Cover Letter Oyster Creek, License Termination Plan Acceptance Review
ML24284A197
Person / Time
Site: Oyster Creek
Issue date: 10/10/2024
From: Amy Snyder
Reactor Decommissioning Branch
To: Trice K
Holtec Decommissioning International
Shared Package
ML24284A174 List:
References
Download: ML24284A197 (1)


Text

Kelly Trice, President Holtec Decommissioning International, LLC Krishna P. Singh Technology Campus 1 Holtec Boulevard Camden, NJ 08104

SUBJECT:

OYSTER CREEK NUCLEAR GENERATING STATION - LICENSE TERMINATION PLAN ACCEPTANCE REVIEW REQUEST FOR SUPPLEMENTAL INFORMATION - REVISION TO ENCLOSURES (EPID L-2024-LLA-0107)

Dear Mr. Trice:

On August 1, 2024, Holtec Decommissioning International, LLC (HDI) submitted a license amendment request (LAR) (Agencywide Documents Access and Management System (ADAMS) Accession No. ML24214A037) proposing approval of the License Termination Plan (LTP) for Renewed Facility Operating License No. DPR-16 for the Oyster Creek Nuclear Generating Station (OCNGS). This request also proposes to add a license condition that would establish the criteria for determining when changes to the LTP require prior U.S. Nuclear Regulatory Commission (NRC) approval. In addition, HDI identified two technical support documents for the OCNGS LTP LAR that are currently under development and will be submitted for review on or before October 31, 2024.

On October 4, 2024, the NRC issued a letter ( ML24269A046) with Enclosure 1( ML24269A049)

Oyster Creek Nuclear Generation Station (OCNGS) License Termination Plan (LTP) License Amendment Request Acceptance Review Request for Supplemental Information (RSI) and ( ML24269A047) Issues Pending Requests for Additional Information (RAIs), about the OC LTP acceptance review. Due to a version control issue, the enclosed revised enclosures with side bars to show the changes and they supersede the October 4 enclosures. Revised now includes final dose modeling changes for RSI-8 and RSI-9. Also, revised, now includes the final dose modeling changes to several pending RAIs.

Please provide the requested supplemental information no later than March 31, 2025. If you need more time, please let me know.

In accordance with 10 CFR 2.390 of the NRC's Agency Rules of Practice and Procedure, a copy of this letter is available for inspection at the Public Document Room (PDR) Monday-Friday by appointment or electronically from the Publicly Available Records component of ADAMS. ADAMS is accessible from the NRC Web site at https://www.nrc.gov/reading-rm/adams.html. To schedule an appointment to visit the PDR, please email PDR.Resource@nrc.gov or call 1-800-397-4209.

October 10, 2024 K. Trice 2 If you have any questions, please contact me at 301-415-6822 or Amy.Snyder@nrc.gov.

Sincerely, Amy M. Snyder, Senior Project Manager Reactor Decommissioning Branch Division of Decommissioning, Uranium Recovery and Waste Programs Office of Nuclear Material Safety and Safeguards Renewed License No.: DPR-16 Docket Nos.: 50-219 and 72-15

Enclosures:

As stated cc: Oyster Creek ListServ Jeffrey Dostal, HDI j.dostal@holtec.com Jean Fleming, HDI J.Fleming@holtec.com Bill Noval, HDI W.Noval@holtec.com Steve Johnston, HDI s.johnston@holtec.com Kevin Wolf, HDI kg.wolf@holtec.com Lawrence Berlinski l.berlinski@holtec.com Signed by Snyder, Amy on 10/10/24