MONTHYEARML24170A7652024-06-19019 June 2024 Confirmation of Initial License Examination ML23325A0502023-11-13013 November 2023 Form 2.1-1, Examination Preparation Checklist (Byron 2023) ML23339A0182023-11-13013 November 2023 Form 1.3-1, Examination Security Agreement (Byron Ile 2023) ML23339A0232023-11-13013 November 2023 Form 5.1-1 Post Examination Check Sheet (Byron 2023) ML23325A0492023-11-0909 November 2023 Letter 2023-0062 - Post Exam Submittal ML23278A0272023-10-0505 October 2023 Operator Licensing Examination Approval - Byron Station, October 2023 ML23325A0262023-10-0404 October 2023 Form 2.3-2 Operating Test Quality Checklist (Byron 2023 Ile) ML23325A0302023-10-0404 October 2023 Form 2.3-4 Written Examination Quality Checklist (Byron 2023 Ile) ML23325A0252023-08-0909 August 2023 0041 NRC ML23325A0232023-08-0202 August 2023 Submittal of Integrated Initial License Training Examination Materials RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23325A0102023-05-31031 May 2023 Form 2.3-1 Examination Outline Quality Checklist (Byron 2023 Ile) ML23325A0112023-05-31031 May 2023 Form 3.4-1 Events and Evolutions Checklist (Byron 2023 Ile) ML23150A1712023-05-30030 May 2023 Form 5.1-1 Post Exam Check Sheet BYRON 2023-0026, Ile Oct 2023 Exam Outline Ltr2023-05-18018 May 2023 Ile Oct 2023 Exam Outline Ltr ML23065A2952023-03-10010 March 2023 Confirmation of Initial License Examination IR 05000454/20223012023-03-0707 March 2023 NRC Initial License Examination Report 05000454/2022301 and 05000455/2022301 ML23146A0482023-02-27027 February 2023 Form 2.3-4 Written Examination Quality Checklist ML23150A1702023-02-27027 February 2023 Form 2.1-1 Exam Prep Checklist Byron 2022 ML23145A2352023-02-27027 February 2023 Form 1.3-1 Exam Security Agreement - Signed Off ML23146A0462023-02-27027 February 2023 Form 2.3-2 Operating Test Quality Checklist ML23145A2282023-01-0606 January 2023 Letter 2023-0001 Post Exam Package ML22343A2172022-12-12012 December 2022 Operator Licensing Examination Approval - Byron Station, December 2022 ML23150A1572022-12-0808 December 2022 Form 3.4-1 Combined ML23150A1432022-12-0808 December 2022 Form 2.3-1 Exam Outline Quality Checklist BYRON 2022-0064, Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed)2022-09-28028 September 2022 Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed) ML22102A1232022-04-19019 April 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000454/20213012021-12-17017 December 2021 NRC Initial License Examination Report 05000454/2021301; 05000455/2021301 ML21361A1732021-10-28028 October 2021 Proposed Sim JPM BYRON 2021-0033, Submittal on Initial Operator Licensing Examination Outline2021-10-28028 October 2021 Submittal on Initial Operator Licensing Examination Outline ML21361A1692021-10-28028 October 2021 Proposed Scenarios ML21361A1162021-10-28028 October 2021 ES-301-3 ML21356B7332021-10-28028 October 2021 ES-403-1 ML21361A1592021-10-28028 October 2021 Proposed RO Admin JPM ML21361A1242021-10-28028 October 2021 ES-301-4 ML21361A1262021-10-28028 October 2021 ES-301-6 ML21361A1572021-10-28028 October 2021 Proposed in Plant JPM ML21361A1072021-10-28028 October 2021 2021-301 Byron NRC Exam Submittal Letter ML21361A0292021-10-28028 October 2021 Pre Exam ES-201-3 ML21356B7242021-10-28028 October 2021 Ile Outline Review Comments Response ML21361A2732021-10-28028 October 2021 ES-201-2 BYRON 2021-0072, Post Exam Submittal Letter2021-10-28028 October 2021 Post Exam Submittal Letter ML21361A2712021-10-28028 October 2021 ES-201-2 Written Outline ML21361A1782021-10-28028 October 2021 Proposed Written Exam ML21361A0212021-10-28028 October 2021 Post Exam ES-201-3 ML21361A3312021-10-28028 October 2021 SRO Admin JPM ML21361A2752021-10-28028 October 2021 ES-301-5 ML21361A3252021-10-28028 October 2021 Scenarios ML21361A3322021-10-28028 October 2021 Written Exam 2024-06-19
[Table view] Category:Part 55 Examination Related Material
MONTHYEARML24170A7652024-06-19019 June 2024 Confirmation of Initial License Examination ML23339A0182023-11-13013 November 2023 Form 1.3-1, Examination Security Agreement (Byron Ile 2023) ML23339A0232023-11-13013 November 2023 Form 5.1-1 Post Examination Check Sheet (Byron 2023) ML23325A0502023-11-13013 November 2023 Form 2.1-1, Examination Preparation Checklist (Byron 2023) ML23325A0492023-11-0909 November 2023 Letter 2023-0062 - Post Exam Submittal ML23278A0272023-10-0505 October 2023 Operator Licensing Examination Approval - Byron Station, October 2023 ML23325A0262023-10-0404 October 2023 Form 2.3-2 Operating Test Quality Checklist (Byron 2023 Ile) ML23325A0302023-10-0404 October 2023 Form 2.3-4 Written Examination Quality Checklist (Byron 2023 Ile) ML23325A0252023-08-0909 August 2023 0041 NRC ML23325A0232023-08-0202 August 2023 Submittal of Integrated Initial License Training Examination Materials RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations ML23325A0102023-05-31031 May 2023 Form 2.3-1 Examination Outline Quality Checklist (Byron 2023 Ile) ML23325A0112023-05-31031 May 2023 Form 3.4-1 Events and Evolutions Checklist (Byron 2023 Ile) ML23150A1712023-05-30030 May 2023 Form 5.1-1 Post Exam Check Sheet BYRON 2023-0026, Ile Oct 2023 Exam Outline Ltr2023-05-18018 May 2023 Ile Oct 2023 Exam Outline Ltr ML23065A2952023-03-10010 March 2023 Confirmation of Initial License Examination IR 05000454/20223012023-03-0707 March 2023 NRC Initial License Examination Report 05000454/2022301 and 05000455/2022301 ML23146A0482023-02-27027 February 2023 Form 2.3-4 Written Examination Quality Checklist ML23150A1702023-02-27027 February 2023 Form 2.1-1 Exam Prep Checklist Byron 2022 ML23146A0462023-02-27027 February 2023 Form 2.3-2 Operating Test Quality Checklist ML23145A2352023-02-27027 February 2023 Form 1.3-1 Exam Security Agreement - Signed Off ML23145A2282023-01-0606 January 2023 Letter 2023-0001 Post Exam Package ML22343A2172022-12-12012 December 2022 Operator Licensing Examination Approval - Byron Station, December 2022 ML23150A1572022-12-0808 December 2022 Form 3.4-1 Combined ML23150A1432022-12-0808 December 2022 Form 2.3-1 Exam Outline Quality Checklist BYRON 2022-0064, Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed)2022-09-28028 September 2022 Letter 2022-0064 Submittal of Byron Integrated Initial License Training Examination Materials(Signed) ML22102A1232022-04-19019 April 2022 Confirmation of Initial License Examination RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations IR 05000454/20213012021-12-17017 December 2021 NRC Initial License Examination Report 05000454/2021301; 05000455/2021301 ML21361A1072021-10-28028 October 2021 2021-301 Byron NRC Exam Submittal Letter BYRON 2021-0072, Post Exam Submittal Letter2021-10-28028 October 2021 Post Exam Submittal Letter ML21361A3322021-10-28028 October 2021 Written Exam ML21361A1782021-10-28028 October 2021 Proposed Written Exam ML21356B7332021-10-28028 October 2021 ES-403-1 ML21361A1572021-10-28028 October 2021 Proposed in Plant JPM ML21361A1772021-10-28028 October 2021 Proposed SRO Admin JPM ML21361A1262021-10-28028 October 2021 ES-301-6 ML21356B7322021-10-28028 October 2021 ES-201-1 ML21361A0292021-10-28028 October 2021 Pre Exam ES-201-3 ML21361A1692021-10-28028 October 2021 Proposed Scenarios ML21361A1592021-10-28028 October 2021 Proposed RO Admin JPM ML21356B7242021-10-28028 October 2021 Ile Outline Review Comments Response ML21361A3292021-10-28028 October 2021 Sim Job Performance Measure ML21361A2712021-10-28028 October 2021 ES-201-2 Written Outline ML21361A0212021-10-28028 October 2021 Post Exam ES-201-3 ML21361A3312021-10-28028 October 2021 SRO Admin JPM ML21361A1162021-10-28028 October 2021 ES-301-3 BYRON 2021-0033, Submittal on Initial Operator Licensing Examination Outline2021-10-28028 October 2021 Submittal on Initial Operator Licensing Examination Outline ML21361A2452021-10-28028 October 2021 ES-301-1 ML21361A1352021-10-28028 October 2021 ES-401-6 2024-06-19
[Table view] |
Text
ES-201 Examination Outline Quality Checklist Form ES-201-2 NOTE: This ES-201-2 is for the NRC developed Written Examination Outline sent to the Facility ONLY Facility: Byron Nuclear Station Date of Examination: September 20 21
Item Task Description Initials a b* c#
- 1. a. Verify that the outline(s) fit(s) the appropriate model in accordance with ES-401. BB N/A GMR
W b. Assess whether the outline was systematically and randomly prepared in accordance with BB N/A GMR R Section D.1 of ES-401 or ES-401N and whether all K/A categories are appropriately sampled.
I T c. Assess whether the outline overemphasizes any systems, evolutions, or generic topics. BB N/A GMR T
E d. Assess whether the justifications for deselected or rejected K/A statements are appropriate. BB N/A GMR N
- 2. a. Using Form ES-301-5, verify that the proposed scenario sets cover the required number of normal evolutions, instrument and component failures, technical specifications, and major S transients.
I b. Assess whether there are enough scenario sets (and spares) to test the projected number and M mix of applicants in accordance with the expected crew composition and rotation schedule U without compromising exam integrity, and ensure that each applicant can be tested using at L least one new or significantly modified scenario, that no scenarios are duplicated from the A applicants audit test(s), and that scenarios will not be repeated on subsequent days.
T O c. To the extent possible, assess whether the outline(s) conforms with the qualitative and R quantitative criteria specified on Form ES-301-4 and described in Appendix D and in Section D.5, Specific Instructions for the Simulator Operating Test, of ES-301 (including overlap).
- 3. a. Verify that the systems walkthrough outline meets the criteria specified on Form ES-301-2:
(1) The outline(s) contains the required number of control room and in-plant tasks distributed W among the safety functions as specified on the form.
A (2) Task repetition from the last two NRC examinations is within the limits specified on the form.
L (3) No tasks are duplicated from the applicants audit test(s).
K (4) The number of new or modified tasks meets or exceeds the minimums specified on the form.
T (5) The number of alternate-path, low-power, emergency, and radiologically controlled area H tasks meets the criteria on the form.
R b. Verify that the administrative outline meets the criteria specified on Form ES-301-1:
O (1) The tasks are distributed among the topics as specified on the form.
U (2) At least one task is new or significantly modified.
G (3) No more than one task is repeated from the last two NRC licensing examinations.
H
- c. Determine whether there are enough different outlines to test the projected number and mix of applicants and ensure that no items are duplicated on subsequent days.
- 4. a. Assess whether plant-specific priorities (including probabilistic risk assessment and individual plant examination insights) are covered in the appropriate exam sections.
G b. Assess whether the 10 CFR 55.41, 55.43, and 55.45 sampling is appropriate.
E N c. Ensure that K/A importance ratings (except for plant-specific priorities) are at least 2.5.
E R d. Check for duplication and overlap among exam sections and the last two NRC exams.
A L e. Check the entire exam for balance of coverage.
- f. Assess whether the exam fits the appropriate job level (RO or SRO).
Printed Name/Signature Date
- a. Author Bryan A. Bergeon BB /
- b. Facility Reviewer (*) N/A N/A
- c. NRC Chief Examiner (#) Gregory M. Roach GMR /
- d. NRC Supervisor Patricia J. Pelke /
- Not applicable for NRC-prepared examination outlines.
- The independent NRC reviewer initials items in column c; the chief examiners concurrence is required.