ML23118A139
From kanterella
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ML23118A139 | |
Person / Time | |
---|---|
Site: | Harris |
Issue date: | 04/28/2023 |
From: | Haaf T Duke Energy, Duke Energy Progress |
To: | Office of Nuclear Reactor Regulation, Document Control Desk |
Shared Package | |
ML23118A138 | List: |
References | |
RA-23-0049 | |
Download: ML23118A139 (135) | |
Similar Documents at Harris | |
---|---|
Category:Letter
MONTHYEARML24290A1102024-10-24024 October 2024
[Table view]Notification of Licensed Operator Initial Examination 05000400/2025301 05000400/LER-2024-001-01, Automatic Reactor Trip Due to Main Generator Lock-Out2024-10-23023 October 2024 Automatic Reactor Trip Due to Main Generator Lock-Out IR 05000400/20240112024-09-10010 September 2024 NRC Inspection Report 05000400/2024011 IR 05000400/20240052024-08-26026 August 2024 Updated Inspection Plan for Shearon Harris Nuclear Power Plant, Unit 1 (Report 05000400-2024005) Rev 1 ML24059A4252024-08-14014 August 2024 Issuance of Amendment No. 202 Regarding Alignment of Certain Technical Specifications with Improved Standard Technical Specifications ML24213A0522024-08-0202 August 2024 Issuance of Amendment No. 201 to Extend Completion Time of Inoperable Reactor Coolant System Accumulator Using Consolidated Line Item Improvement Process ML24212A3412024-07-31031 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection IR 05000400/20240022024-07-29029 July 2024 – Integrated Inspection Report 05000400/2024002 ML24170A7312024-07-29029 July 2024 – Exemption from the Requirements of 10 CFR 50.55a(H)(2) Using the Risk-Informed Process for Evaluations Letter 05000400/LER-2024-001, Automatic Reactor Trip Due to Main Generator Lock-Out2024-07-22022 July 2024 Automatic Reactor Trip Due to Main Generator Lock-Out ML24183A0972024-07-12012 July 2024 ISFSI; Catawba 1, 2 & ISFSI; McGuire 1, 2 & ISFSI; Oconee 1, 2, 3 & ISFSI; Shearon Harris 1; H. B. Robinson 2 & ISFSI; and Radioactive Package Shipping Under 10 CFR 71 (71-266 & 71-345) – Review of QA Program Changes EPID L-2024-LLQ-0002 IR 05000400/20243022024-06-27027 June 2024 – NRC Operator Licensing Examination Approval 05000400/2024302 IR 05000400/20244012024-06-25025 June 2024 – Security Baseline Inspection Report05000400/2024401 ML24162A1372024-06-24024 June 2024 – Regulatory Audit Summary Related to the Review of Exemption Request from Certain Requirements in 10 CFR 50.55a(h)(2)(EPID L-2024-LLE-00040) ML24136A1382024-05-20020 May 2024 – Notification of an NRC Fire Protection Team Inspection (FPTI) (NRC Inspection Report 05000400/2024011) and Request for Information (RFI) ML24116A2592024-05-14014 May 2024 Staff Evaluation Related to Aging Management Plan and Inspection Plan for Reactor Vessel Internals ML24127A1592024-05-0808 May 2024 – Notification of Licensed Operator Initial Examination 05000400/2024302 IR 05000400/20240012024-05-0505 May 2024 Integrated Inspection Report 05000400/2024001 ML24100A0912024-04-10010 April 2024 Operator License Examination Report ML24058A2462024-03-18018 March 2024 – Supplemental Information Needed for Using the Risk-Informed Process for Evaluations for the Request for Exemption from Certain Requirements in 10 CFR 50.55a(h)(2) IR 05000400/20230062024-02-28028 February 2024 Annual Assessment Letter for Shearon Harris Nuclear Power Plant - NRC Inspection Report 05000400/2023006 ML24032A2632024-02-23023 February 2024 – Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0044 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) IR 05000400/20230042024-01-30030 January 2024 Integrated Inspection Report 05000400/2023004 ML23317A3462023-11-14014 November 2023 Duke Fleet - Correction Letter to License Amendment Nos. 312 & 340 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000400/20230032023-11-0909 November 2023 Integrated Inspection Report 05000400/2023003 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23234A1702023-10-0303 October 2023 Issuance of Amendment No. 199 Regarding Administrative Changes to the Renewed Facility Operating License and Technical Specifications ML23256A0882023-09-25025 September 2023 Issuance of Alternative to Steam Generator Welds ML23195A0782023-08-29029 August 2023 Issuance of Amendments Regarding the Adoption of Technical Specifications Task Force Traveler TSTF-554, Revision 1 IR 05000400/20230052023-08-23023 August 2023 Updated Inspection Plan for Shearon Harris Nuclear Power Plant, Unit 1 (Report 05000400/2023005) ML23234A2542023-08-22022 August 2023 RQ Inspection Notification Letter IR 05000400/20234022023-07-26026 July 2023 Security Baseline Inspection Report 05000400/2023402 IR 05000400/20230022023-07-24024 July 2023 Integrated Inspection Report 05000400/2023002 IR 05000400/20234402023-07-17017 July 2023 Special Inspection Report 05000400/2023440 and Preliminary Greater than Green Finding and Apparent Violation Cover Letter 05000400/LER-2022-006-02, Auxiliary Feedwater Pump Inoperability2023-07-11011 July 2023 Auxiliary Feedwater Pump Inoperability IR 05000400/20243012023-05-15015 May 2023 – Notification of Licensed Operator Initial Examination 05000400/2024301 IR 05000400/20230012023-05-10010 May 2023 – Integrated Inspection Report 05000400 2023001 IR 05000400/20234042023-05-0404 May 2023 Cyber Security Inspection Report 05000400/2023404 ML23118A0762023-05-0101 May 2023 Approval for Use of Specific Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML23118A1392023-04-28028 April 2023 Submittal of Updated Final Safety Analysis Report (Amendment 65), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes IR 05000400/20234032023-04-0505 April 2023 Security Baseline Inspection Report 05000400/2023403 IR 05000400/20230102023-03-15015 March 2023 Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000400/2023010 ML22332A4932023-03-10010 March 2023 William States Lee III 1 and 2 - Issuance of Amendments Regarding the Relocation of the Emergency Operations Facility 05000400/LER-1922-006-01, Auxiliary Feedwater Pump Inoperability2023-03-10010 March 2023 Auxiliary Feedwater Pump Inoperability IR 05000400/20220062023-03-0101 March 2023 Annual Assessment Letter for Shearon Harris Nuclear Power Plant - NRC Inspection Report 05000400/2022006 ML23033A5272023-02-0808 February 2023 Correction of Typographical Errors Incurred During Issuance of License Amendment No. 196 IR 05000400/20220042023-02-0707 February 2023 Integrated Inspection Report 05000400/2022004 05000400/LER-2022-007-01, Automatic Reactor Trip Due to Loss of Power from the a Auxiliary Bus2023-01-26026 January 2023 Automatic Reactor Trip Due to Loss of Power from the a Auxiliary Bus ML23020A1252023-01-23023 January 2023 Notification of Target Set Inspection and Request for Information (NRC Inspection Report 05000400/2023403) 05000400/LER-2022-006, Auxiliary Feedwater Pump Inoperability2022-12-20020 December 2022 Auxiliary Feedwater Pump Inoperability 2024-09-10 Category:Updated Final Safety Analysis Report (UFSAR) MONTHYEARML23118A1392023-04-28028 April 2023
[Table view]Submittal of Updated Final Safety Analysis Report (Amendment 65), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes RA-23-0049, Enclosure 1 - Shearon Harris Nuclear Power Plant, Unit 1, Updated Final Safety Analysis Report, Amendment 65 - Redacted Version (Publicly Available Information)2023-04-28028 April 2023 Enclosure 1 - Shearon Harris Nuclear Power Plant, Unit 1, Updated Final Safety Analysis Report, Amendment 65 - Redacted Version (Publicly Available Information) RA-21-0282, Submittal of Updated Final Safety Analysis Report (Amendment 64), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes2021-11-15015 November 2021 Submittal of Updated Final Safety Analysis Report (Amendment 64), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes ML20147A0412020-05-15015 May 2020 Amendment 63 to Updated Final Safety Analysis Report, Documents Incorporated by Reference Updated Since Amendment No. 62 RA-20-0134, Amendment 63 to Updated Final Safety Analysis Report, Drawings (Redacted) Part 2 of 22020-05-15015 May 2020 Amendment 63 to Updated Final Safety Analysis Report, Drawings (Redacted) Part 2 of 2 ML20147A0182020-05-15015 May 2020 Amendment 63 to Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant ML20147A0222020-05-15015 May 2020 Amendment 63 to Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML20147A0322020-05-15015 May 2020 Amendment 63 to Update Final Safety Analysis Report, Chapter 15, Accident Analysis ML20147A0232020-05-15015 May 2020 Amendment 63 to Final Safety Analysis Report, Chapter 6, Engineered Safety Features. (Redacted) ML20147A0242020-05-15015 May 2020 Amendment 63 to Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML20147A0252020-05-15015 May 2020 Amendment 63 to Final Safety Analysis Report, Chapter 8, Electric Power ML20147A0422020-05-15015 May 2020 Amendment 63 to Updated Final Safety Analysis Report, Drawings (Redacted) Part 1 of 2 ML20147A0362020-05-15015 May 2020 Amendment 63 to Final Safety Analysis Report, Appendices ML20147A0372020-05-15015 May 2020 Amendment 63 to Final Safety Analysis Report, Figures Flagged for Redaction ML20147A0342020-05-15015 May 2020 Amendment 63 to Update Final Safety Analysis Report, Chapter 17, Quality Assurance During Design and Construction ML20147A0302020-05-15015 May 2020 Amendment 63 to Final Safety Analysis Report, Chapter 13, Conduct of Operations ML20136A1632020-05-15015 May 2020 Submittal of Updated Final Safety Analysis Report (Amendment 63), Technical Specification Bases Revision, Report of Changes Pursuant to 10 CFR 50.59 and Summary of Commitment Changes ML20147A0332020-05-15015 May 2020 Amendment 63 to Update Final Safety Analysis Report, Chapter 16, Preliminary Technical Specification ML20147A0312020-05-15015 May 2020 Amendment 63 to Final Safety Analysis Report, Chapter 14, Initial Test Program ML20147A0382020-05-15015 May 2020 Amendment 63 to Final Safety Analysis Report, List of Effective Pages ML20147A0282020-05-15015 May 2020 Amendment 63 to Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML20147A0272020-05-15015 May 2020 Amendment 63 to Final Safety Analysis Report, Chapter 10, Summary Description ML20147A0392020-05-15015 May 2020 Amendment 63 to Updated Final Safety Analysis Report, Information Removed from Amendment ML20147A0292020-05-15015 May 2020 Amendment 63 to Final Safety Analysis Report, Chapter 12, Radiation Protection (Redacted) ML20147A0262020-05-15015 May 2020 Amendment 63 to Final Safety Analysis Report, Chapter 9, New and Spent Storage and Handing (Redacted) ML20147A0172020-05-15015 May 2020 Amendment 63 to Final Safety Analysis Report, Cover Sheet ML20147A0212020-05-15015 May 2020 Amendment 63 to Final Safety Analysis Report, Chapter 4, Reactor ML20147A0352020-05-15015 May 2020 Amendment 63 to Update Final Safety Analysis Report, Chapter 18, Final Safety Analysis Supplement for License Renewal RA-19-0160, Amendment 62 to Final Safety Analysis Report, Drawings, Part 3 of 32019-03-29029 March 2019 Amendment 62 to Final Safety Analysis Report, Drawings, Part 3 of 3 HNP-17-029, UFSAR Rev 61, End Appendices2017-05-10010 May 2017 UFSAR Rev 61, End Appendices ML18337A3992017-05-10010 May 2017 Shearon Harris UFSAR Rev 61, Drawings, Part 8 ML18337A3952017-05-10010 May 2017 Shearon Harris UFSAR Rev 61, Drawings, Part 7 ML18337A3922017-05-10010 May 2017 Shearon Harris UFSAR Rev 61, Drawings, Part 6 ML18337A3892017-05-10010 May 2017 Shearon Harris UFSAR Rev 61, Drawings, Part 5 ML18337A3862017-05-10010 May 2017 Shearon Harris UFSAR Rev 61 Drawings Part 4 ML18337A3842017-05-10010 May 2017 Shearon Harris UFSAR Rev 61 Drawings Part 3 ML18337A3832017-05-10010 May 2017 Shearon Harris UFSAR Rev 61 Drawings Part 2 ML18337A3792017-05-10010 May 2017 Shearon Harris UFSAR Rev 61, Drawings Part 1 ML18337A3632017-05-10010 May 2017 Shearon Harris UFSAR Rev 61, Chapter 18, Final Safety Analysis Report Supplement for License Renewal ML18337A3522017-05-10010 May 2017 Shearon Harris UFSAR Rev 61 Chapter 16, Preliminary Technical Specification (PSAR) ML18337A3482017-05-10010 May 2017 Shearon Harris UFSAR Rev 61, Chapter 15, Accident Analysis ML18337A3432017-05-10010 May 2017 Shearon Harris UFSAR Rev 61, Chapter 14, Initial Test Program ML18337A3372017-05-10010 May 2017 Shearon Harris UFSAR Rev 61, Chapter 13, Conduct of Operations ML18337A3342017-05-10010 May 2017 Shearon Harris UFSAR Rev 61, Chapter 12, Radiation Protection ML18337A3292017-05-10010 May 2017 UFSAR Rev 61, Chapter 11, Radioactive Waste Management ML18337A3092017-05-10010 May 2017 Shearon Harris UFSAR Rev 61, Chapter 10, Summary Description ML18337A3032017-05-10010 May 2017 Shearon Harris UFSAR Rev 61, Chapter 9, New and Spent Fuel Storage and Handling ML18337A2872017-05-10010 May 2017 Shearon Harris UFSAR Rev 61, Chapter 7, Instrument and Controls ML18337A2792017-05-10010 May 2017 Shearon Harris UFSAR Rev 61, Chapter 6, Engineered Safety Features ML18337A2782017-05-10010 May 2017 Shearon Harris UFSAR Rev 61, Chapter 5, Reactor Coolant System and Connected Systems 2023-04-28 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML23118A139&oldid=3704908"