ML18337A392

From kanterella
Jump to navigation Jump to search
UFSAR Rev 61, Drawings, Part 6
ML18337A392
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/10/2017
From: Hamilton T
Duke Energy Progress
To:
Office of Nuclear Reactor Regulation
Barillas M DORL/LPL2-2 301-415-2760
Shared Package
ML18337A205 List:
References
HNP-17-029
Download: ML18337A392 (21)


Text

17 1 8 ANCHOR BOLT SCHEDULE CAR-2167 C-2771 S

H N

EX UT TYPE I L

56'-7%

L VARIES -~~~sE_E 15'-11 e PLAN ON G-2770 32'- 7 i----

7 I

TYPE I11 TYPE IV TYPE I 1 END OF

/KEY EL.

TACK NUT TO WELO B O. L T. \\

265.50' I 7 ' 4 /

J'-6b KEEP SLEEVE FREE INSIDE FROM ADUJSTABLE BOLT B

C f)

E F

G H

I J

K -

L M

FOR STEEL STAIR AND CONNECTIONS SEE 2 1 6 8 - G - 6 W /

BOTTOM OF E FLUSH--/

WITH CONC OFFIT TYPE V x0'=8LG

' A.B.(BY FIELD) 3"THD 4 HEX NUTS.

7 I-I t I

I I

TOP OF CONC.

PADS E L

1 1

(BY FIEL6')

I tLtV.

dARK NO. DIA.TYPE LENGTH BOLT NO.

NO. DIA. LENGTH NO.

SIZE OF LENGTH THR'D c

[ CONSTRUCTION JOINT P OF COOLING WER FOUNDATION HP. EL. 255.50' ERSTOP BY COOLING WER VENDOR PREMOULDED END OF ws EL.

265.00' EL. 260.50'

-I 8

00 I il

  • PROJECT 2% FROM INSIDE FACE OF WALL NOTE: ALL EXPOSED ANCHOR BOLTS AND OTHER STEEL SURFACES SHALL BE HOT DIPPED GALVANIZED I N ACCORDANCE WITH ASTM A-123.

KEY AND I-- WATER STOP HANDRAIL 8c POST HANDRAIL

& POST (GALV)

I 4

BRACKET 3 r..'...

.A,.

'*.'&?.

BOT. OF MAT EL. 238.33' EDGE OF MIN.

TOP OF MAT OR O U T S 1 0 7 FACE OF I

c Y

l0'-0 6'-0 10'-0 S E CT. A - A (G-2770/812)

WALL i 6 PVC I

WATERSTOP i

?Ifi LEAD GASKET (BY FIELD) 3-%$

2 UNIT

~~.~ 4; STAR SLUGIN COMPOUNDED I

ANCHOR OR EQUAL (BY FIELD) a PUMPS REMOVABLE HANDRAI L'-\\

I I

\\

PLAN SECT.

FOR DETAILS SEE SECT.

0- O( I IS) -/

DET E3 (D6)

NTS (2 REQ'D)

TYP DET AT REMOVABLE RAIbING ( G - 2 7 ~ 1 4 )

t t i I

NTS TYP KEY DET.

NTS E31 A.B.

~

TOP OF SLAB FOR LOCATION e

FOR QUANTITIES, NOTES & REFERENCE DWGS SEE 2167-G--2770 NOTE 1: GROUT AROUND PUMP SUPPORT PLATE SHALL BE ACCORDANCE W/EBASCO SPEC NON-SHRINKING TYPE I N CAR-SH-CH-6 SECT. C-CW)

(2 REQ'D)

SECT D-D (G-Z?70/J17) 3/4=1'-0 NTS 4

XI I

I

  1. +

FOR EL. SEE x

I NTAK E

& CANAL I

EMB, I?- FLUSH

[ W A C OF CONC I TVP.

TYP SECT AT EMBE R 'S I

x 6 WORK THIS DWG WITH DWG 2 167-G-2770 INCORP.: EC# 71308 (04, 05, 15, 16) 1 ELECTRONICALLY SIGNED THIS ORAWING HAS BEEN ELECTRONI~ALLY KPB 7 9/17/93 TAG r/)

TYPE W1 m'

TYPE FI I

FOR Fil, LENGTH AND LOCATION SEE PLAN AND SECTIONS I

I I

I I

I I

i I

T 1

I OWN I CHK APPR'D I REV I DATE I DESCRIPTION I

TYP EMBEDDED

~

DET'S.

C Ff'T F - F ( ~ ~. ~ ', - 7 7 7 1 7 5 / ~ ~ 1., 1 ~

THIS DRAWING HAS BEEN PRODUCED AND IS CONTROLLED ON THE NED CAD/ SYSTEM. ANY RFVlClnNC T n TH1C nnPllUFNT CHfNlln RF nnNF IICTNC THF [IAI)/F SYCXFM TO ACSlJRF PROPFR CONTRoL OF THE ELECTRONIC DRAWING DATABASE.

i I

IN NUCLEAR SAFETY RELATED (Q-LIST) y~sl-1

~0-1 P A R T I A L 0 F. P. 4 E Z I R.W.--Q CAROLINA POWER & LIGHT COMPANY NUCLEAR ENGINEERING DEPARTMENT - RALEIGH, N.C.

TITLE:

I DWG NO.

I I

CIRCULATING WATER SYSTEM CAR-2167 COOLING TOWER INTAKE STRUCT.

G-2771

& CANAL SH.2 MAS UN.l

a

/---

'c I

t t

I '

I I

I I

I I

I P

d

--=,a I

I I

I FL, T

M a-

I 1

I "c,

Y

.i I

t I

I L

I e

'I

/

I 3,CZ - e 215AB.- I e

TNtS DOCUMENT I$ DlELIVIEIED IN ACCOUOhCE.WITH AND 1S UIBJlECT TO THE *?ROVtSIONS OF SECTlbw X O f THE COW*.

TRACT BETWEEN-CAROLINA *POWER a LIGHT COM?ANY AN@

  • I.

I

~

e

A B

C D

E F

G H

1 CAR-2168 G-517 SO5 (MISSILE NOTES b C - )ci 2 15 EJ-I FROM CONTAINMENT VACUUM RELIEF INTAKE. FOR CONT, SEE DWG CAR 2168--G--517(K1)

( N G )

FOR S E E r

\\

a AC-G D 5 S A - I

/-

/-

AC - D7SA-1 d

(;I 0 CFM (S)

n! 6 C

D E

F G

4 I

J K

L BLANKED-0 FF

~

~

W C

F M

(N&S)

L. EHG-IO(IX-SN)

AC-D3SA-4 (N.C.)

SEE NOTE 9 U

f-

,f NOTE 10 h

\\ c I

6 0 0 C l l t ~

( N ~ P )

I640 AUX ELC. EQUIP. RIvllA*Zq7 (PIC CABIElET)

--1 A C - D 8 S A 4 /r CN, c.)

I SWITCHGEAR ROOM "A" A.C, UNIT 2575 i I SAFETY' C L A S S A (E%CEPT AS NOTED)

I U

9. POWER TO DAMPER MOTOR HAS BEEN REMOVED BUT MOTOR REMAINS INSTALLED.

DAMPER TO REMAIN I N CLOSED POSITION, 6300 (TO VENT 3000 CFM T O ATMOSPWSRE 4,/-'

( MISSt LE PROTECTED)

10. MAKE-UP FOR 3000 CFM EXHAUSTED DURING SMOKE PURGE AND NORMAL OPERATION I S FROM LEAKAGE INTO ROOMS FROM ADJACENT AREAS.

11, HVAC DUCTS TO & FROM CABLE VAULT "B" (COL 41-43 & E-B)

HAVE BEEN BLANKED OFF WITH BLIND FLANGES.

0 CFM (sj L

I /

111-lNll A

I !

I FE-IAV-6642s L

A C

- D5S B - 1 (NQSEE NOTE 9 Y

/

LEHC-12 (1%-SN) 31,830 CFM (P) 28,830 CFM (N) 24,750 CFM (S)

FROM CONTAINMENT VACUUM RELIEF INTAKE FOR CONTINUATION SEE I

DWG. CAR - 2 168 -G - 5 17 0-2)

W J

K D

4,050 VENT CFM STACK)

F--

E H C 23 ( I X -5N) *-\\

I I 3cz-B35sB

-1 L

U r & V ROOM NOp247 30 C F M 1

I!b,OOO GFM AH-l6( IA-SA) J 7

A H 4 6 ( I B - S B )

SMOKE FURG!

SYSTEM INCORPORATED: EC78555 & EC78556 (A14,Bl,B9,CZ,C7,C12)

ELECTRONICALLY 1

SIGNED AND DATED I

I INCORP~RATED: EC 62848 (H9-HI3, 110-113)

I I

I ELECTRONICALLY 1

SIGNED AND DATED INCORPORATED: EC 63853 (L10-LIZ, M10-Ml4, N9, N13) 1 SIGNED ELECTRONICALLY AND DATED CORRIPOR UNIT 2 5lD EWC-2%(lX-ShI)

FE-IAV-6613BS l9 1 INCORPORATED: EC 62847 (D1,DZ) 1 SIGNED ELECTRONICALLY AND DATED 300 CFM

\\

APPR'D DWN CHK DESCRIPTION REV THIS DRAWING HAS BEEN PRODUCED AND I S CONTROLLED ON THE NED CAD/E SYSTEM. ANY REVISIONS TO THIS DOCUMENT SHOULD BE DONE USING THE CAD/ SYSTEM TO ASSURE PROPER CONTROL OF THE ELECTRONIC DRAWING DATABASE.

(ELECTRIC)

EQUIPMENT PROTECTION

/-

NUCLEAR SAFETY RELATED (Q-LIST)

YES-N O

0 PARTIAL-F. P. - Q O R. W. - Q I ROOMS VENTILATION SYSTEh4 PROTECTIQd 6 CONTROL EQUIPMENT ROOM SAFETY CLASS A (EXCEPTAS NOTED)

CAROLINA POWER 8c LIGHT COMPANY NUCLEAR ENGINEERING DEPARTMENT - RALEIGH, N.C.

NONE SCALE:

PLANT HARRIS NUCLEAR PROJECT - UNIT 1 I

DWG NO.

HVAC-REACTOR AUXILIARY BLDG.

I TITLE:

CAR-21 68-G-517 S05 SWITCHGEAR 8c PROTECTION RM.

AIR FLOW DIAGRAM UNIT - 1

1 2

3 c

4 s

6 7

8 9 I 1 0 11 1 2 1 3 14 I

151 1 6 17 1 8 1 9 A

B C

D E

F G

H I

J K -

CAR-2168 G-533S04 A

B I

C D

D I

n F

m z

111 H

I J

K lssll L

M

\\ 3a,uoo CFM FOR CONT. SEE DWG CAR-2168 G-533 S02 (B-16)

I 3R CQNT E DWG 47550 CFkl FOR CONT. SEE DWG CAR-2168 G-533 S03 (B-15) t I-AE-+IWV-SSSI*

I w v - or59-1-4

/--

d c2 Q

d w

0 U

c 1

I I

I L

I I

t I

t I

I I

  • NOTES:

EQUIPMENT ABANDONED I N PLACE

1. AIR FLOW QUANTITIES SHOWN ARE BASED ON A DENSITY OF 0.075 LB FT3 OCCURRING AT THE

& 29.92"Hg BAROMETRIC PRESSURE.

RATES BASED ON DENSITY AT DES'N. CONDITIONS.

INTENDED TO INDICATE THE ACTUAL SEQUENCE OF DUCT CONNECTIONS AS THEY OCCUR ON THE PHYSICAL DRAWINGS.

PHYSICAL DWGS.

STANDARD CONDITION 0 1 DRY AIR AT 70T

2. PARENTHESIZED QUANTITIES ARE ACTUAL AIR FLOW
3. AIR FLOW DIAGRAMS ARE SCHEMATIC & ARE NOT
4. FOR LOCATION OF BALANCING DAMPERS REFER TO
5. FOR LEGEND, SYMBOLS 8c GEN NOTES SEE DWGS
6. ALL SYSTEMS ARE NNS (CLASS&

7.(0) MAX. AIR QUANTITIES OCCUR WHEN VOLUME CAR-2168 G-528 S01 & CAR-2168 G-528 S02.

P U M P SKID - FILTER ADSUR8ER p AIR BLOWER. AREA 0 CFM FROM STAIRS/

/

,/

FORMER PUMP - SKID F t LTER AOSORBER AIR 6LOWEE AREA I350 CFM -

It-,- -

PRECONCENTRATOR 5CRc)BBER 1

I z

I 750 CF -

I-REDUCTION SYSTEM I S OFF AND C-1 I S I N OPERATION.

a (b) 0 CFM OCCURS WHEN BOTH VOLUME REDUCTION (c) NORMAL CFM OCCURS WHEN VOLUME REDUCTION SYSTEM AND C-1 ARE OFF.

SYSTEM I S I N OPERATION.

8. FOR FE'S & AEbS TYPE AND CONNECTION TO ISOKINETIC SAMPLING AND RADIATION MONITORS SEE SPEC. NO. CAR-SH-IN41 5EPAWTOR AREA -

I----

I I

\\CFM FLUID BED DRYR $ GAS/SOLl SEPA F? ATOR ARA 4

Y FLUID BED DRYER (SOUTH)

DRUM STORAGE AREA REFERENCE DRAWINGS LIST OF DRAWINGS HVAC-WPB PLN. SH 3 EL.261.0' HVAC-WPB PLN. SH 4 EL.276 &

CAR 1364-A125 CAR 2168-G-495 S03 291 CAR 2168-G-495 S04 I

\\

EoCFM I

1

\\

r k

I c

TRUCK LOADING AREA AIR HEATER & LOCAL CONTROL PANEL AREA I

30'30 CFM

-0 I

I AIR HEATER I

PROCESS PIPING AND AIR BLOWER BY MECH SEE DWG CAR-2165-G-846 SO2 AIR BLOWER I

1-46-NNS CFM(MGX) 0 CFM[MIN)

I DRUM INSPECTION & LABEL'G. STATION (NORTH)

I a

S E E NOTE 7 B Y HVAC W.P.8,. L 291.00' CONTROL PANEL AREA (E15 400 cw J I I I I

I I 1 I

I THIS DRAWING HAS BEEN ELECTRONICALLY REPRODUCED WITHOUT DESIGN CHANGE I

I 1 RPP I

N 11-11-97.

INCORPORATED ESR 9500995(PARTIAL TURNOVER PER REV 4) (A6,C12,D12, E14-L3-L5, E16,F13,F16,J7,J9-L8,L9,L10, L11, L13,Mll J12,K7-

,M 13) K13, REV DESCRIPTION DWN DATE 0 -

CFM DECANTING STATION (WEST)

I I

THIS DRAWING HAS BEEN PRODUCED AND I S CONTROLLED ON THE NED CAD/E SYSTEM. ANY REVISIONS TO THIS DOCUMENT SHOULD BE DONE USING THE CAD/E SYSTEM TO ASSURE PROPER CONTROL OF THE ELECTRONIC DRAWING DATABASE.

NUCLEAR SAFETY RELATED (Q-LIST)

W.P.B.

EL. 276.00' t f DECANTING STATION (EAST)

YES-NO-R.W.-Q P A R T I A L U F. P. - Q a I

CAROLINA POWER & LIGHT COMPANY NUCLEAR ENGINEERING DEPARTMENT - RALEIGH, N.C DRUMMING STATION DECANTING STATION &

BRIDGE CRANE AREA HARRIS NUCLEAR PROJECT - UNIT 1 PLANT:

NONE SCALE:

W.P.B. EL. 261.00' 1

I TITLE:

HVAC-AIR FLOW DIAGRAM WASTE PROCESSING BUILDING SHEET 3 UNITS 1 & 2 DWG NO.

CPL-2168-HNP DOCUMENT CONTROL G-553 S04 I

2 3

I 4 3

6 7

8 9

I 1 0 11 12 1 3 14 I is 17 1 8