December 11, 2017 MEMORANDUM TO:
Victor Cusumano, Branch Chief Technical Specifications Branch Division of Safety Systems Office of Nuclear Reactor Regulation FROM:
Michelle C. Honcharik, Senior Project Manager /RA/
Technical Specifications Branch Division of Safety Systems Office of Nuclear Reactor Regulation
SUBJECT:
SUMMARY
OF NOVEMBER 30, 2017, PRE-SUBMITTAL MEETING WITH THE TECHNICAL SPECIFICATIONS TASK FORCE RE: DRAFT TSTF-569, REVISE RESPONSE TIME TESTING DEFINITION On November 30, 2017, a Category 2 public meeting was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of the Technical Specifications Task Force (TSTF). The notice and agenda are available in the Agencywide Documents Access and Management System (ADAMS) at Accession No. ML17324B305. A list of attendees is enclosed.
The proposed change would allow licensees to apply approved topical report methodology to verify response time for new components in lieu of measurement. The staff asked several questions about what limitations would be established on the use of the approved methodology for new components.
The TSTF intends to submit traveler TSTF-569 as part of the Consolidated Line Item Improvement Process (CLIIP). The traveler is scheduled to be submitted in the first quarter of calendar year 2018.
A draft of traveler TSTF-569 was provided prior to the meeting and is available in ADAMS at Accession No. ML17317A449. The meeting presentation is enclosed.
There were no final determinations made during the meeting. No members of the public had comments.
Project No. 753
Enclosures:
- 1. Meeting attendees
- 2. Meeting presentation cc: See next page
Package: ML17345A097, Meeting summary: ML17341B011, Meeting notice: ML17317A421, Draft TSTF-567: ML17317A449
- concurred via e-mail NRR-106 OFFICE DSS/STSB*
DSS/STSB*
NAME MHoncharik VCusumano DATE 12/11/2017 12/11/2017
Technical Specifications Task Force Project No. 753 cc:
Technical Specifications Task Force c/o EXCEL Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Attention: Brian D. Mann E-mail: brian.mann@excelservices.com James P. Miksa Entergy Nuclear Operations, Inc.
Palisades Nuclear Power Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Email: jmiksa@entergy.com Jordan L. Vaughan Duke Energy EC2ZF / P.O. Box 1006 Charlotte, NC 28202 Email: jordan.vaughan@duke-energy.com Lisa L. Williams Energy Northwest Columbia Generating Station PO Box 968 Mail Drop PE20 Richland, WA 99352-0968 E-mail: llwilliams@energy-northwest.com David M. Gullott Exelon Generation 4300 Winfield Road Warrenville IL 60555 Email: David.Gullott@exeloncorp.com Wesley Sparkman Southern Nuclear Operating Company 42 Inverness Center Parkway / Bin B237 Birmingham, AL 35242 Email: wasparkm@southernco.com LIST OF ATTENDEES
- David Gullott TSTF/Exelon
- Jim Miska TSTF/Entergy
- Karl Gross NuScale Ron Jarrett Tennessee Valley Authority Jim Andracheck Westinghouse
- Jay Boardman Pressurized Water Reactors Owners Group NRC Staff:
Margaret Chernoff Gush Singh Michelle Honcharik
- Participated via telephone
MEETING PRESENTATION