Amends 131 & 129 to Licenses DPR-80 & DPR-82,respectively DCL-99-045, 1998 Annual Financial Rept for PG&E Corp. with1998-12-31031 December 1998 1998 Annual Financial Rept for PG&E Corp. with ML20249B6881998-06-11011 June 1998 Safety Evaluation Supporting Amends 128 & 126 to Licenses DPR-80 & DPR-82,respectively ML20249B5961998-06-0505 June 1998 Safety Evaluation Supporting Amends 127 & 125 to Licenses DPR-80 & 82,respectively ML20249B6041998-06-0505 June 1998 Safety Evaluation Supporting Amends 126 & 124 to Licenses DPR-80 & DPR-82,respectively ML20248D4041998-05-28028 May 1998 Safety Evaluation Supporting Amends 125 & 123 to Licenses DPR-80 & DPR-82,respectively ML20248L8761998-03-12012 March 1998 Safety Evaluation Supporting Amends 124 & 122 to Licenses DPR-80 & DPR-82,respectively ML20197B7091998-02-27027 February 1998 Safety Evaluation Supporting Amends 123 & 121 to Licenses DPR-80 & DPR-82,respectively ML20203J5141998-02-26026 February 1998 LER 98-S02-00:on 980127,following Security Sys Failure Compensatory Measures Were Not Implemented within 10 Minutes Due to Personnel Error.Caused by Failed Disk Drive. Replaced Disk Drives,Reviewed Security Computer Maint Plans ML20203L4881998-02-17017 February 1998 Safety Evaluation Supporting Amends 122 & 120 to Licenses DPR-80 & DPR-82,respectively ML20203L2981998-02-13013 February 1998 Safety Evaluation Supporting Amends 121 & 119 to Licenses DPR-80 & DPR-82,respectively ML20203M4321998-02-0303 February 1998 Safety Evaluation Supporting Amends 120 & 118 to Licenses DPR-80 & DPR-82,respectively ML20217G5151997-12-31031 December 1997 1997 PG&E Corp Annual Rept ML20205F5881997-07-24024 July 1997 Decommissioning Cost Estimate for Diablo Canyon Power Plant,Units 1 & 2 ML20149H4281997-07-17017 July 1997 Corrected SE Re Amends 119 & 117 to Licenses DPR-80 & DPR-82,respectively ML17264A9381997-07-10010 July 1997 Deficiency Rept Re Potential Safety Hazard Associated w/FM-Alco 251 Engin,High Pressure Fuel tube-catalog: 4401031-2 in Which Dual Failure Mode Exists.Caused by Incorrect Forming Process ML17083C6231997-01-31031 January 1997 Rev 4 to WCAP-13705, W Setpoint Methodology for Protection Sys Diablo Canyon Units 1 & 2,24 Month Fuel Cycle Evaluation. ML16343A4741997-01-31031 January 1997 WCAP-11595,Rev 2, W Improved Thermal Design Procedure Instrument Uncertainty Methodology Diablo Canyon Units 1 & 2 24 Month Fuel Cycle Evaluation. ML16342D5351997-01-31031 January 1997 WCAP-14826, Instrumentation Calibr & Drift Evaluation Process for Diablo Canyon Units 1 & 2,24 Month Fuel Cycle Evaluation. ML18102B6911997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Diablo Canyon Power Plant,Units 1 & 2.W/970218 Ltr ML16342D5541996-12-31031 December 1996 Non-proprietary Nrc/Util Meeting on Model 51 SG Tube Integrity & ARC Methodology. DCL-97-045, Pacific Gas & Electric Co 1996 Annual Rept1996-12-31031 December 1996 Pacific Gas & Electric Co 1996 Annual Rept ML20129G9351996-10-25025 October 1996 Safety Evaluation Supporting Amends 117 & 115 to Licenses DPR-80 & DPR-82,respectively ML20129G7771996-10-25025 October 1996 Safety Evaluation Supporting Amends 116 & 114 to Licenses DPR-80 & DPR-82,respectively ML20129J4311996-10-18018 October 1996 Safety Evaluation Approving Corporate Restructuring & Establishment of Holding Company Under Temporary Name PG&E Parent Co.,Inc of Which PG&E Would Become Wholly Owned Subsidiary ML20117E5541996-08-19019 August 1996 Safety Evaluation Supporting Amends 115 & 113 to Licenses DPR-80 & DPR-82,respectively ML20116B8491996-07-22022 July 1996 Revised Special Rept SR 95-03:on 950621,EDG 1-2 Failed to Load During Surveillance Testing.Caused by Loose Fuse Holder Contact Clip.Retensioned Loose Fuse Holder Contact Clip & Tightened Loose Wire Connection ML20116B8521996-07-22022 July 1996 Revised Special Rept SR 95-04:on 950718,EDG 1-2 Load Swings Occurred.Caused by Defective Electronic Governor Stability Potentiometer.Replaced Electronic Governor DCL-96-155, Revised Special Rept SR 95-05:on 950806,EDG 1-2 to Achieve Rated Output Frequency within TS Limits.Caused by Degraded Electronic Governor Performance.Replaced Electronic Governor Motor Operated Potentiometer & Electronic Governor1996-07-22022 July 1996 Revised Special Rept SR 95-05:on 950806,EDG 1-2 to Achieve Rated Output Frequency within TS Limits.Caused by Degraded Electronic Governor Performance.Replaced Electronic Governor Motor Operated Potentiometer & Electronic Governor ML20117K4671996-05-28028 May 1996 Safety Evaluation Supporting Amends 113 & 111 to Licenses DPR-80 & DPR-82,respectively ML20236Q2611996-04-15015 April 1996 Rev 0 to DCP M-050284, Design Change Package for Installation of CCW Surge Tank Pressurization Sys for Unit 1 ML20094M6251995-11-21021 November 1995 Final Part 21 Rept of Investigation & Analysis of Suspect Fasteners Event 29257.B&G-Cardinal Discontinued Using Heat Treatment Equipment at Cardinal Facility Until Such Time That Satisfactory Mods Made to Hardware & Procedures ML20092F3411995-08-23023 August 1995 Corrected SE Supporting Amends 107 & 106 to Licenses DPR-82 & DPR-80,respectively ML18064A8631995-08-14014 August 1995 LER 95-004-00:on 950714,determined That Redundant DG Circuits Not Separated Per App R Due to Insufficient App R Program Documentation.Hourly Fire Tour Established in EDG 1-1 Room & Review of LERs for App R Completed ML20082H9121995-04-11011 April 1995 Safety Evaluation Supporting Amends 99 & 98 to Licenses DPR-80 & DPR-82,respectively ML18100B2981994-05-24024 May 1994 LER 94-014-00:on 940426,SG 1-2 Automatically Started When Two Indicating Light Sockets Shorted Together Due to Personnel Error.Description of Event & Lessons Learned Will Be Published in Operations Incident Summary.W/940524 Ltr ML20063M1481994-03-0303 March 1994 Safety Evaluation Supporting Amends 90 & 89 to Licenses DPR-80 & DPR-82,respectively ML20063M1111994-03-0202 March 1994 Safety Evaluation Supporting Amends 89 & 88 to Licenses DPR-80 & DPR-82,respectively ML20063M0431994-02-24024 February 1994 Safety Evaluation Supporting Amends 88 & 87 to Licenses DPR-80 & DPR-82,respectively ML16342C3091993-12-31031 December 1993 Monthly Operating Repts for Dec 1993 for Dcnpp Units 1 & 2 ML16342A3691993-08-31031 August 1993 Revised MOR for Aug 1993 for Dcnpp Unit 1 ML16342A3681993-07-31031 July 1993 Revised MOR for July 1993 for Dcnpp Unit 1 ML20046A6611993-07-21021 July 1993 Cycle 6 Startup Rept. ML20059G6811993-06-30030 June 1993 Revised MOR for June 1993 for Dcnpp Unit 1 ML20045D1731993-05-31031 May 1993 Monthly Operating Repts for May 1993 for Diablo Canyon,Units 1 & 2 ML16342A3671993-05-31031 May 1993 Revised MOR for May 1993 for Dcnpp Unit 1 1999-07-12
[Table view] |
Text
.
SAFETY EVALUATION GENERIC LETTER 83-28, ITEMS 3.2.1 AND 3.2.2 r -
PACIFIC GAS AND ELECTRIC COMPANY DIABLO CANYON' NUCLEAR POWER PLANT, UNIT NO. 1 4
DOCKET NO. 50-275 I.
INTRODUCTION On February 25, 1983, during startup of the Salem Unit'1 Nuclear Plant, both circuit breakers in the Reactor Trip System failed to open automatically upon receipt of a valid trip signal.- As a result of that event, the NRC's Office of Inspection and Enforcement issued IE Bulletin 83-01 which described the event and requested specified prompt corrective and preventive actions by licensees. As the cause and ramifications of the event were more clearly developed, the NRC's Office of Nuclear Reactor Regulation issued on July 8, 1983, Generic Letter 83-28, " Required Actions Based on Generic Implications of Salem ATWS Events." This letter addressed issues related to reactor trip system reliability and general management capability. The letter was sent to all licensees of operating reactors, applicants for operating licenses and holders of construction permits.
One of the areas of reactor trip system reliability considered in Generic 4
Letter 83-28 (GL 83-28), is that the post-maintenance testing of safety-related components other than those in the reactor trip system. This is identified in GL 83-28 as Items 3.2.1 and 3.2.2.
This evaluation addresses the acceptability of the response to these items provided by the Pacific Gas and Electric Company (the licensee) for the Diablo Canyon Nucicar Power Plant, Unit No. 1 (the facility).
II.
EVALUATION Items 3.2.1 and 3.2.2 of GL 83-28 state as follows:
"1.
Licensees and applicants shall submit a report documenting the extending of test and maintenance procedures and Technical 1
Specifications to assure that post-maintenance operability testing of all safety-related equipment is required to be conducted and that the testing demonstrates that the equipment is capable of performing its safety functions before being returned to service.
"2.
Licensees and applicants shall submit the results of their check of vendor and engineering recommendations to ensure that any appropriate test guidance is included in the test and maintenance procedures or Technical Specifications, where required."
By letters dated November 7, 1983 and March 20, 1986, the licensee l
responded to GL 83-28, Items 3.2.1. and 3.2.2.
l 86091900S9 860911 PDR ADOCK 05000275 P
PDR i
2 Regarding Item 3.2.1, the licensee's letter of March 20, 1986, states Administrative Procedures NPAP-C6, " Clearances", and AP-C-6S3,
" Post-M intenance Testing", ensure that appropriate tests are conducted a
to verify that equipment removed from service for maintenance (either corrective or preventive) is tested prior to its return to service to determine that it is operable and is capable of performing its intended safety functions. The licensee adds that following completion of maintenance work, the appropriate post-maintenance test is run after the equipment is returned to service, but before the equipment is declared " operable".
Regarding Item 3.2.2, (incorporation of vendor recommendations in test and maintenance procedures), the licensee's letter of March 20, 1986, states that the licensee has reviewed the applicable vendor and engineering recommendations to ensure that appropriate test guidance is included in maintenance procedures as required. Regarding post-maintenance test procedures, however, the licensee states a few recommendations require further review to determine if they should be incorporated in future procedure revisions. The licensee estimates this process, including procedure revision, will be completed by June 30, 1986.
III. CONCLUSIONS Based on the licensee's description of facility procedures which require post-maintenance testing of safety-related equipment to demonstrate its operability and capability to perform its intended safety function, we conclude the licensee has satisfactory completed the actions requested by Generic Letter 83-28, Item 3.2.1.
Accordingly, this item is closed.
Based on the licensee's statement that applicable vendor and engineering recommendations have been reviewed and are in the process of being incorporated in test and maintenance procedures, as appropriate, we conclude the licensee is acceptably performing the actions request by 2
Generic Letter 83-28, Item 3.2.2.- Accordingly, this item is closed.
Date:
Principal Contributor:
G. Zwetzig i
.,