Notice of Forthcoming Meeting with the U.S. NRC and BWROG Members of the TSTF Pre-Submittal of RPV Water Inventory Traveler
ML12270A261
Person / Time
Site: Technical Specifications Task Force
Issue date: 10/03/2012
From: Michelle Honcharik
Licensing Processes Branch (DPR)
To: Stuchell S
Licensing Processes Branch (DPR)
Honcharik M
References
Download: ML12270A261 (4)


Text

October 3, 2012 MEMORANDUM TO: Sheldon D. Stuchell, Acting Chief Licensing Processes Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation FROM: Michelle C. Honcharik, Sr. Project Manager /RA/

Licensing Processes Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING PUBLIC MEETING WITH THE U.S. NUCLEAR REGULATORY COMMISSION AND BOILING WATER REACTOR OWNERS GROUP (BWROG) MEMBERS OF THE TECHNICAL SPECIFICATIONS TASK FORCE (TSTF) RE: PRE-SUBMITTAL OF REACTOR PRESSURE VESSEL (RPV) WATER INVENTORY TRAVELER DATE & TIME: Wednesday, October 17, 2012 9:00 a.m. - 12:00 p.m.

LOCATION: U.S. Nuclear Regulatory Commission (NRC)

One White Flint North 11555 Rockville Pike, Room 8-B2 Rockville, MD 20852 PURPOSE: To conduct a pre-submittal meeting with BWROG members of the TSTF regarding an upcoming Traveler to replace operations with the potential for draining the reactor vessel (OPDRV) requirements with technical specifications (TS) on RPV water inventory. The new TS will be based on meeting the safety limit that requires the RPV water level to be above the top of the fuel at all times, which will replace the need for OPDRV requirements. There is no meeting agenda because the meeting is an open dialogue.

CATEGORY 2*: This is a Category 2 Meeting. The public is invited to participate in this meeting by discussing regulatory issues with the NRC at the end of the meeting.

MEETING CONTACT: Michelle C. Honcharik, NRR/DPR 301-415-1774 Michelle.Honcharik@nrc.gov

  • Commissions Policy Statement on Enhancing Public Participation in NRC Meetings, (67 FR 36920), May 28, 2002

S. Stuchell NOTE: The NRC provides reasonable accommodation to individuals with disabilities where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g. Braille, large print), please notify the NRC's meeting coordinator. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.

PARTICIPANTS: Participants from the NRC include members of the Office of Nuclear Reactor Regulation (NRR).

NRC TSTF Michelle Honcharik (NRR) Brian Mann Robert Elliott (NRR) Tony Browning (BWROG), et al.

Carl Schulten (NRR), et al.

Project No. 753 cc: See next page

ML12270A261 NRC-001 OFFICE PLPB/PM PLPB/BC (A) PLPB/PM NAME MHoncharik SStuchell MHoncharik DATE 10/1/2012 10/2/2012 10/3/2012 Technical Specifications Task Force Project No. 753 cc:

Technical Specifications Task Force 11921 Rockville Pike Suite 100 Rockville, MD 20852 Attention: Donald R. Hoffman E-mail: donaldh@excelservices.com Robert A. Slough Comanche Peak Nuclear Power Plant P. O. Box 1002, Mail Code A08 Glen Rose, Texas 76043 E-mail: robert.slough@luminant.com Roy A. (Tony) Browning Duane Arnold Energy Center 3277 DAEC Rd.

PSC/Licensing Palo, IA 52324-9785 E-mail: Tony.Browning@nexteraenergy.com Wendy E. Croft Exelon Nuclear 200 Exelon Way, Suite 340 Kennett Square, PA 19348 E-mail: Wendi.Croft@exeloncorp.com Otto W. Gustafson Entergy Nuclear Operations, Inc.