RA-19-0160, Amendment 62 to Final Safety Analysis Report, Drawings, Part 3 of 3

From kanterella
Jump to navigation Jump to search
Amendment 62 to Final Safety Analysis Report, Drawings, Part 3 of 3
ML19102A153
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/29/2019
From:
Duke Energy Progress
To:
Office of Nuclear Reactor Regulation
Shared Package
ML19102A137 List:
References
RA-19-0160
Download: ML19102A153 (23)


Text

Facility Code : HNP Applicable Facilities : HNP Document Number : 8-G-0517 S04 Document Revision Number : 013 Document EC Number :

Change Reason : EC0000284333 Document Title : HVAC-RAB CONTROL ROOM AIR FLOW DIAGRAM Brennan, Jerry W. PREPARER 4/23/2018 Pappur, Manjunath V. APPROVER 4/26/2018 Notes :

ELECTRONICALLY 13 INCORPORATED: EC 284333 (B5,C4,F2,G3,G4,G6,G7,H2,I4)

SIGNED REV DESCRIPTION APPROVAL DUKE ENERGY QUALITY LEVEL:

NUCLEAR SAFETY RELATED IN PART PLANT: HARRIS PROJECT - UNIT 1 SCALE: N/A TITLE:

HVAC-REACTOR AUXILIARY BUILDING CONTROL ROOM AIR FLOW DIAGRAM PLANT DWG NO.: 2168-G-0517 S04

Facility Code : HNP Applicable Facilities : HNP Document Number : 8-G-0533 S04 Document Revision Number : 012 Document EC Number :

Change Reason : EC0000270291 Document Title : HVAC-AIR FLOW DIAG WPB SH 3 UNITS 1-2 Mehta, Ameeta Preparer 7/19/2017 Scattergood, Tom Approver 7/19/2017 Notes :

Facility Code : HNP Applicable Facilities : HNP Document Number : 8-G-0533 S06 Document Revision Number : 010 Document EC Number :

Change Reason : EC0000270291 Document Title : HVAC-AIR FLOW DIAGRAM WASTE PROCESSING BUILDING SHEET 5 UNITS 1 & 2 Mehta, Ameeta Preparer 7/18/2017 Scattergood, Tom Approver 7/18/2017 Notes :

Facility Code : HNP Applicable Facilities : HNP Document Number : 8-G-0533 S07 Document Revision Number : 018 Document EC Number :

Change Reason : EC0000270291 Document Title : HVAC-AIR FLOW DIAGRAM WASTE PROCESSING BUILDING SHEET 6, UNITS 1 & 2 Mehta, Ameeta Preparer 7/19/2017 Scattergood, Tom Approver 7/19/2017 Notes :

Facility Code : HNP Applicable Facilities : HNP Document Number : 1364-000878 Document Revision Number : 010 Document EC Number :

Change Reason : EC0000412540 Document Title : TURBINE TRIP RUNBACKS & OTHER SIGS W/REQUIREMENTS Pearson, Drew PREPARER 8/1/2018 Morales, Gustavo J APPROVER 8/13/2018 Martinelli, Nick APPROVER 8/13/2018 Notes :

1 2 3 4 5 6 7 8 ATWS SIGNAL 2/3 S.G. LO-LO ATWS SIGNAL 2/3 S.G. LO-LO LEVEL WHEN ABOVE 36.5% LEVEL WHEN ABOVE 36.5%

POWER OR S.G. HI-HI LEVEL POWER OR S.G. HI-HI LEVEL TURBINE RUNBACK OR S.I. (P-14)(SHT-13) OR OR S.I. (P-14)(SHT-13) OR VIA LOAD REFERENCE REACTOR TRIP (P-4)(SHT-13) REACTOR TRIP (P-4)(SHT-13)

EXT TURB TRIPS EXT TURB TRIPS C-3 C-4 F TRAIN-A TPS TRIP TVCS TRIP SOPS TRIP MANUAL TRIP TRAIN-B F (SEE 6-G-0422) (SEE 6-G-0422) (SEE 6-G-0422) (SEE 6-G-0422) C-16 OVERTEMP OVERPOWER (SEE 6-G-0422) (SEE 6-G-0422) TCS HMI STOP LOW TAVG T(2/3) T(2/3) HEATER DRAIN HEATER DRAIN TURB FEEDWATER FEEDWATER TURB LOAD BYPASS (SHEET 9) (SHEET 5) (SHEET 5) PUMP A PUMP B 1ST STAGE PUMP A PUMP B 1ST STAGE (NOTE-10) (NOTE-10)

COMMAND (1364-000872) (1364-000868) (1364-000868) TRIPPED TRIPPED PRESS >90% TRIPPED TRIPPED PRESS >60%

TPS TVCS TRIP TRIP C ZHD2316 C ZFW1801A TCS TRIPS 5 SEC ZHD2317 C ZFW1803A C DELAY LOAD DROP ANTICIPATOR DE-ENERGIZE (NOTE-11) DE-ENERGIZE TURBINE AST QUADVOTER AST QUADVOTER AST QUADVOTER AST QUADVOTER E OVERSPEED SOV A SOV B SOV C SOV D E CONTL ACTIVE 1EH-159A (20-1/AST) 1EH-159B (20-2/AST) 1EH-159C (20-3/AST) 1EH-159D (20-4/AST) 10 SEC PULSE ENERGIZE ENERGIZE OPC QUADVOTER OPC QUADVOTER OPC QUADVOTER OPC QUADVOTER SOV A SOV B SOV C SOV D 1EH-160A (20-1/OPC) 1EH-160B (20-2/OPC) 1EH-160C (20-3/OPC) 1EH-160D (20-4/OPC)

ALB-20 [2-1] A CYCLIC ALB-20 [2-2] A DELETED.

RELAY D CWD 0479 CWD 1356 D TURBINE TRIP STOP TURB REDUCE LOAD REF REDUCE LOAD REF LOADING (10% PER MINUTE) (200% PER MINUTE)

AST 1.5 SEC ON (NOTE-9)

HEADER 30 SEC OFF DRAIN TURB THRUST BEARING TRIP COINCIDENT WITH OPC THROTTLE VALVES AST LOW HDR HEADER PRESS TRIP (CWD 1337)

C DRAIN C DELETED.

INTERCEPT GOVERNOR VALVE VALVE LOW BEARING OIL TRIP (CWD 1572,1575)

B B (1364-000867)

ELECTRONICALLY 10 INCORPORATED: EC 412540 SIGNED ELECTRONICALLY 9 INCORPORATED: EC#284243 SIGNED (1364-000865) (1364-000873) 8 INCORPORATED: ESR0000262 -

REV DESCRIPTION APPROVED DUKE ENERGY QUALITY LEVEL:

QUALITY PLANT: HARRIS PROJECT - UNIT 1 SCALE: N/A A (1364-000867) TITLE: A (1364-000872)

TURBINE TRIP RUNBACKS &

OTHER SIGS W/ REQUIREMENTS PLANT DWG NO.: 1364-000878 1 2 3 4 5 6 7 8

Facility Code : HNP Applicable Facilities : HNP Document Number : 1364-002795 S01 Document Revision Number : 018 Document EC Number :

Change Reason : EC0000412470 Document Title : EH FLUID SYSTEM & LUBE OIL DIAGRAM Brennan, Jerry W. Preparer 5/23/2018 Pitser, Ken approver 5/23/2018 Notes :

Facility Code : HNP Applicable Facilities : HNP Document Number : 1364-002795 S02 Document Revision Number : 018 Document EC Number :

Change Reason : EC0000284337;EC0000284339;EC0000294229 Document Title : E.H. FLUID SYSTEM AND LUBE OIL DIAGRAM Brennan, Jerry W. Preparer 5/4/2018 Pitser, Ken APPROVER 5/5/2018 Notes :

Facility Code : HNP Applicable Facilities : HNP Document Number : 1364-002795 S03 Document Revision Number : 019 Document EC Number :

Change Reason : EC0000284339;EC0000294229 Document Title : 1-2 E.H.FLUID SYS. & LUBE DIA.1-3 Brennan, Jerry W. PREPARER 5/3/2018 Pitser, Ken APPROVER 5/3/2018 Notes :

PT PT PT 4107 4107 4107 A B C T1-C34 LOW BEARING OIL TRIP INCORPORATED: EC 294229, EC 284339 ELECTRONICALLY 19 SIGNED REV DESCRIPTION APPROVED DUKE ENERGY QUALITY LEVEL:

NON NUCLEAR SAFETY PLANT: HARRIS PROJECT - UNIT 1 SCALE: N/A TITLE:

E.H.FLUID SYS. &

LUBE DIA.

PLANT DWG NO.: 1364-002795 S03

Facility Code : HNP Applicable Facilities : HNP Document Number : 1364-003628 Document Revision Number : 017 Document EC Number :

Change Reason : EC0000413175 Document Title : CONDENSATE POLISHER FLOW DIAGRAM TURBINE BLDG. EL. 240.00`

Pearson, Drew PREPARER 10/10/2018 Almond, Erv APPROVER 10/10/2018 Notes :

1 2 3 4 5 6 7 8 1364-3628 DWG. NO.

DESIGN PRESS.-300 PSIG DESIGN TEMP.-140*F OPER. PRESS.-270 PSIG-MAX.

OPER. TEMP.-140*F-MIN.

F F 3" PPL 3" PPL TO AND FROM REGEN. SYSTEM (SEE SHT. 2 OF 3)

(1364-3629) 24" STL. 24" STL.

24" INFLUENT CONDENSATE SUPPLY

  • " STN. STL.

FI FAH

  • " STN. STL FAL FT1CE9030 AC FT1CE9031F 18" 18" PDI FT 12" STL. 3" PPL 12" STL. 3" PPL 12" STL. 3" PPL 12" STL. 3" PPL 12" STL. 3" PPL 11F PDS 3" D1 I DPT
  • " STN. STL PDAH DPS PDS1CE9031F FQ
  • " S.S. 18" FTO A BY FI A FT PDT1CE9034 E VENDOR 19F FAH PCV1CE9034 E (TYP) FAL FR 3" 12" STL. 12" STL. 12" STL. 12" STL. 12" STL. FE1CE9031F FROM SGBD HEAT EXCHANGER OUTLET 12" STL. CPL-2165-G-0045 S01 (G4) 16A 16B 16C 16D 16E 16F 1" STL.

4" S 13F 3"S.L.

24" STL.

1-A 1-B 1-C 1-D 1-E 1-F 6" STL.

RESIN TRANSFER TO & FROM G.O.

SGBD DEMINERALIZERS CPL-2165-G-0051 S02 (N1)

S 3" 14F D D9 D

AIR HOLDING TANK 12" STL. 12" STL. 12" STL. 12" STL. 12" STL.

7CE-V320-1 (TYP. OF 6)

RUN TO 7CE4-244-1 FE1CE9034 7CE2-337-1 " SAMPLE (TO ACID AND CAUSTIC 12" STL.

MAIN UNIT CONDENSATE DEMINERALIZER WASTE SUMP) *" STN. STL.

PI1CE9037 10'-0" I.D. X 4'-0" S.S. - 300 PSIG CODE 12F P *" STN. STL. FI A FT TO SEC. SAMPLING FAH SAMPLE COND. RACK 1X-NNS PDT1CE9032F 6" 6" FT1CE9034 CPL-2165-G-089 S02 (B5-B8) 2" (MECHANICALLY ISOLATED R PDI PER EC 84215)

FLUSH T DPT 900 GPM MAX. PDAH 24" STL. EFFLUENT OUTLET RINSE RECYCLE CONDENSATE SUPPLY TO SAMPLE COND. RACK FOR PUMPS 17F 6" STL.

CA O2A NaA AR C 6" STL. 12" STL. 3" STL. 6" STL. 12" STL. 3" STL. 6" STL. 12" STL. 3" STL. 6" STL. 12" STL. 3" STL. 6" STL. 12" STL. 3" STL. 3" STL. C 15F 8" 8" 12" STL.

24" STL. 24" STL.

6" STL. 3" STL.

3" STL.

6" STL.

3" STL. SLUICE SUPPLY LEGEND D4 TO POLISHERS (SEE SHT. 2 OF 3)

BY EBASCO (1364-3629) 3" STL. SLUICE SUPPLY MANUAL VALVE CHECK VALVE TO SGBD DEMINERALIZERS 7SA1-327-1 G.O.

D3 1" AIR INLET CYL. OPER. WAFER BUTTERFLY CYLINDER OPERATED WAFER 80 TO 90 PSIG 4" VALVE WITH POSITIONER BUTTERFLY VALVE VALVE CHART TAG NO.

FOR THROTTLING MANUAL OPERATED WAFER D1 18" BYPASS 91-75-007 BUTTERFLY VALVE CYL. OPER. WAFER BUTTERFLY 6" D3 4" DRAIN TO WASTE 91-75-006 VALVE WITH STOP FOR ELECTRONICALLY PLUG VALVE RATE CONTROL D9 6" RECYCLE TO INLET HEADER 91-75-005 17 INCORPORATED: EC# 413175 SIGNED B PPL - POLYPROPYLENE D4 1" AIR INLET VALVE 91-75-079 B

11A TO 11F 12" CONDENSATE INFLUENT 29-75-003 ELECTRONICALLY PLUG VALVE WITH S.S. - #316 STAINLESS STEEL 12A TO 12F 12" CONDENSATE EFFLUENT 29-75-004 16 INCORPORATED: EC# 84215 (C8,D7)

SIGNED OPERATOR 13A TO 13F 3" MIXED RESIN INLET 29-75-007 RINSE TO WASTE STL. - STEEL 14A TO 14F 3" MIXED RESIN OUTLET 29-75-008 RPP PANEL MOUNTED AC AIR CONTROL INCORPORATED: ESR-9500153 CC CONDUCTIVITY CELL 15A TO 15F 6" RECYCLE OUTLET & DRAIN 29-75-005 15 10/24/00 (C6,C7)

ARM WFL FOR DLS 16A TO 16F 1" VENT - PLUG VALVE 29-75-013 FAH HIGH FLOW ALARM 17A TO 17F 3" SLUICE INLET 29-75-006 WASTE SUMP INCORPORATED: ESR 99-00325 FAL LOW FLOW ALARM 19A TO 19F f" PLUG VALVE BYPASS 29-75-014 14 4/29/00 (E7)

ARM RPP DLS FI FLOW INDICATOR LOCAL MOUNTED INCORPORATED: ESR-9500153 FQ FLOW INTEGRATOR 13 12/30/99 (C4,C5,D5)

ARM RPP DLS FR FLOW RECORDER FIELD MOUNTED FT FLOW TRANSMITTER REV DATE DESCRIPTION DWN CHK DPPE FTO FLOW TOTALIZER ORIFICE PLATE CAROLINA POWER AND LIGHT COMPANY P PRESSURE INDICATOR SHEARON HARRIS NUCLEAR PLANT ORIFICE NIPPLE PDAH HIGH DIFF. PRESS. ALARM WAKE COUNTY-NORTH CAROLINA DUKE ENERGY PDI DIFF. PRESS. INDICATOR PROJECT NO.-CAR-SH-N-10 COCHRANE PIPING LIMITS UNIT NO. 1 NUCLEAR ENGINEERING DEPARTMENT PDS DIFF. PRESS. SWITCH P.O. # NY-435100 DPT DIFF. PRESS. TRANS.

A ANNUBAR NaR SODIUM RECORDER PLANT: HARRIS NUCLEAR PROJECT UNIT-1 SCALE: NONE A ELECTRICAL NaA SODIUM ALARM COCHRANE DIVISION TITLE: A R

RESIN TRAP S SIGHT GLASS CRANE CO.

T O2A OXYGEN ANALYZER MANUFACTURING ENGINEERS CONDENSATE POLISHER FLOW SIGHT GLASS O2R OXYGEN RECORDER KING OF PRUSSIA, PA. 19406 FLOW DIAGRAM CA CONDUCTIVITY ANALYZER TURBINE BLDG. EL. 240.00' DIAPH. OPER. SAUNDERS PAT. AR MULTIVARIABLE RECORDER VALVE-SPRING TO CLOSE DWG NO.

G.O. GEAR OPERATED 179522 REV. A PLANT SHT.1 0F 3 DWG NO.: 1364-003628 1 2 3 4 5 6 7 8 CAD FILE:CAD

Facility Code : HNP Applicable Facilities : HNP Document Number : 1364-097532 Document Revision Number : 005 Document EC Number :

Change Reason : EC0000409949 Document Title : FILTRATION SYSTEM P&ID Pearson, Drew PREPARER 4/5/2018 Hughes, Daryl W APPROVER 4/5/2018 Notes :

1 2 3 4 5 6 7 8 1"Ú S.S.

DEMIN WATER BY VENDOR HS NOTES:

F 310 F 2x*

1. USE OF POLY INJECTION POINT CONFIGURATION TO BE CONTROLLED VIA PROCEDURE AND CHANGED O.F. @ 0.7 GAL I DO 1"Ú SS 150 PSI TO 150 PSI TO VIA WR/WO. OUT OF SERVICE INJECTION LINES f"NPT AS-80 f"NPT AS-80 TO BE CAPPED OR PLUGGED WHEN NOT IN USE.

T-5

2. pHIT-425 TO MONITOR AND DISPLAY INFLUENT pH LEVEL ON POLYMER AUDIO CP-1 TO TO CP-1. IF pH IS GREATER THAN 9, VISUAL AND FEED B31.1 HV-157 HV-167 HV AUDIO ALARMS OCCUR.

TANK 2x1 107 ASME VIII LAH (TYP F-50 & F-60) 310 CP-1

3. pH TO BE RECORDED ON RECORDER R-100.

HV M 106 M-110 DO

4. TUIT-430 TO MONITOR AND DISPLAY INFLUENT TURBIDITY LEVEL AUDIO SLUICE SLUICE

' "NPT HV CP-1 CONN. CONN. ON CP-1.

103 LSH POLY INJECTION POINT 95 GAL DI 1/2"Ú 310 (NOTE 1)

"NPT 1/2"Ú LAL 5. HIGH TURBIDITY TO BE ALARMED ON CP-1.

310 CP-1 HV P-105 108 T-10 6. CIT-435 TO MONITOR AND DISPLAY INFLUENT CONDUCTIVITY CLOSE CV-325 F-50

' "NPT POLYMER DO LI STOP M-110 F-60 LEVEL ON CP-1, AND TO CONTROL POLYMER FEED PUMP MP-115.

310 MIXING (NOTE 12) (NOTE 12)

E TANK HS FIGURE 1-STATIC MIXER ASSEMBLY 7. TURBIDITY TO BE RECORDED ON RECORDER R-100.

E 315 (NOTE 13) 1/2"Ú 1/2"Ú LSL 8. FIT-470 TO MONITOR AND DISPLAY OUTPUT FLOW ON CP-1, 25 GAL DI 310 I AO AND TO REGULATE FLOW WITH MODULATING FLOW CONTROL HV VALVE FCV-370 WITHIN 15 GPM.

109 M

1"Ú

9. LOW FLOW (BELOW 13.5 GPM) TO BE ALARMED ON CP-1.

1x1/2 SAMPLE 1" PVC 1" PVC 1/2"Ú TUBING TUBING PORT POLY POLY RAD Q INLINE 10. BLOWDOWN AIR SUPPLY TO FILTERS F-50 AND F-60 TO NON MP-115 INJECTION PT. INJECTION PT.

CHECK VALVE HV HV (NOTE 1) (NOTE 1) BE REGULATED TO 6O PSI WITH PRESSURE REGULATOR 111 112 RAD Q PCV-375. (FILTERS DESIGNED FOR 150 PSI)

  • "NPT
11. SEE 1364-097536 FOR P&ID LEGEND.

POLYMER FEED SKID 0-150 PSI NOTE 13 NOTE 13 NON RAD- Q RV 80 PSI 175 TO

12. VESSELS & PIPE SPOOLS WITH HOSE ATTACHMENTS

'"Ú Cu TUBING '"Ú Cu TUBING f"NPT TO TO FC-370 SAMPLE AUDIO SAMPLE GRAB AUDIO GRAB SUPPLIED BY ENERGY-SOLUTIONS (1364-099293).

CP-1 SINK SAMPLE CP-1 SINK SAMPLE

'"Ú Cu TUBING

13. STATIC MIXER ASSEMBLY (SEE FIGURE 1) SHALL BE INSTALLED IN ONE OF THREE LOCATIONS
  • "NPT DPL DPL UPSTREAM OF PRE-FILTER F-40, FILTER F-50 60 PSI 355 CP-1 365 CP-1 2"Ú SS 2"Ú SS f"Ú C.S. (BY OWNER) *"Ú Cu OR FILTER F-60.

D D RAD- Q PI 175 HV HV * " HV HV 149 152 159 162 CONTROL CONTROL CV-325 COMPRESSED AIR DO DO 0-150 PSI FCV-370 FCV-370 f" f" f" f"

' "Ú ' "Ú ' "Ú 60 PSI 1"Ú C.S. (BY OWNER) *"Ú Cu DI DI PI R R HV PCV R 173 100 CP-1 100 CP-1 174 375 3/4x1/2 3/4x1/2 100 CP-1

  • "Ú Cu FCM '"NPT 325 3/4x1/2 INSTRUMENT AIR 370 pHE S CE f"Ú SS FE 425 435 470 HV HV 1* "NPT TEST HV
  • "NPT ' "NPT 136 CONN 179 138 (BYPASS) 3/4x1/2 '"NPT FCV HV HV HV 370 (BY OWNER) *"PLUGGED 1"NPT '"NPT f"NPT f"NPT PLUGGED 148 HV 153 163 158 TUE 2"Ú SS 2"Ú S.S. 2"Ú S.S. TO PRESSURE VESSEL INFLUENT 430 MODULES C FC MODULATING C 2"Ú SS (BY OW NER) 2"Ú SS (BY OW NER)

VALVE TUIT HV CV (BY OWNER) 430 121 325 1

2"Ú f"Ú SS 2"Ú SS f"CAPPED EXHAUST 2"Ú SS (BY OWNER)

  • "Ú NPT
  • SS 2"Ú SCREEN MESH (BY OWNER) 1"Ú SS M-40 FROM HV-145 GRAB INLINE MIXER fX* *"Ú SAMPLE f"Ú f"Ú FROM F-60
  • "Ú VENT TO AS-80 (VENT) 2"Ú HV 167 HV NOTE 13 145 fX* *"Ú 2"Ú OF CP-1 FROM F-50 AS-80 CONTROL (VENT) AIR HV (BY OWNER)

PANEL 157 SEPARATOR FLOOR DRAIN f"Ú PLC FROM F-60 (RELIEF)

TD-45 f"Ú PREFILTER R HV 100 TIME DELAY FROM F-50 180 (1364-099297 S01) DRAWN BY DATE CHAMBER (RELIEF)

B B f"Ú SS RGD 04-25-96 THD CAP DESIGNED BY DATE FLOOR DRAIN RGD 04-25-96 HV MECH-CHEM ASSOCIATES, Inc. NORFOLK, MA NORTH OLMSTED, OH 146 COMPANY CHECKED BY DATE 2"Ú WMG, Inc.

MM 04-25-96 f"Ú 4 9-5-96 RGD JAT MM AS-BUILT Peekskill, NY MIXING SKID 3 7-12-96 RGD JAT MM MODIF'S PER OWNER COMMENTS TITLE ENG. APPROVAL DATE FILTRATION SYSTEM MM 04-25-96 2 6-12-96 RGD JAT MM DESIGN MODIFICATIONS P&ID SCALE - D SIZE ORIG. ISSUE DATE DRAWING NO. SHEET NO. REVISION NO.

FLOOR 1 6-9-96 RGD JAT MM DESIGN MODIFICATIONS DRAIN REV. DATE REV'D BY CHK'D BY APP'D BY DESCRIPTION NONE 04-25-96 WMG-264-02 1 OF 1 4 ELECTRONICALLY 5 INCORPORATED: EC 409949 (B1,D4-D7,E4,E5,F7)

SIGNED ELECTRONICALLY 4 INCORPORATED: EC 400448 (D4-F7, C1, B5)

SIGNED 3 1/28/99 INCORPORATED: ESR-9500565 (R/4) ARM RPP DLS (C6-D6)

REV DATE DESCRIPTION DWN CHK APPR'D PROFESSIONAL ENGINEER:

A QUALITY LEVEL:

A RADWASTE Q DUKE ENERGY NUCLEAR ENGINEERING DEPARTMENT PLANT: HARRIS PROJECT - UNIT 1 SCALE: NONE TITLE:

FILTRATION SYSTEM P&ID 1364-097532 PLANT DWG NO.:

1 2 3 4 5 6 7 8

Facility Code : HNP Applicable Facilities : HNP Document Number : 1364-093034 Document Revision Number : 004 Document EC Number :

Change Reason : EC0000402153 Document Title : ASSEMBLY LONGITUDINAL SECTION THRU TURBINE NSSS TURBINE Boudreaux, Sheryl S. PREPARER 6/26/2018 Barfield, Alfred L. APPROVER 6/26/2018 Notes :

1 2 3 4 5 6 7 8 E E D D C C B B ELECTRONICALLY 4 INCORPORATED: EC 402153 SIGNED REV DESCRIPTION APPROVED A

DUKE ENERGY A QUALITY LEVEL:

NON-SAFETY RELATED PLANT: HARRIS PROJECT - UNIT 1 SCALE: N/A TITLE:

ASSEMBLY LONGITUDINAL SECTION THRU TURBINE NSSS TURBINE PLANT DWG NO.: 1364-093034 1 2 3 4 5 6 7 8