17 1 8 ANCHOR BOLT SCHEDULE CAR-2167 C-2771 S
H N
EX UT TYPE I L
56'-7%
L VARIES -~~~sE_E 15'-11 e PLAN ON G-2770 32'- 7 i----
7 I
TYPE I11 TYPE IV TYPE I 1 END OF
/KEY EL.
TACK NUT TO WELO B O. L T. \\
265.50' I 7 ' 4 /
J'-6b KEEP SLEEVE FREE INSIDE FROM ADUJSTABLE BOLT B
C f)
E F
G H
I J
K -
L M
FOR STEEL STAIR AND CONNECTIONS SEE 2 1 6 8 - G - 6 W /
BOTTOM OF E FLUSH--/
WITH CONC OFFIT TYPE V x0'=8LG
' A.B.(BY FIELD) 3"THD 4 HEX NUTS.
7 I-I t I
I I
TOP OF CONC.
PADS E L
1 1
(BY FIEL6')
I tLtV.
dARK NO. DIA.TYPE LENGTH BOLT NO.
NO. DIA. LENGTH NO.
SIZE OF LENGTH THR'D c
[ CONSTRUCTION JOINT P OF COOLING WER FOUNDATION HP. EL. 255.50' ERSTOP BY COOLING WER VENDOR PREMOULDED END OF ws EL.
265.00' EL. 260.50'
-I 8
00 I il
- PROJECT 2% FROM INSIDE FACE OF WALL NOTE: ALL EXPOSED ANCHOR BOLTS AND OTHER STEEL SURFACES SHALL BE HOT DIPPED GALVANIZED I N ACCORDANCE WITH ASTM A-123.
KEY AND I-- WATER STOP HANDRAIL 8c POST HANDRAIL
& POST (GALV)
I 4
BRACKET 3 r..'...
.A,.
'*.'&?.
BOT. OF MAT EL. 238.33' EDGE OF MIN.
TOP OF MAT OR O U T S 1 0 7 FACE OF I
c Y
l0'-0 6'-0 10'-0 S E CT. A - A (G-2770/812)
WALL i 6 PVC I
WATERSTOP i
?Ifi LEAD GASKET (BY FIELD) 3-%$
2 UNIT
~~.~ 4; STAR SLUGIN COMPOUNDED I
ANCHOR OR EQUAL (BY FIELD) a PUMPS REMOVABLE HANDRAI L'-\\
I I
\\
PLAN SECT.
FOR DETAILS SEE SECT.
0- O( I IS) -/
DET E3 (D6)
NTS (2 REQ'D)
TYP DET AT REMOVABLE RAIbING ( G - 2 7 ~ 1 4 )
t t i I
NTS TYP KEY DET.
NTS E31 A.B.
~
TOP OF SLAB FOR LOCATION e
FOR QUANTITIES, NOTES & REFERENCE DWGS SEE 2167-G--2770 NOTE 1: GROUT AROUND PUMP SUPPORT PLATE SHALL BE ACCORDANCE W/EBASCO SPEC NON-SHRINKING TYPE I N CAR-SH-CH-6 SECT. C-CW)
(2 REQ'D)
SECT D-D (G-Z?70/J17) 3/4=1'-0 NTS 4
XI I
I
- +
FOR EL. SEE x
I NTAK E
& CANAL I
EMB, I?- FLUSH
[ W A C OF CONC I TVP.
TYP SECT AT EMBE R 'S I
x 6 WORK THIS DWG WITH DWG 2 167-G-2770 INCORP.: EC# 71308 (04, 05, 15, 16) 1 ELECTRONICALLY SIGNED THIS ORAWING HAS BEEN ELECTRONI~ALLY KPB 7 9/17/93 TAG r/)
TYPE W1 m'
TYPE FI I
FOR Fil, LENGTH AND LOCATION SEE PLAN AND SECTIONS I
I I
I I
I I
i I
T 1
I OWN I CHK APPR'D I REV I DATE I DESCRIPTION I
TYP EMBEDDED
~
DET'S.
C Ff'T F - F ( ~ ~. ~ ', - 7 7 7 1 7 5 / ~ ~ 1., 1 ~
THIS DRAWING HAS BEEN PRODUCED AND IS CONTROLLED ON THE NED CAD/ SYSTEM. ANY RFVlClnNC T n TH1C nnPllUFNT CHfNlln RF nnNF IICTNC THF [IAI)/F SYCXFM TO ACSlJRF PROPFR CONTRoL OF THE ELECTRONIC DRAWING DATABASE.
i I
IN NUCLEAR SAFETY RELATED (Q-LIST) y~sl-1
~0-1 P A R T I A L 0 F. P. 4 E Z I R.W.--Q CAROLINA POWER & LIGHT COMPANY NUCLEAR ENGINEERING DEPARTMENT - RALEIGH, N.C.
TITLE:
I DWG NO.
I I
CIRCULATING WATER SYSTEM CAR-2167 COOLING TOWER INTAKE STRUCT.
G-2771
& CANAL SH.2 MAS UN.l
a
/---
'c I
t t
I '
I I
I I
I I
I P
d
--=,a I
I I
I FL, T
M a-
I 1
I "c,
Y
.i I
t I
I L
I e
'I
/
I 3,CZ - e 215AB.- I e
TNtS DOCUMENT I$ DlELIVIEIED IN ACCOUOhCE.WITH AND 1S UIBJlECT TO THE *?ROVtSIONS OF SECTlbw X O f THE COW*.
TRACT BETWEEN-CAROLINA *POWER a LIGHT COM?ANY AN@
- I.
I
~
e
A B
C D
E F
G H
1 CAR-2168 G-517 SO5 (MISSILE NOTES b C - )ci 2 15 EJ-I FROM CONTAINMENT VACUUM RELIEF INTAKE. FOR CONT, SEE DWG CAR 2168--G--517(K1)
( N G )
FOR S E E r
\\
a AC-G D 5 S A - I
/-
/-
(;I 0 CFM (S)
- r--- FE-IAV-6632s \\
n! 6 C
D E
F G
4 I
J K
L BLANKED-0 FF
~
~
W C
F M
(N&S)
L. EHG-IO(IX-SN)
AC-D3SA-4 (N.C.)
SEE NOTE 9 U
f-
,f NOTE 10 h
\\ c I
6 0 0 C l l t ~
( N ~ P )
I640 AUX ELC. EQUIP. RIvllA*Zq7 (PIC CABIElET)
--1 A C - D 8 S A 4 /r CN, c.)
I SWITCHGEAR ROOM "A" A.C, UNIT 2575 i I SAFETY' C L A S S A (E%CEPT AS NOTED)
I U
- 9. POWER TO DAMPER MOTOR HAS BEEN REMOVED BUT MOTOR REMAINS INSTALLED.
DAMPER TO REMAIN I N CLOSED POSITION, 6300 (TO VENT 3000 CFM T O ATMOSPWSRE 4,/-'
( MISSt LE PROTECTED)
- 10. MAKE-UP FOR 3000 CFM EXHAUSTED DURING SMOKE PURGE AND NORMAL OPERATION I S FROM LEAKAGE INTO ROOMS FROM ADJACENT AREAS.
11, HVAC DUCTS TO & FROM CABLE VAULT "B" (COL 41-43 & E-B)
HAVE BEEN BLANKED OFF WITH BLIND FLANGES.
0 CFM (sj L
I /
111-lNll A
I !
I FE-IAV-6642s L
A C
- D5S B - 1 (NQSEE NOTE 9 Y
/
LEHC-12 (1%-SN) 31,830 CFM (P) 28,830 CFM (N) 24,750 CFM (S)
FROM CONTAINMENT VACUUM RELIEF INTAKE FOR CONTINUATION SEE I
DWG. CAR - 2 168 -G - 5 17 0-2)
W J
K D
4,050 VENT CFM STACK)
F--
E H C 23 ( I X -5N) *-\\
I I 3cz-B35sB
-1 L
U r & V ROOM NOp247 30 C F M 1
I!b,OOO GFM AH-l6( IA-SA) J 7
A H 4 6 ( I B - S B )
SMOKE FURG!
SYSTEM INCORPORATED: EC78555 & EC78556 (A14,Bl,B9,CZ,C7,C12)
ELECTRONICALLY 1
SIGNED AND DATED I
I INCORP~RATED: EC 62848 (H9-HI3, 110-113)
I I
I ELECTRONICALLY 1
SIGNED AND DATED INCORPORATED: EC 63853 (L10-LIZ, M10-Ml4, N9, N13) 1 SIGNED ELECTRONICALLY AND DATED CORRIPOR UNIT 2 5lD EWC-2%(lX-ShI)
FE-IAV-6613BS l9 1 INCORPORATED: EC 62847 (D1,DZ) 1 SIGNED ELECTRONICALLY AND DATED 300 CFM
\\
APPR'D DWN CHK DESCRIPTION REV THIS DRAWING HAS BEEN PRODUCED AND I S CONTROLLED ON THE NED CAD/E SYSTEM. ANY REVISIONS TO THIS DOCUMENT SHOULD BE DONE USING THE CAD/ SYSTEM TO ASSURE PROPER CONTROL OF THE ELECTRONIC DRAWING DATABASE.
(ELECTRIC)
EQUIPMENT PROTECTION
/-
NUCLEAR SAFETY RELATED (Q-LIST)
YES-N O
0 PARTIAL-F. P. - Q O R. W. - Q I ROOMS VENTILATION SYSTEh4 PROTECTIQd 6 CONTROL EQUIPMENT ROOM SAFETY CLASS A (EXCEPTAS NOTED)
CAROLINA POWER 8c LIGHT COMPANY NUCLEAR ENGINEERING DEPARTMENT - RALEIGH, N.C.
NONE SCALE:
PLANT HARRIS NUCLEAR PROJECT - UNIT 1 I
DWG NO.
HVAC-REACTOR AUXILIARY BLDG.
I TITLE:
CAR-21 68-G-517 S05 SWITCHGEAR 8c PROTECTION RM.
AIR FLOW DIAGRAM UNIT - 1
1 2
3 c
4 s
6 7
8 9 I 1 0 11 1 2 1 3 14 I
151 1 6 17 1 8 1 9 A
B C
D E
F G
H I
J K -
CAR-2168 G-533S04 A
B I
C D
D I
n F
m z
111 H
I J
K lssll L
M
\\ 3a,uoo CFM FOR CONT. SEE DWG CAR-2168 G-533 S02 (B-16)
I 3R CQNT E DWG 47550 CFkl FOR CONT. SEE DWG CAR-2168 G-533 S03 (B-15) t I-AE-+IWV-SSSI*
I w v - or59-1-4
/--
d c2 Q
d w
0 U
c 1
I I
I L
I I
t I
t I
I I
- NOTES:
EQUIPMENT ABANDONED I N PLACE
- 1. AIR FLOW QUANTITIES SHOWN ARE BASED ON A DENSITY OF 0.075 LB FT3 OCCURRING AT THE
& 29.92"Hg BAROMETRIC PRESSURE.
RATES BASED ON DENSITY AT DES'N. CONDITIONS.
INTENDED TO INDICATE THE ACTUAL SEQUENCE OF DUCT CONNECTIONS AS THEY OCCUR ON THE PHYSICAL DRAWINGS.
PHYSICAL DWGS.
STANDARD CONDITION 0 1 DRY AIR AT 70T
- 2. PARENTHESIZED QUANTITIES ARE ACTUAL AIR FLOW
- 3. AIR FLOW DIAGRAMS ARE SCHEMATIC & ARE NOT
- 4. FOR LOCATION OF BALANCING DAMPERS REFER TO
- 5. FOR LEGEND, SYMBOLS 8c GEN NOTES SEE DWGS
- 6. ALL SYSTEMS ARE NNS (CLASS&
7.(0) MAX. AIR QUANTITIES OCCUR WHEN VOLUME CAR-2168 G-528 S01 & CAR-2168 G-528 S02.
P U M P SKID - FILTER ADSUR8ER p AIR BLOWER. AREA 0 CFM FROM STAIRS/
/
,/
FORMER PUMP - SKID F t LTER AOSORBER AIR 6LOWEE AREA I350 CFM -
It-,- -
PRECONCENTRATOR 5CRc)BBER 1
I z
I 750 CF -
I-REDUCTION SYSTEM I S OFF AND C-1 I S I N OPERATION.
a (b) 0 CFM OCCURS WHEN BOTH VOLUME REDUCTION (c) NORMAL CFM OCCURS WHEN VOLUME REDUCTION SYSTEM AND C-1 ARE OFF.
SYSTEM I S I N OPERATION.
- 8. FOR FE'S & AEbS TYPE AND CONNECTION TO ISOKINETIC SAMPLING AND RADIATION MONITORS SEE SPEC. NO. CAR-SH-IN41 5EPAWTOR AREA -
I----
I I
\\CFM FLUID BED DRYR $ GAS/SOLl SEPA F? ATOR ARA 4
Y FLUID BED DRYER (SOUTH)
DRUM STORAGE AREA REFERENCE DRAWINGS LIST OF DRAWINGS HVAC-WPB PLN. SH 3 EL.261.0' HVAC-WPB PLN. SH 4 EL.276 &
CAR 1364-A125 CAR 2168-G-495 S03 291 CAR 2168-G-495 S04 I
\\
EoCFM I
1
\\
r k
I c
TRUCK LOADING AREA AIR HEATER & LOCAL CONTROL PANEL AREA I
30'30 CFM
-0 I
I AIR HEATER I
PROCESS PIPING AND AIR BLOWER BY MECH SEE DWG CAR-2165-G-846 SO2 AIR BLOWER I
1-46-NNS CFM(MGX) 0 CFM[MIN)
I DRUM INSPECTION & LABEL'G. STATION (NORTH)
I a
S E E NOTE 7 B Y HVAC W.P.8,. L 291.00' CONTROL PANEL AREA (E15 400 cw J I I I I
I I 1 I
I THIS DRAWING HAS BEEN ELECTRONICALLY REPRODUCED WITHOUT DESIGN CHANGE I
I 1 RPP I
N 11-11-97.
INCORPORATED ESR 9500995(PARTIAL TURNOVER PER REV 4) (A6,C12,D12, E14-L3-L5, E16,F13,F16,J7,J9-L8,L9,L10, L11, L13,Mll J12,K7-
,M 13) K13, REV DESCRIPTION DWN DATE 0 -
CFM DECANTING STATION (WEST)
I I
THIS DRAWING HAS BEEN PRODUCED AND I S CONTROLLED ON THE NED CAD/E SYSTEM. ANY REVISIONS TO THIS DOCUMENT SHOULD BE DONE USING THE CAD/E SYSTEM TO ASSURE PROPER CONTROL OF THE ELECTRONIC DRAWING DATABASE.
NUCLEAR SAFETY RELATED (Q-LIST)
W.P.B.
EL. 276.00' t f DECANTING STATION (EAST)
YES-NO-R.W.-Q P A R T I A L U F. P. - Q a I
CAROLINA POWER & LIGHT COMPANY NUCLEAR ENGINEERING DEPARTMENT - RALEIGH, N.C DRUMMING STATION DECANTING STATION &
BRIDGE CRANE AREA HARRIS NUCLEAR PROJECT - UNIT 1 PLANT:
NONE SCALE:
W.P.B. EL. 261.00' 1
I TITLE:
HVAC-AIR FLOW DIAGRAM WASTE PROCESSING BUILDING SHEET 3 UNITS 1 & 2 DWG NO.
CPL-2168-HNP DOCUMENT CONTROL G-553 S04 I
2 3
I 4 3
6 7
8 9
I 1 0 11 12 1 3 14 I is 17 1 8