BFN-23 TABLE 4.9-1 REACTOR WATER CLEANUP SYSTEM EQUIPMENT DESIGN DATA MAIN CLEANUP RECIRCULATION PUMPS Number Required:.............................. 2 Design Temperature (°F):................... 150 Capacity (each):............................. 50%
Design Pressure (psig):..................... 1300 Discharge Flow (gpm/pump):.......... 180 Discharge Head at Rated Flow (ft):..... 500 HEAT EXCHANGERS Regenerative Nonregenerative Reactor Coolant Flow Rate (lb/hr) 133,000/187,530*
133,000/187,530*
Shell Side Pressure (psig) 1,450 150 Shell Side Temperature (°F) 575 370 Tube Side Pressure (psig) 1,450 1,450 Tube Side Temperature (°F) 575 575 FILTER-DEMINERALIZERS Number Required:.................................... 2 Design Temperature (°F):.......... 150 Capacity (each):.................................. 50%
Design Pressure (psig):........... 1450 Flow Rate/Unit (lb/hr):........ 66,650/93,765*
Effluent Conductivity (mmho max):........ 0.1 Effluent pH:.................................. 6.5 to 7.5 Effluent Insolubles (ppb-measured as residue on 0.45 micron filter paper):.................................................. <10