ML21286A452
Jump to navigation
Jump to search
| ML21286A452 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 10/04/2021 |
| From: | Tennessee Valley Authority |
| To: | Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML21286A574 | List:
|
| References | |
| Download: ML21286A452 (1) | |
Text
BFN-17 Table 12.3-1 PLANT RADIATION ZONE CLASSIFICATIONS Shielding Access Access Design Dose Rate Action Requirements Zone Conditions Occupancy Dose Rate Range to Enter Zone 1
Unlimited Continuous
<1.0 mRem/hr 2a Regulated Continuous 1.0 mRem/hr 2b Regulated Periodic 15 mRem/hr 3
Controlled Unoccupied 50-1,000 mRem/hr 4
Prohibited Unoccupied
>1,000 mRem/hr Access Dose Rate Range will meet 10 CFR 20 requirements as given in plant procedures.
Action Requirements to Enter Zone are given in plant procedures.