ML20147A034

From kanterella
Jump to navigation Jump to search
Amendment 63 to Update Final Safety Analysis Report, Chapter 17, Quality Assurance During Design and Construction
ML20147A034
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 05/15/2020
From:
Duke Energy Progress
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20147A016 List:
References
RA-20-0134
Download: ML20147A034 (4)


Text

Shearon Harris Nuclear Power Plant UFSAR Chapter: 17 17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION ............................ 1 17.2 DELETED BY AMENDMENT NO. 46 ............................................................................. 1 17.3 DELETED BY AMENDMENT 61 .................................................................................... 1 Amendment 63 Page i of i

Shearon Harris Nuclear Power Plant UFSAR Chapter: 17 17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION The PSAR QA program was implemented for the original plant design and construction activities.

17.2 DELETED BY AMENDMENT NO. 46 17.3 DELETED BY AMENDMENT 61 The description of the Quality Assurance Program is contained in the Duke Energy Corporation Topical Report Quality Assurance Program Description Operating Fleet, DUKE-QAPD-0001-A.

That Topical Report follows the format and content guidance of NUREG-0800 Section 17.3 except it is based on ANSI N18.7-1976 in lieu of ANSI/ASME NQA-1 and NQA-2.

Topical Report DUKE-QAPD-0001-A is incorporated by reference into the UFSAR.

Amendment 63 Page 1 of 1

Shearon Harris Nuclear Power Plant UFSAR Chapter: 17 TABLE TITLE N/A THERE ARE NO TABLES FOR CHAPTER 17 Amendment 63 Page 1 of 1

Shearon Harris Nuclear Power Plant UFSAR Chapter: 17 FIGURE TITLE N/A THERE ARE NO FIGURES FOR CHAPTER 17 Amendment 63 Page 1 of 1