ML22041B548

From kanterella
Revision as of 18:12, 18 November 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
Jump to navigation Jump to search
Summary of February 1, 2022, Meeting with the Technical Specifications Task Force Regarding Traveler TSTF-576, Revise Safety/Relief Valve Requirements
ML22041B548
Person / Time
Site: Technical Specifications Task Force
Issue date: 02/16/2022
From: Michelle Honcharik
NRC/NRR/DSS/STSB
To: Victor Cusumano
NRC/NRR/DSS/STSB
Honcharik, M., NRR/DSS, 301-415-1774
Shared Package
ML22045A017 List:
References
Download: ML22041B548 (5)


Text

MEMORANDUM TO: Victor G. Cusumano, Branch Chief Technical Specifications Branch Division of Safety Systems Office of Nuclear Reactor Regulation FROM: Michelle C. Honcharik, Senior Project Manager Technical Specifications Branch Division of Safety Systems Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

OF FEBRUARY 1, 2022, MEETING WITH THE TECHNICAL SPECIFICATIONS TASK FORCE REGARDING TRAVELER TSTF-576, REVISE SAFETY/RELIEF VALVE REQUIREMENTS On February 1, 2022, an Observation meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of the Technical Specifications Task Force (TSTF). The meeting was a workshop to discuss ideas on a path forward for the revision and review of traveler TSTF-576 Revise Safety/Relief Valve Requirements (Agencywide Documents Access and Management System (ADAMS) Accession No. ML21174A109). The meeting notice is available in the ADAMS at Accession No. ML22024A457. A list of attendees is enclosed.

The NRC staffs presentation is in ADAMS at Accession No. ML22013B142. The NRC staff suggested changes to the boiling water reactor standard technical specification (TS) 3.4.3, Safety/Relief Valves (S/RVs), to resolve an ongoing TS compliance issue. Staff emphasized that the suggestions presented were still in the conceptual stage and were for discussion only.

In the NRC staffs presentation, examples of actual S/RV opening pressures were presented which are based on actual plant data. However, the pressures were not specific to any particular plant. The NRC staff proposed to maintain compliance with the TS given the actual S/RV performance, where the current +/-3% tolerance should be expanded and could be used as a new TS limit and in the safety analysis.

CONTACT: Michelle C. Honcharik, NRR/DSS 301-415-1774February 16, 2022 Signed by Honcharik, Michelle on 02/16/22

V. Cusumano

In the NRC staffs proposal, the allowable as-found opening pressure values would: 1) be plant specific and reflect how the S/RVs actually perform, 2) be consistent with the reload analysis, and 3) allow the overall system of S/RVs to maintain system pressure below Safety Limit 2.1.2.

Additionally, the proposal considers that the allowable ranges may be put into a licensee-controlled document similar to the Core Operating Limits Report or Pressure and Temperature Limits Report.

The NRC staffs proposal was well received by the TSTF members. The TSTF members asked clarifying questions and expressed that the proposal appears to be a viable approach. The TSTF will pursue making changes to the traveler and share a draft of the revised traveler with the NRC staff by late March 2022.

The public had no comments.

Project No. 753

Enclosure:

As stated

cc: See next page

Package: ML22045A017; Meeting summary: ML22041B548; Meeting notice: ML22024A457; traveler TSTF-576: ML21174A109; Presentation slides: ML22013B142

  • concurred via e-mail NRR-106 OFFICE NRR/DSS/STSB NRR/DSS/STSB/BC NRR/DSS/STSB NAME MHoncharik VCusumano MHoncharik DATE 2/15/2022 2/16/2022 2/16/2022 LIST OF ATTENDEES

NRC Staff Honcharik, Michelle Beaton, Robert Cusumano, Victor Scarbrough, Thomas Farnan, Michael Smith, Steve Tseng, Ian Kim, James

Industry/Public Knaide, Ken - PSEG Nuclear Joyce, Ryan M.

Scott, Eric (PSEG)

Hartwick, Robert W (GE Power Portfolio)

Bergman, Jana Mann, Brian (Excel Services)

Martins, Lucas (GE Power Portfolio)

Couture, Phil Furst, Troy Collart, Timothy Gerard Atwood, Denver G.

Enclosure

Technical Specifications Task Force Project No. 753

cc:

Technical Specifications Task Force c/o EXCEL Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Attention: Brian D. Mann E-mail: brian.mann@excelservices.com

Drew Richards STP Nuclear Operating Company 12090 FM 521 Mail Code: N5016 Wadsworth, TX 77483 Email: amrichards@stpegs.com

Kevin Lueshen Constellation Energy Generation 4300 Winfield Road Warrenville IL 60555 Email: kevin.lueshen@constellation.com

Jordan L. Vaughan Duke Energy EC07C / P.O. Box 1006 Charlotte, NC 28202 Email: jordan.vaughan@duke-energy.com

Ryan M. Joyce Southern Nuclear Operating Company 3535 Colonnade Parkway / Bin N-274-EC Birmingham, AL 35243 Email: rmjoyce@southernco.com

Wesley Sparkman Southern Nuclear Operating Company 3535 Colonnade Parkway / Bin N-226-EC Birmingham, AL 35242 Email: wasparkm@southernco.com