ML22116A024

From kanterella
Revision as of 05:49, 18 November 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
NRR E-mail Capture - NRC Acceptance Review of Braidwood, Byron, and Ginna Request to Adopt TSTF-246
ML22116A024
Person / Time
Site: Byron, Braidwood, Ginna  Constellation icon.png
Issue date: 04/25/2022
From: Joel Wiebe
NRC/NRR/DORL/LPL3
To: Henderson P
Exelon Generation Co
References
Download: ML22116A024 (2)


Text

From: Wiebe, Joel Sent: Monday, April 25, 2022 4:19 PM To: Phillip Henderson (Phillip.Henderson@constellation.com)

Cc: Lisa Simpson (Lisa.Simpson@constellation.com); Zurawski, Lisa M:(Constellation Nuclear)

Subject:

NRC Acceptance Review of Braidwood, Byron, and Ginna Request to Adopt TSTF-246

Hi Phil,

By letter dated March 24, 2022 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML22083A224), Constellation Energy Generation, LLC (Constellation) submitted a proposed license amendment to adopt Technical Specification Task Force Traveler (TSTF) 246, "RTS [Reactor Trip System] Instrumentation, 3.3.1 Condition F Completion Time,"

Revision 0. Specifically, Constellation is requesting to change the completion time of the Limiting Conditions for Operation (LCO) 3.3.1 Condition F Technical Specification 3.3.1 from 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

The NRC staff has reviewed the submittal and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed alternative in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this request will take approximately 90 hours0.00104 days <br />0.025 hours <br />1.488095e-4 weeks <br />3.4245e-5 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months from the date of this acceptance, which is April 2023. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.

If you have any questions, please contact me at (301) 415-6606.

Joel

Hearing Identifier: NRR_DRMA Email Number: 1609

Mail Envelope Properties (MN2PR09MB4971BB16D6955DA97A9DD7DC8BF89)

Subject:

NRC Acceptance Review of Braidwood, Byron, and Ginna Request to Adopt TSTF-246 Sent Date: 4/25/2022 4:19:00 PM Received Date: 4/25/2022 4:18:00 PM From: Wiebe, Joel

Created By: Joel.Wiebe@nrc.gov

Recipients:

"Lisa Simpson (Lisa.Simpson@constellation.com)" <lisa.simpson@constellation.com>

Tracking Status: None "Zurawski, Lisa M:(Constellation Nuclear)" <lisa.zurawski@constellation.com>

Tracking Status: None "Phillip Henderson (Phillip.Henderson@constellation.com)" <phillip.henderson@constellation.com>

Tracking Status: None

Post Office: MN2PR09MB4971.namprd09.prod.outlook.com

Files Size Date & Time MESSAGE 2551 4/25/2022 4:18:00 PM

Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: