ML21286A313
ML21286A313 | |
Person / Time | |
---|---|
Site: | Browns Ferry |
Issue date: | 10/04/2021 |
From: | Tennessee Valley Authority |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML21286A574 | List:
|
References | |
Download: ML21286A313 (1) | |
Similar Documents at Browns Ferry | |
---|---|
Category:Graphics incl Charts and Tables
MONTHYEARML21286A5422021-10-0404 October 2021
[Table view]Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.5, Analyses of Abnormal Operational Transients ML21286A3972021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.12, Process Radiation Monitoring Systems Characteristics ML21286A3422021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Table 4.9, Reactor Water Cleanup System Equipment Design Data ML21286A3592021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 6, Table 6.4, (Deleted by Amendment 13) ML21286A3762021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.1, Systems (or Portions of Systems) Required to Mitigate LOCA And/Or HELB ML21286A3732021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.2, Reactor Protection System Instrumentation Specifications ML21286A3682021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.3, Primary Containment Isolation ML21286A3892021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.7, Reactor Manual Control System Instrumentation ML21286A3952021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.6, Refueling Interlocks Effectiveness ML21286A5662021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.13-1, Results of BFN Atwsi Evaluation ML21286A5522021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Figure 14.5, Analyses of Abnormal Operational Transients ML21286A5502021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.4, Approach to Safety Analysis ML21286A5482021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.6, Iodine-131 Activity (Ci) by Location as Function of Time for CRDA ML21286A5432021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Table 13.5, Startup and Power Test Program ML21286A4042021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.13, Area Radiation Monitoring ML21286A5322021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Figure 14.6, Analysis of Design Basis Accidents ML21286A5282021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Figure 14.4, Approach to Safety Analysis ML21286A5162021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Table 10.17, Process Sampling Systems ML21286A4942021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Table 10.11, Power Block Structures ML21286A4602021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Table 10.4, Tools and Servicing Equipment ML21286A4572021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 12, Table 12.2, Reactor Building Concrete Structure Base Slab Design Data ML21286A4522021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 12, Table 12.3, Plant Radiation Zone Classification ML21286A4272021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Table 8.4, Normal Auxiliary Power ML21286A4242021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Table 8.6, 250-V DC Power Supply ML21286A4232021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.20, Design Output Documents ML21286A4142021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Table 8.5, Standby AC Power Supply ML21286A4092021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.16, Process Computer System ML21286A2772021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 2, Table 2.3, Meteorology ML21286A2232021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Appendix G, State B ML21286A2222021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Appendix G - BWR Operating States ML21286A2262021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Appendix G, State D ML21286A2272021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Appendix G, State a ML21286A2622021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 1, Table 1.11, Id Resolution of Construction Permit Concern - Summary ML21286A2522021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 1, Table 1.4-1, Class of BWR Systems Criteria Requirements for Safety Evaluation ML21286A2662021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 2, Table 2.5, Sheets 1-3, Historical Earthquake Listing 200 Mile Radius Around 87.11 W Lon 34/71 N Lat ML21286A3172021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Table 4.3, Reactor Recirculation System ML21286A2002021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Appendix a, AEC General Design Criteria - Group 1 (Overall Plant Requirements) ML21286A2722021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 1, Table 1.7, Comparison of Nuclear System Design Characteristics ML21286A3482021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 6, Table 6.5, Plant Parameters Used Locaa Analysis ML21286A3542021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 6, Table 6.3, Emergency Core Cooling Systems Equipment Design Data Summary ML21286A3672021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.5, Neutron Monitoring System, SRM Trips ML21286A3962021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.8, Reactor Vessel Instrumentation ML21286A3122021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 3, Table 3.2-1, Deleted by Amendment No. 16 ML21286A3132021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 3, Table 3.3, Reactor Vessel Internals, Mechanical Design Data ML21286A2962021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Table 4.2, Reactor Pressure Vessel Materials ML21286A2822021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 2, Table 2.4A, Maximum Possible Flood ML21286A2842021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 2, Table, 2.4, Deleted ML21286A3112021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Table 4.4, Nuclear Steam Pressure Relief System ML21286A3242021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 3, Table 3.6, Definition of Fuel Design Limits ML21286A3432021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 4, Table 4.8, Residual Heat Removal System Equipment Design Data 2021-10-04 Category:Updated Final Safety Analysis Report (UFSAR) MONTHYEARML23335A0672023-10-31031 October 2023
[Table view]Updated Final Safety Analysis Report (Fsar), Amendment 30, Public Use Redacted ML23278A0122023-10-0505 October 2023 Updated Final Safety Analysis Report, Amendment 30 ML22049B3242021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Appendix N, Unit 1 Cycle 14 Reload Analysis (July 2020) - Redacted ML21286A5542021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.2, Unacceptable Safety Results for Abnormal Operational Transients ML21286A5582021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section, 14.12 Analysis of the Primary Containment Response ML21286A5402021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.3, Training Programs ML21286A5442021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.4, Preoperational Test Program ML21286A5362021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Table of Contents ML21286A5312021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.9, Refueling Operations ML21286A5502021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.4, Approach to Safety Analysis ML21286A5372021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.8, Analytical Methods ML21286A5482021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.6, Iodine-131 Activity (Ci) by Location as Function of Time for CRDA ML21286A5262021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Figure 13.2, Organization and Responsibility ML21286A5242021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Section 10.20, Auxiliary Boiler System ML21286A5292021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.5, Startup and Power Test Program ML21286A5522021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Figure 14.5, Analyses of Abnormal Operational Transients ML21286A5352021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.8, Analytical Methods, ML21286A5332021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.2, Organization and Responsibility ML21286A5462021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.6, Analysis of Design Basis Accidents ML21286A5672021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.11-1 Through Table 14.11-9 (Deleted) ML21286A5692021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.11 Analyses of Design Basis Accidents (Deleted) ML22049B3192021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Appendix 2.4A, Probable Maximum Flood (PMF) - Redacted ML21286A5652021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Plant Safety Analysis, Table of Contents ML21286A5602021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Figures 14.10-1 Through 14.10-20 Deleted by Amendment 28 ML21286A5622021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Figure 14.8, Fuel Rod and Fuel Bundle Details ML21286A5662021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.13-1, Results of BFN Atwsi Evaluation ML22049B3212021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.6, Instrument and Controls DC and AC Power System - Redacted ML21286A5592021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.9, Deleted ML21286A5552021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.5, Analyses of Abnormal Operational Transients ML21286A5472021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.4, Approach to Safety Analysis ML22049B3222021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Section 10.12, Heating, Ventilation, and Air Conditioning Systems - Redacted ML21286A5302021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Figure 13.5, Startup and Power Test Program ML21286A5382021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.10, Refueling Test Program ML22047A1602021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.2, Site Description - Redacted ML21286A5562021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Figure 13.6, Normal Operations ML21286A5392021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.6, Normal Operations ML21286A5222021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Section 10.25, Emergency High Pressure Makeup (Ehpm) System ML21286A5232021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Section 10.18, Plant Communications System ML21286A5492021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.1, Analytical Objective ML21286A5642021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.10, Deleted ML21286A5682021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.13, Anticipated Transients Without Scram with Instability (Atwsi) ML21286A5532021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Figure 13.4, Typical Preoperational Test Sequence ML21286A5452021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.8, Operational Review and Audits ML21286A5322021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Figure 14.6, Analysis of Design Basis Accidents ML21286A5422021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.5, Analyses of Abnormal Operational Transients ML21286A5432021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Table 13.5, Startup and Power Test Program ML21286A5342021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.3, Unacceptable Safety Results for Accidents ML21286A5512021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.7, Records (Deleted) ML21286A5272021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations, Section 13.1, Organizational Structure of the Conduct of Operations ML21286A5282021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Figure 14.4, Approach to Safety Analysis 2023-10-05 |
Text
BFN-28 Table 3.3-1 REACTOR VESSEL INTERNALS, DESIGN DATA Core Shroud Jet Pumps Upper Portion,o.d.,in.
220 Number 20 Central Portion,o.d.,in.
207 Throat Diameter, in.
8.18 Lower Portion,o.d.,in.
201 Weight, lb.
22,700 Central Portion, thickness, in.
2 Original Steam Dryers Weight, lb.
116,900 Weight, lb 90,000 Shroud Head-Steam Separator Assembly Replacement Steam Dryers Head Thickness, in.
2.0 Weight, lb.
119,000 Number of Separators 211 Feedwater Sparger Separator o, d., in.
12.75 Dimensions, in.
6 Sched. 40 Number 6
Cross Section Area, ft2 0.2006 Standpipe i. d., in.
6.065 Number 6
Standpipe o, d., in.
6.625 Core Spray Sparger Rings Weight, lb.
139,600 Diameter, in.
4 Sched. 40 S Core Support Cross Section Area, ft2 0.088 Weight, lb.
20,500 Number of Spray Outlets 260 Top Guide Weight, lb.
4,317 Weight, lb.
15,200 Vessel Head Cooling Spray Nozzle Fuel Support Pieces Pipe Size, in.
4 Number of Preipheral 24 Scheduled 40 Four Lobe Differential Pressure & Liquid Control Line Number without Plugs 185 Inner Pipe (Liquid Control), in 1 Sched. 40 Number with Plugs 0
Outer Pipe, in.
2 Sched. 40 Weight, lb.
11,300 Incore Flux Monitor Guide Tubes Control Rod Guide Tubes Number 55 Number 185 Weight, lb.
46,250 Surveillance Sample Holders 3
Total Weight of Reactor Vessel Internals, pounds (excluding fuel) 477,000