Letter Sequence Response to RAI | |
---|---|
TAC:MF3240, Provide RISK-INFORMED Extended Completion Times - RITSTF Initiative 4B (Open) | |
Initiation | |
MONTHYEARDCL-13-106, License Amendment Request 13-02 - Revision to Technical Specifications to Adopt Risk Informed Completion Times TSTF-505. Revision 1. Provide Risk-Informed Extended Completion Times-RITSTF Initiative 482013-11-25025 November 2013
[Table View]License Amendment Request 13-02 - Revision to Technical Specifications to Adopt Risk Informed Completion Times TSTF-505. Revision 1. Provide Risk-Informed Extended Completion Times-RITSTF Initiative 48 Project stage: Request ML14059A1592014-02-28028 February 2014 NRR E-mail Capture - Acceptance Review e-mail for MF3240 and MF3241 - Revision to TS to Adopt Risk Informed Completion Times TSTF-505. Rev. 1 Project stage: Acceptance Review ML14319A0062014-11-13013 November 2014 NRR E-mail Capture - Diablo Canyon Proposed Amendment Using TSTF-505, Rev. 1 Project stage: Other DCL-14-110, One-Hundred-Twenty-Day Response to NRC Request for Additional Information - National Fire Protection Association Standard 805, Part 1 of 22014-11-26026 November 2014 One-Hundred-Twenty-Day Response to NRC Request for Additional Information - National Fire Protection Association Standard 805, Part 1 of 2 Project stage: Response to RAI ML14339A6292014-12-0505 December 2014 NRR E-mail Capture - Target Date for Response to the RAI Re. Proposed Amendment Using TSTF-505, Rev. 1 Project stage: RAI ML15050A1952015-02-18018 February 2015 NRR E-mail Capture - Diablo Canyon - RAI on Instrumentation and Controls for the Proposed TSTF-505 Amendment Project stage: RAI ML15180A3882015-06-29029 June 2015 NRR E-mail Capture - Diablo Canyon 1 and 2 - RAIs for LAR Associated with TSTF-505, Rev. 1 Project stage: RAI ML15232A0102015-08-0404 August 2015 Diablo Canyon Power Plant - Risk-Informed Technical Specification Completion Times (TSTF-505) License Amendment Request: August 4, 2015 Project stage: Request ML15216A4112015-08-0404 August 2015 TSTF-505: August 4, 2015 Public Meeting Project stage: Meeting ML15233A0052015-09-0909 September 2015 Summary of Meeting with Pacific Gas and Electric to Discuss Diablo Canyon, Units 1 & 2 License Amendment Request to Adopt Risk-Informed Completion Times, TSTF-505, Revision 1, Provide Risk-Informed Extended Completion Times-RITSTF. Initiati Project stage: Meeting 2014-02-28 |
ML14330A635 | |
Person / Time | |
---|---|
Site: | Diablo Canyon |
Issue date: | 11/26/2014 |
From: | Summy J S Pacific Gas & Electric Co |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
Shared Package | |
ML14332A120 | List: |
References | |
DCL-14-110 | |
Download: ML14330A635 (45) | |
Similar Documents at Diablo Canyon | |
---|---|
Category:Graphics incl Charts and Tables
MONTHYEARML23241A1532023-05-25025 May 2023
[Table view]7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-2, Drawing 102002, 6A, Rev. 113, Condensate System ML23241A2032023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495885, Revision 5, Sheet 1, I & C Functional Logic Diagram Auxiliary Feedwater Pumps Startup ML23241A2542023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-13, Drawing 108013, Sheet 2, Rev. 37, Spent Fuel Pit Cooling System ML23241A3362023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-21, Drawing 108021, Sheet 5A, Rev. 44, Combustion Air and Exhaust System 2-2 ML23241A5182023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.2-19, Drawing 108019, Sheet 6B, Rev. 18, Liquid Radwaste Media Filters and Radwaste Ion Exchangers ML23241A5682023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 7, Figure 7.2-1, Drawing 495849, Revision 7, Sheet 1, I & C Functional Logic Diagram Rod Controls & Rod Blocks ML23241A6112023-05-25025 May 2023 7 to Updated Final Safety Analysis Report, Chapter 3, Figure 3.8-59, Drawing 439509, Sheet 1, Rev. 4, Mechanical Requirements for 125 Ton Crane Auxiliary Building Fuel Handling Area DCL-22-039, Irradiated Fuel Management Plan, Revision 12022-10-12012 October 2022 Irradiated Fuel Management Plan, Revision 1 ML22108A1652022-05-0303 May 2022 Enclosure 2 - Timeline of Event ML21305A4022021-10-11011 October 2021 6 to Updated Final Safety Analysis Report, Figure 3.2-23, Sheet 22 of 53, Drawing 108023, Revision 75, Sheet 13, Ventilation & Air Conditioning Systems ML19259A1112019-09-16016 September 2019 Exemption Spreadsheet ML16314C2912016-11-0909 November 2016 Graphics, Charts and Tables for Pacific Gas & Electric Co. SER 7 Item (6) Subitem (5)(d) ML16083A5512016-03-30030 March 2016 Interim Staff Response to Reevaluated Flood Hazards Submitted in Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation ML16056A1392016-03-11011 March 2016 Correction to the U.S. Nuclear Regulatory Commission Analysis of Licensees' Decommissioning Funding Status Reports ML16004A3552015-12-17017 December 2015 Response to NRC Request for Additional Information Regarding License Amendment Request 15-03, Regulatory Guide 1.183 Conformance Tables, Revision 1 ML16048A2082015-12-15015 December 2015 Wastewater Treatment Unit Schematic ML16048A2152015-12-15015 December 2015 Fleet Vehicle-Asset List DCL-15-131, Pressurizer Spray Line Pipe Weld Flaw Evaluation, Calculation Package, Part 22015-11-0303 November 2015 Pressurizer Spray Line Pipe Weld Flaw Evaluation, Calculation Package, Part 2 ML15233A0062015-09-10010 September 2015 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML16133A0792015-07-0101 July 2015 NRC to Nfms Second Scoping Letter July 1 2015 ML15160A261 ML16048A2122014-12-31031 December 2014 Hazardous Waste Volume Trends 1994-2014 ML14307B7072014-12-10010 December 2014 Supplemental Information Related to Development of Seismic Risk Evaluations for Information Request Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-T ML14330A6392014-11-26026 November 2014 One-Hundred-Twenty-Day Response to NRC Request for Additional Information - National Fire Protection Association Standard 805, Part 2 of 2 DCL-14-110, One-Hundred-Twenty-Day Response to NRC Request for Additional Information - National Fire Protection Association Standard 805, Part 1 of 22014-11-26026 November 2014 One-Hundred-Twenty-Day Response to NRC Request for Additional Information - National Fire Protection Association Standard 805, Part 1 of 2 DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 2, GEO.DCPP.TR.12.01 R1 Figures 09-02-142014-09-10010 September 2014 Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 2, GEO.DCPP.TR.12.01 R1 Figures 09-02-14 DCL-14-081, Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 5, GEO.DCPP.TR.14.04 R0 App A-G Figures 08-06-142014-09-10010 September 2014 Diablo Canyon Units 1 and 2, Central Coastal California Seismic Imaging Project (Cccsip) Chapter 5, GEO.DCPP.TR.14.04 R0 App A-G Figures 08-06-14 ML14260A0332014-09-10010 September 2014 Central Coastal California Seismic Imaging Project (Cccsip) Chapter 2, GEO.DCPP.TR.12.01 R1 Figures 09-02-14 ML14260A0432014-09-10010 September 2014 Central Coastal California Seismic Imaging Project (Cccsip) Chapter 5, GEO.DCPP.TR.14.04 R0 App A-G Figures 08-06-14 ML13148A4202013-06-0606 June 2013 2/20/13 Summary of Public Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML12341A1232012-12-19019 December 2012 Summary of Meeting Via Teleconference with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML12200A1272012-08-0202 August 2012 Summary of Meeting with Pacific Gas and Electric Company to Discuss Digital Replacement of Process Protection System at Diablo Canyon Power Plant, Units 1 and 2 ML1214500142012-05-23023 May 2012 NFPA 805 LAR Status Matrix - May 2012 DCL-12-041, 2011 Annual Radiological Environmental Operating Report. Part 4 of 52012-04-16016 April 2012 2011 Annual Radiological Environmental Operating Report. Part 4 of 5 ML12125A3872012-04-16016 April 2012 2011 Annual Radiological Environmental Operating Report. Part 4 of 5 ML1117206342011-06-20020 June 2011 Draft Seismic Information Evaluation Flowchart ML1109101572011-03-31031 March 2011 Licensee Slides from 3/31/11 Meeting with Pacific Gas and Electric Company Change in Probabilistic Hazard ML1109101462011-03-31031 March 2011 Licensee Slides from 3/31/11 Meeting with Pacific Gas and Electric Company Deterministic Comparison DCL-11-023, Response to Summary of Telephone Conference Call Held on 02/28/2011, Between U.S. Nuclear Regulatory Commission & PG&E Co. Concerning Responses to Requests for Additional Info. for Renewal Application2011-03-25025 March 2011 Response to Summary of Telephone Conference Call Held on 02/28/2011, Between U.S. Nuclear Regulatory Commission & PG&E Co. Concerning Responses to Requests for Additional Info. for Renewal Application ML1019004182010-06-28028 June 2010 Quick View Chart ML1007104232010-03-12012 March 2010 Diesel Relay Setpoint Changes ML0835402612008-12-17017 December 2008 Shoreline Fault Characterization Schedule ML0906902942008-11-21021 November 2008 Meeting Slide, Spectra 6.5 Slide from Pacific Gas and Electric Regarding License Amendment Request Re AFW System and CST, Diablo Canyon Power Plant, Unit Nos. 1 and 2 ML11166A2072008-10-10010 October 2008 Water Supplier Table DCL-10-083, Water Supplier Table2008-10-10010 October 2008 Water Supplier Table DCL-08-021, Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule2008-03-12012 March 2008 Revision to the Unit 1 Reactor Vessel Material Surveillance Program Withdrawal Schedule ML0728203072007-10-11011 October 2007 Electronic Distribtion Initiative Letter, Licensee List, Electronic Distribution Input Information, Division Plant Mailing Lists DCL-06-080, PG&E Response to NRC Request for Additional Information Regarding, Special Report 06-01 - Results of Steam Generator (SG) Tube Inspections for Diablo Canyon, Unit 1 Thirteenth Refueling Outage2006-06-23023 June 2006 PG&E Response to NRC Request for Additional Information Regarding, Special Report 06-01 - Results of Steam Generator (SG) Tube Inspections for Diablo Canyon, Unit 1 Thirteenth Refueling Outage 2023-05-25 Category:Letter MONTHYEARML24260A1222024-09-14014 September 2024
[Table view]14 Sept 2024 Ltr - California Coastal Commission to Pg&E, Incomplete Consistency Certification for Requested Nuclear Regulatory Commission License Renewal for Diablo Canyon Power Plant DCL-24-087, License Renewal - Historic and Cultural Resources Reference Documents (Redacted)2024-09-12012 September 2024 License Renewal - Historic and Cultural Resources Reference Documents (Redacted) ML24262A2462024-09-11011 September 2024 10 CFR 2.206 - Diablo Canyon Units 1 and 2 Seismic - Petitioner Response to Acknowledgement Letter - DCL-24-083, CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated2024-09-0909 September 2024 CFR Part 21 Notification: Commercially Dedicated Snubber Valve Not Properly Heat Treated DCL-24-078, Pre-Notice of Disbursement from Decommissioning Trust2024-09-0303 September 2024 Pre-Notice of Disbursement from Decommissioning Trust DCL-24-082, Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment2024-08-28028 August 2024 Decommissioning Draft Biological Assessment and Draft Essential Fish Habitat Assessment ML24205A0662024-08-27027 August 2024 OEDO-24-00083 - 10 CFR 2.206 - Ack Letter - Diablo Canyon Units 1 and 2 Seismic Core Damage Frequency - IR 05000275/20243012024-08-26026 August 2024 NRC Examination Report 05000275/2024301; 05000323/2024301 IR 05000275/20240052024-08-22022 August 2024 Updated Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2 (Report 05000275/2024005 and 05000323/2024005) DCL-24-077, Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident2024-08-15015 August 2024 Responses to NRC Requests for Additional Information on Diablo Canyon Power License Renewal Application Severe Accident DCL-24-075, Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React2024-08-0808 August 2024 Response to Request for Additional Information for License Amendment Request 23-02, Application to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power React IR 05000275/20240022024-08-0606 August 2024 Integrated Inspection Report 05000275/2024002 and 05000323/2024002 DCL-24-070, License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies2024-07-31031 July 2024 License Amendment Request 24-03 Revision to Technical Specification 5.5.16 for Permanent Extension of Type a and Type C Leak Rate Test Frequencies DCL-24-071, Core Operating Limits Report for Unit 2 Cycle 252024-07-22022 July 2024 Core Operating Limits Report for Unit 2 Cycle 25 DCL-2024-523, Submittal of Report on Discharge Self-Monitoring2024-07-18018 July 2024 Submittal of Report on Discharge Self-Monitoring ML24187A1352024-07-16016 July 2024 Letter to Paula Gerfen - Diablo Canyon Units 1 and 2 - Summary of June 2024 Audit Related to the License Renewal Application Severe Accident Mitigation Alternatives Review IR 05000275/20240142024-07-11011 July 2024 Age-Related Degradation Inspection Report 05000275/2024014 and 05000323/2024014 IR 05000275/20244012024-07-0808 July 2024 Security Baseline Inspection Report 05000275/2024401 and 05000323/2024401 (Full Report) IR 05000323/20240112024-07-0303 July 2024 License Renewal Phase Report 05000323/2024011 DCL-2024-527, Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant2024-07-0101 July 2024 Sea Turtle Stranding Report (Loggerhead Sea Turtle) Diablo Canyon Power Plant DCL-24-066, Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL2024-06-27027 June 2024 Request to Extend the Nrg Approval of Alternative for Use of Full Structural Weld Overlay, REP-RHR-SWOL ML24155A2182024-06-18018 June 2024 OEDO-23-00350-NRR - (LTR-23-0228-1) - Closure Letter - 10 CFR 2.206 Petition from Mothers for Peace and Friends of the Earth Regarding Diablo Canyon ML24129A1762024-06-14014 June 2024 National Historic Preservation Act Section 106 Consultation – Results of Identification and Evaluation (Docket Number: 72-026) ML24200A2052024-06-0707 June 2024 Fws to NRC, List of Threatened and Endangered Species That May Occur in Your Proposed Project Location or May Be Affected by Your Proposed Project for Diablo Canyon License Renewal ML24099A2192024-05-29029 May 2024 Issuance of Amendment Nos. 245 and 247 Revision to TSs to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b ML24117A0132024-05-20020 May 2024 Letter to Paula Gerfen-Diablo Canyon Units 1 and 2-Regulatory Audit Regarding Severe Accident Mitigation Alternatives for the License Renewal Application DCL-24-054, LCO 3.0.3 Completion Time Limits2024-05-17017 May 2024 LCO 3.0.3 Completion Time Limits DCL-24-052, Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report2024-05-16016 May 2024 Responses to NRC Requests for Additional Information on the Diablo Canyon Power Plant License Renewal Application Environmental Report DCL-24-051, One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage2024-05-0808 May 2024 One Hundred Eighty Day Steam Generator Report for Twenty-Fourth Refueling Outage ML24127A2042024-05-0202 May 2024 02May2024 Ltr - California Coastal Commission to Pg&E, Coastal Development Permit Needed for Pg&E’S Proposed Relicensing of Diablo Canyon Nuclear Power Plant DCL-24-047, 2023 Annual Non-radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Non-radiological Environmental Operating Report DCL-24-049, 2023 Annual Radiological Environmental Operating Report2024-05-0101 May 2024 2023 Annual Radiological Environmental Operating Report L-24-004, Independent Spent Fuel Storage Installation - Responses to NRC Requests for Additional Information on the Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Application (Cac/Epid 001028/L-2022-RNW-0007)2024-04-30030 April 2024 Independent Spent Fuel Storage Installation - Responses to NRC Requests for Additional Information on the Diablo Canyon Independent Spent Fuel Storage Installation License Renewal Application (Cac/Epid 001028/L-2022-RNW-0007) DCL-24-048, O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 20232024-04-30030 April 2024 O CFR 50.59 and 1 O CFR 72.48 Summary Report for the Period of January 1, 2022, Through December 31, 2023 DCL-24-027, 2023 Annual Radioactive Effluent Release Report2024-04-28028 April 2024 2023 Annual Radioactive Effluent Release Report DCL-24-045, Annual Report of Occupational Radiation Exposure for 20232024-04-24024 April 2024 Annual Report of Occupational Radiation Exposure for 2023 IR 05000275/20240012024-04-23023 April 2024 Integrated Inspection Report 05000275/2024001 and 05000323/2024001 ML24114A2032024-04-22022 April 2024 Request for Information for EP Program and Performance Indicator Verification Inspection (Wolf Creek Nuclear Generating Station) Inspection Report 05000482/2024003 ML24106A2882024-04-18018 April 2024 License Renewal Application Environmental Review RCIs and RAIs ML24106A2892024-04-18018 April 2024 Letter to Paula Gerfen - Diablo Canyon Units 1 and 2 - Summary of March 2024 Audit Regarding the Environmental Review of the License Renewal Application DCL-24-042, Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations2024-04-17017 April 2024 Response to NRC Regulatory Issue Summary 2024-01, Preparation and Scheduling of Operator Licensing Examinations ML24108A1122024-04-15015 April 2024 License Amendment Request 24-02 Request for Approval of DCPP Early Warning System to Meet 10 CFR 73.55(i)(2) and 10 CFR 73.55(e)(9)(vi)(A) DCL-24-022, Notification of Changes to Decommissioning Schedule2024-04-0202 April 2024 Notification of Changes to Decommissioning Schedule DCL-24-023, Revised Certification of Permanent Cessation of Power Operations2024-04-0202 April 2024 Revised Certification of Permanent Cessation of Power Operations DCL-24-031, Decommissioning Funding Report2024-03-27027 March 2024 Decommissioning Funding Report DCL-24-032, 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant2024-03-27027 March 2024 2024 Annual Statement of Insurance for Pacific Gas and Electric Company’S Diablo Canyon Power Plant ML24082A2592024-03-25025 March 2024 Notice of Enforcement Discretion for Diablo Canyon Power Plant, Unit 2 (EPID L-2024-LLD-0002) - March 25, 2024 ML24081A0462024-03-22022 March 2024 Audit Summary in Support of the License Amendment Request to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b DCL-24-028, Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability2024-03-21021 March 2024 Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability ML24081A4052024-03-21021 March 2024 Request for Enforcement Discretion Regarding Compliance with Technical Specification 3.0.3, Limiting Condition for Operation Applicability 2024-09-09 |