ML22047A160
From kanterella
Jump to navigation
Jump to search
ML22047A160 | |
Person / Time | |
---|---|
Site: | Browns Ferry |
Issue date: | 10/04/2021 |
From: | Tennessee Valley Authority |
To: | Office of Nuclear Reactor Regulation |
Shared Package | |
ML21286A574 | List:
|
References | |
Download: ML22047A160 (1) | |
Similar Documents at Browns Ferry | |
---|---|
Category:Updated Final Safety Analysis Report (UFSAR)
MONTHYEARML23335A0672023-10-31031 October 2023
[Table view]Updated Final Safety Analysis Report (Fsar), Amendment 30, Public Use Redacted ML23278A0122023-10-0505 October 2023 Updated Final Safety Analysis Report, Amendment 30 ML22049B3242021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Appendix N, Unit 1 Cycle 14 Reload Analysis (July 2020) - Redacted ML21286A5542021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.2, Unacceptable Safety Results for Abnormal Operational Transients ML21286A5582021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section, 14.12 Analysis of the Primary Containment Response ML21286A5402021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.3, Training Programs ML21286A5442021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.4, Preoperational Test Program ML21286A5362021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Table of Contents ML21286A5312021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.9, Refueling Operations ML21286A5502021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.4, Approach to Safety Analysis ML21286A5372021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.8, Analytical Methods ML21286A5482021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.6, Iodine-131 Activity (Ci) by Location as Function of Time for CRDA ML21286A5262021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Figure 13.2, Organization and Responsibility ML21286A5242021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Section 10.20, Auxiliary Boiler System ML21286A5292021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.5, Startup and Power Test Program ML21286A5522021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Figure 14.5, Analyses of Abnormal Operational Transients ML21286A5352021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.8, Analytical Methods, ML21286A5332021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.2, Organization and Responsibility ML21286A5462021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.6, Analysis of Design Basis Accidents ML21286A5672021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.11-1 Through Table 14.11-9 (Deleted) ML21286A5692021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.11 Analyses of Design Basis Accidents (Deleted) ML22049B3192021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Appendix 2.4A, Probable Maximum Flood (PMF) - Redacted ML21286A5652021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Plant Safety Analysis, Table of Contents ML21286A5602021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Figures 14.10-1 Through 14.10-20 Deleted by Amendment 28 ML21286A5622021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Figure 14.8, Fuel Rod and Fuel Bundle Details ML21286A5662021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.13-1, Results of BFN Atwsi Evaluation ML22049B3212021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 8, Figure 8.6, Instrument and Controls DC and AC Power System - Redacted ML21286A5592021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.9, Deleted ML21286A5552021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.5, Analyses of Abnormal Operational Transients ML21286A5472021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.4, Approach to Safety Analysis ML22049B3222021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Section 10.12, Heating, Ventilation, and Air Conditioning Systems - Redacted ML21286A5302021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Figure 13.5, Startup and Power Test Program ML21286A5382021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.10, Refueling Test Program ML22047A1602021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 2, Figure 2.2, Site Description - Redacted ML21286A5562021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Figure 13.6, Normal Operations ML21286A5392021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.6, Normal Operations ML21286A5222021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Section 10.25, Emergency High Pressure Makeup (Ehpm) System ML21286A5232021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 10, Section 10.18, Plant Communications System ML21286A5492021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.1, Analytical Objective ML21286A5642021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.10, Deleted ML21286A5682021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.13, Anticipated Transients Without Scram with Instability (Atwsi) ML21286A5532021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Figure 13.4, Typical Preoperational Test Sequence ML21286A5452021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.8, Operational Review and Audits ML21286A5322021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Figure 14.6, Analysis of Design Basis Accidents ML21286A5422021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Table 14.5, Analyses of Abnormal Operational Transients ML21286A5432021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Table 13.5, Startup and Power Test Program ML21286A5342021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Section 14.3, Unacceptable Safety Results for Accidents ML21286A5512021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Section 13.7, Records (Deleted) ML21286A5272021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations, Section 13.1, Organizational Structure of the Conduct of Operations ML21286A5282021-10-0404 October 2021 Amendment 29 to Updated Final Safety Analysis Report, Chapter 14, Figure 14.4, Approach to Safety Analysis 2023-10-05 |
Text
Security-Related Information -- Withheld Under 1 O CFR 2.390
Retrieved from "https://kanterella.com/w/index.php?title=ML22047A160&oldid=3801213"