ML22069A113

From kanterella
Revision as of 14:11, 18 November 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

License Amendment 43 - Approval of Physical Protection Plan, Revision 25 (Enterprise Project Identifier L-2022-SPR-0002)
ML22069A113
Person / Time
Site: BWX Technologies
Issue date: 03/16/2022
From: Jacob Zimmerman
NRC/NMSS/DFM/FFLB
To: Terry C
BWXT NOG-Lynchburg
James Downs NMSS/DFM/FFL 301-415-7744
Shared Package
ML22069A112 List:
References
EPID L-2022-SPR-0002
Download: ML22069A113 (3)


Text

OFFICIAL USE ONLY SECURITY - RELATED INFORMATION

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001

March 16, 2022

Chris Terry, Manager Licensing and Safety Analysis BWXT Nuclear Operations Group, Inc.

P.O. Box 785 Lynchburg, VA 24505- 0785

SUBJECT:

LICENSE AMENDMENT 43 - APPROVAL OF PHYSICAL PROTECTION PLAN, REVISION 25 (ENTERPRISE PROJECT IDENTIFIER L-2022-SPR-0002)

Dear Chris Terry:

This refers to letter 22 -012, dated February 24, 2022 (Agencywide Documents Access and Management System [ADAMS] Accession Number ML22060A131 - not publicly available due to security-related information in the cover letter and classified information in the enclosure), in which BWXT Nuclear Operations Group, Inc. - Lynchburg, Inc. (BWXT NOG-L) submitted proposed changes to the Physical Protection Plan (PPP). The enclosure to the letter provided descriptions and justifications for the proposed PPP changes. Following the review and approval of the PPP changes by the U.S. Nuclear Regulatory Commission (NRC), BWXT NOG-L stated in the letter that a copy of the updated PPP (Revision 25) will be transmitted to the NRC.

By letter 22-014, dated March 3, 2022 (ADAMS Accession Number ML22069B080 - not publicly available due to security-related information in the cover letter and classified information in the enclosure), BWXT NOG -L revised the proposed changes to the PPP by providing more information on the search requirements for specific types of shipments. By email dated March 8, 2022 (ADAMS Accession Number ML22068A116), BWXT NOG-L revised the scope of their request and excluded the proposed changes to the fatigue management commitments in the PPP. Therefore, the NRC staff reviewed only the proposed changes to the PPP associated with search requirements for specific types of shipments.

The NRC staff has completed its review of the request. The NRC has determined that the proposed changes to the PPP are acceptable, and issuance of this license amendment will n ot significantly impact the public health and safety and the environment, will not be inimical to the common defense and security, and will not endanger life or property or the common defense and security.

Pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 70.32(e) and 70.34, Safeguards Condition SG-6.1 of Materials License SNM-42 is hereby amended to reference Revision 25 of the PPP, submitted by letter dated February 24, 2022.

The letter transmitted contains Security-Related Information. When separated from Enclosures 2 & 3, this letter is decontrolled.

OFFICIAL USE ONLY SECURITY - RELATED INFORMATION

OFFICIAL USE ONLY SECURITY - RELATED INFORMATION

C. Terry 2

All other license conditions shall remain the same. Enclosures 1 and 2 to this letter provide the amended Materials License SNM-42. The NRC staffs review is documented in a Safeguards Evaluation Report, which is Enclosure 3 to this letter. This letter concludes action on this submittal, and Enterprise Project Identifier L -2022-SPR-0002 is considered CLOSED.

Enclosures 2 and 3 contain sensitive security-related information. Accordingly, they are marked as Official Use Only, and are withheld from public disclosure. When separated from the sensitive enclosures, this letter and Enclosure 1 are decontrolled and publicly available, in accordance with 10 CFR 2.390 of the NRCs "Agency Rules of Practice and Procedure."

In accordance with 10 CFR 2.390, Public inspections, exemptions, requests for withholding, of the NRCs Agency Rules of Practice and Procedure, a copy of this letter and Enclosure 1 will be available for public inspection in the NRC Public Document Room (PDR) or electronically from the Publicly Available Records System component of ADAMS. The PDR is currently closed. You may submit your request to the PDR via e mail at PDR.Resource@nrc.gov or call 1-800- 397-4209 between 8:00 a.m. and 4:00 p.m. (EST), Monday through Friday, except Federal holidays. The ADAMS database is accessible from the NRC W eb site at http://www.nrc.gov/reading-rm/adams.html.

If you have any questions regarding this matter, please contact James Downs of my staff at 301-415-7744, or via e-mail to: James.Downs@nrc.gov.

Sincerely,

Jacob I. Zimmerman, Chief Fuel Facility Licensing Branch Division of Fuel Management Office of Nuclear Material Safety and Safeguards

Docket No. 70-27 License No. SNM-42

Enclosures:

1. Amendment 43 to Materials License SNM-42
2. Amendment 43 to Materials License SNM-42 (Non-Public)
3. Safeguards Evaluation Report (Non-Public)

cc: bwxt@listmgr.nrc.gov

OFFICIAL USE ONLY SECURITY - RELATED INFORMATION

ML22069A112 (Pkg. ), ML22069A113 (Ltr.)

ML22069A114 (Encl. 1), ML22069A115 (Encl. 2), ML22069A116 (Encl. 3)

OFFICE NMSS/DFM/ NMSS/DFM/ NSIR/DPCP/ NMSS/DFM/

FFLB/PM FFLB/LA MSB/BC FFLB/BC NAME JDowns ELee ARivera JZimmerman DATE 03/11/2022 03/14/2022 03/14/2022 03/16/2022