EN 56387 Paragon - Part 21 Report Re Defect Identified in Automatic Transfer Switch Pn: NLI-ATS480A400X1
ML23065A196
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 03/02/2023
From: Knott R
Paragon Energy Solutions
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
Download: ML23065A196 (1)


Text

To: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555 Fax Number (301)816-5151

10CFR Part 21 Initial Notification: P21-003032023-IN

Subject:

Defect identified in Automatic Transfer Switch PN: NLI-ATS480A400X1

Pursuant to 10CFR 21.21 (d)(3)(i), Paragon Energy Solutions, LLCis providing initial notification of the identification of a defect potentially associated with a substantial safety hazard.

Condition to be evaluated:

The subject Automatic Transfer Switches contain Mar-Bal bus insulators PN: 1100-A1 (item #10 on drawing 071-351029663-BM-1). Based on Paragon testing performed, the insulators may have developed stress cracking due to over tightening of required mounting hardware during the assembly process which wasnot detected by inspection at Paragon. Stress cracks in the insulators could degrade the structural integrity of the automatic transfer switch to withstand seismic conditions which could potentially cause a substantial safety hazard.

Only one customer is affected by this issue (Talen Energy-Susquehanna PO# 00659843 Rev 4 / Paragon Project 351029663).

Serial numbers of the potentially effected units (QTY 4): 351029663-1 through 351029663-4

It is recommended the licensee inspect the insulators for the supplied automatic transfer switches for stress cracking and contact Paragon for any needed assistance to resolve any deficiencies identified.

Date of Discovery: 1/29/2023 Date of Part 21 Reportability Determined: 3/2/2023

Formal notification will be submitted on or before 3/31/2023.

Please contact me with any questions or comments.

Regards,

Richard Knott Vice President Quality Assurance Paragon Energy Solutions 817-284-0077 rknott@paragones.com