Amendment 29 to Updated Final Safety Analysis Report, Chapter 7, Table 7.13, Area Radiation Monitoring
ML21286A404
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 10/04/2021
From:
Tennessee Valley Authority
To:
Office of Nuclear Reactor Regulation
Shared Package
ML21286A574 List: ... further results
References
Download: ML21286A404 (8)


Text

BFN-18

Table 7.13-1

(Deleted by Amendment 13)

BFN-18

Table 7.13-2

LOCATIONS OF AREA RADIATION MONITORS

Unit 1

Sheet 1

CHANNEL SENSOR AND CONVERTER LOCATION DETECTOR

Floor Approx TVA Station Range Elevation Col Inst No. MR/HR Feet No. Description Number

1 0.1 1000 664.0 px-R5 Fuel Storage Pool Area - RE-90-1 Reactor Building

2 0.1 1000 664.0 ux-R3 Service Floor Area - RE-90-2 Reactor Building

3 0.1 1000 639.0 p-R5 New Fuel Storage - Reactor RE-90-3 Building

4 0.1 1000 639.0 s-R5 Recirculating Pump MG Set Area - RE-90-4 Reactor Building

5 0.1 1000 617.0 d-T4 Generator Operating Floor - RE-90-5 Turbine Building

6 0.1 1000 617.0 e-T6 RFP Operating Floor - RE-90-6 Turbine Building

7 0.1 1000 617.0 k-T3 Turbine Operating Floor - RE-90-7 Turbine Building

8 0.1 1000 617.0 p-R7 Main Control Room RE-90-8

9 0.1 1000 621.25 t-R6 Cleanup System Area - RE-90-9 Reactor Building

10 Not Used

11 0.1 1000 586.0 b-T6 SJAE and SPE Area - RE-90-11 Turbine Building

12 0.1 1000 586.0 d-T6 Feedwater Heater Area - RE-90-12 Turbine Building

13 0.1 1000 593.0 p-R6 North Cleanup System Area - RE-90-13 Reactor Building

14 0.1 1000 593.0 s-R6 South Cleanup System Area - RE-90-14 Reactor Building

15 0.1 1000 577.75 b-T2 Decontamination Room - RE-90-15 Turbine Building

16 0.1 1000 557.0 c-T4 Hotwell Pump Area - RE-90-16 Turbine Building

BFN-18

Table 7.13-2 (Continued)

LOCATIONS OF AREA RADIATION MONITORS

Unit 1 (Continued)

Sheet 2

CHANNEL SENSOR AND CONVERTER LOCATION DETECTOR

Floor Approx TVA Station Range Elevation Col Inst No. MR/HR Feet No. Description Number

17 0.1 1000 557.0 f-T4 Condenser Corridor - RE-90-17 Turbine Building

18 0.1 1000 557.0 f-T6 Condensate Demineralizer Area - RE-90-18 Turbine Building

19 0.1 1000 565.0 j-T3 Outside Steam Line Cavity - RE-90-19 Turbine Building

20 0.1 1000 565.0 r-R2 CRD-HCU West Area - RE-90-20 Reactor Building

21 0.1 1000 565.0 r-R6 CRD-HCU East Area - RE-90-21 Reactor Building

22 0 106 565.0 p-R5 TIP Room - Reactor Building RE-90-22

23 0.1 1000 565.0 p-R5 TIP Drive Area - Reactor RE-90-23 Building

24 0.1 1000 519.0 u-R1 HPCI Room - Reactor Building RE-90-24

25 0.1 1000 519.0 u-R1 RHR West Room - Reactor Building RE-90-25

26 0.1 1000 519.0 n-R1 Core Spray - RCIC Room - RE-90-26 Reactor Building

27 0.1 1000 519.0 n-R7 Core Spray Room - Reactor RE-90-27 Building

28 0.1 1000 519.0 u-R7 RHR East Room - Reactor Building RE-90-28

29 0.1 1000 519.0 u-R7 Pressure Suppression Pool Area RE-90-29 Reactor Building

32 0.1 1000 568.0 - Stack Room RE-90-32

BFN-18

Table 7.13-2 (Continued)

LOCATIONS OF AREA RADIATION MONITORS

Unit 2

Sheet 3

CHANNEL SENSOR AND CONVERTER LOCATION DETECTOR

Floor Approx TVA Station Range Elevation Col Inst No. MR/HR Feet No. Description Number

1 0.1 1000 664.0 px-R11 Fuel Storage Pool Area - Reactor RE-90-1 Building

2 0.1 1000 664.0 ux-R10 Service Floor Area - Reactor RE-90-2 Building

3 0.1 1000 639.0 p-R10 New Fuel Storage - Reactor RE-90-3 Building

4 0.1 1000 639.0 s-R10 Recirculating Pump M-G Set Area - RE-90-4 Reactor Building

5 0.1 1000 617.0 d-T8 Generator Operating Floor - RE-90-5 Turbine Building

6 0.1 1000 617.0 e-T6 RFP Operating Floor - Turbine RE-90-6 Building

7 0.1 1000 617.0 k-T9 Turbine Operating Floor - Turbine RE-90-7 Building

8 Not Used

9 0.1 1000 621.25 t-R9 Cleanup System Area - Reactor RE-90-9 Building

10 0.1 1000 586.0 j-T6 Feedwater Heater Area - Turbine RE-90-10 Building 11 Not Used

12 Not Used

13 0.1 1000 593.0 p-R9 North Cleanup System Area - RE-90-13 Reactor Building

14 0.1 1000 593.0 s-R9 South Cleanup System Area - RE-90-14 Reactor Building 15 Not Used

16 0.1 1000 557.0 c-T8 Hotwell Pump Area - Turbine RE-90-16 Building

17 0.1 1000 557.0 f-T8 Condenser Corridor - Turbine RE-90-17 Building 18 Not used

19 0.1 1000 565.0 j-T9 Outside Steam Line Cavity - RE-90-19 Turbine Building BFN-18

Table 7.13-2 (Continued)

LOCATIONS OF AREA RADIATION MONITORS

Unit 2 (Continued)

Sheet 4

CHANNEL SENSOR AND CONVERTER LOCATION DETECTOR

Floor Approx TVA Station Range Elevation Col Inst No. MR/HR Feet No. Description Number

20 0.1 1000 565.0 r-R9 CRD-HCU West Area - Reactor RE-90-20 Building

21 0.1 1000 565.0 r-R13 CRD-HCU East Area - Reactor RE-90-21 Building

22 10 106 565.0 p-R12 TIP Room - Reactor Building RE-90-22

23 0.1 1000 565.0 p-R12 TIP Drive Area - Reactor Building RE-90-23

24 0.1 1000 519.0 u-R14 HPCI Room - Reactor Building RE-90-24

25 0.1 1000 519.0 u-R8 RHR West Room - Reactor RE-90-25 Building

26 0.1 1000 519.0 n-R8 Core Spray - RCIC Room - RE-90-26 Reactor Building

27 0.1 1000 519.0 n-R14 Core Spray Room - Reactor RE-90-27 Building

28 0.1 1000 519.0 u-R14 RHR East Room - Reactor RE-90-28 Building

29 0.1 1000 519.0 u-R14 Pressure Suppression Pool Area RE-90-29 Reactor Building

30 0.1 1000 664.0 p-R12 Fuel Storage Pool Area - RE-90-30 Reactor Building

31 0.1 1000 557.0 c-T6 Raw Cooling Water Pumps Area - RE-90-31 Turbine Building

BFN-18

Table 7.13-2 (Continued)

LOCATIONS OF AREA RADIATION MONITORS

Unit 3

Sheet 5

CHANNEL SENSOR AND CONVERTED LOCATION DETECTOR

Floor Approx TVA Station Range Elevation Col Inst No. MR/HR Feet No. Description Number

1 0.1 1000 664.0 px-R19 Fuel Storage Pool Area - Reactor RE-90-1 Building

2 0.1 1000 664.0 ux-R17 Service Floor Area - Reactor RE-90-2 Building

3 0.1 1000 639.0 p-R17 New Fuel Storage - Reactor RE-90-3 Building

4 0.1 1000 639.0 s-R17 Recirculating Pump M-G Set Area - RE-90-4 Reactor Building

5 0.1 1000 617.0 d-T14 Generator Operating Floor - RE-90-5 Turbine Building

6 0.1 1000 617.0 e-T12 RFP Operating Floor - Turbine RE-90-6 Turbine

7 0.1 1000 617.0 k-T15 Turbine Operating Floor - Turbine RE-90-7 Building

8 0.1 1000 617.0 p-R16 Main Control Room - RE-90-8

9 0.1 1000 621.25 t-R16 Cleanup System Area - Reactor RE-90-9 Building

10 0.1 1000 586.0 j-T12 Feedwater Heater Area - Turbine RE-90-10 Building

11 0.1 1000 586.0 b-T12 SJAE and SPE Area - Turbine RE-90-11 Building

12 0.1 1000 586.0 d-T12 Feedwater Heater Area - Turbine RE-90-12 Building

13 0.1 1000 593.0 p-R16 North Cleanup System Area - RE-90-13 Reactor Building

14 0.1 1000 593.0 s-R16 South Cleanup System Area - RE-90-14 Reactor Building

15 Not used

16 0.1 1000 557.0 c-T14 Hotwell Pump Area - Turbine RE-90-16 Building

17 0.1 1000 557.0 f-T14 Condenser Corridor - Turbine RE-90-17 Building BFN-18

Table 7.13-2 (Continued)

LOCATIONS OF AREA RADIATION MONITORS

Unit 3 (Continued)

Sheet 6

CHANNEL SENSOR AND CONVERTER LOCATION DETECTOR

Floor Approx TVA Station Range Elevation Col Inst No. MR/HR Feet No. Description Number

18 0.1 1000 557.0 f-T12 Condensate Demineralizer Area - RE-90-18 Turbine Building

19 0.1 1000 565.0 j-T15 Outside Steam Line Cavity - RE-90-19 Turbine Building

20 0.1 1000 565.0 r-R16 CRD-HCU West Area - Reactor RE-90-20 Building

21 0.1 1000 565.0 r-R20 CRD-HCU East Area - Reactor RE-90-21 Building

22 10 106 565.0 p-R19 TIP Room - Reactor Building RE-90-22

23 0.1 1000 565.0 p-R19 TIP Drive Area - Reactor Building RE-90-23

24 0.1 1000 519.0 u-R21 HPCI Room - Reactor Building RE-90-24

25 0.1 1000 519.0 u-R15 RHR West Room - Reactor RE-90-25 Building

26 0.1 1000 519.0 n-R15 Core Spray - RCIC Room - RE-90-26 Reactor Building

27 0.1 1000 519.0 n-R21 Core Spray Room - Reactor RE-90-27 Building

28 0.1 1000 519.0 u-R21 RHR East Room - Reactor RE-90-28 Building

29 0.1 1000 519.0 u-R21 Pressure Suppression Pool Area - RE-90-29 Reactor Building

31 0.1 1000 557.0 c-T13 Raw Cooling Water Pumps - RE-90-31 Turbine Building

BFN-18

Table 7.13-2 (Continued)

LOCATIONS OF AREA RADIATION MONITORS

Radwaste Building

Sheet 7

CHANNEL SENSOR AND CONVERTER LOCATION DETECTOR

Floor Approx TVA Station Range Elevation Col Inst No. MR/HR Feet No. Description Number

1 0.1 1000 546.0 wb-W6 Laundry Drain Tank RE-90-35

2 0.1 1000 546.0 wb-W3 Equipment Drain Sump Area RE-90-36

3 0.1 1000 565.0 wc-W6 Radwaste Control Room RE-90-37

4 0.1 1000 565.0 wa-W3 Access Corridor RE-90-38

5 0.1 1000 565.0 wc-W1 Waste Packaging Area RE-90-39

6 0.1 1000 578.0 wf-W3 Waste Sample Tank Area RE-90-40

7 0.1 1000 578.0 wb-W3 F.D. Sample Tank Area RE-90-41

8 0.1 1000 565.0 West Wall Radwaste Evaporator Building RE-90-42

NOTE: Indicators and trip units located on radwaste control panel. Annunciation on main control room panel.