Category:INTERNAL OR EXTERNAL MEMORANDUM
MONTHYEARML20217D7031999-10-0707 October 1999 Informs That USNRC Had Dicussions with Licensee on 990908 Application for License Amend to Relocate 18-month Standby Diesel Generator Insp Sr.Forwards Preliminary Info Submitted by Licensee Re Supplement to Application ML20212L3481999-10-0101 October 1999 Forwards Document Re Replacement SG Water Level Trip Setpoint Differences to Be Placed in PDR ML20216F9021999-09-21021 September 1999 Notification of 991005-07 Meeting with STP Nuclear Operating Co in Bay City,Tx,To Review Plant Categorization & Feedback Process of Risk Ranking Components ML20211J2141999-08-27027 August 1999 Notification of 990831 Meeting with Util to Discuss Issues Associated with STPNOC Recent Request to Exclude safety- Related Low Risk Significant & non-risk Significant Components from Scope of Special Treatment Requirements ML20211G7001999-08-25025 August 1999 Forwards Examination Rept with as Given Written Exam Administered on 990706-15 for Distribution Under Rids Code IE42 ML20211G2501999-08-25025 August 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990706-15 ML20211F3801999-08-20020 August 1999 Notification of 990831 Meeting with Util in Rockville,Md to Discuss Issues Associated with STPNOC Recent Request to Exclude safety-related low-risk Significant & non-risk Significant Components, Designated Under Gqa Program ML20210P9351999-08-0909 August 1999 Notification of 990923 Meeting with Util in Arlington,Tx to Introduce New Director,Safety Quality Concerns Program & Status of Activities to Support Confirmatory Order Modifying License ML20210M6841999-08-0505 August 1999 Notification of Licensee Meeting with Util on 990914 in Arlington,Tx to Discuss New Mgt Team Introduction & Site Status ML20209D5751999-07-0909 July 1999 Notification of 990722 Meeting with Util in Rockville,Md to Discuss Licensee Proposed SG Water Level Trip Setpoint TS & Setpoint Impact on Pressurizer Water Level TS Per 10CFR50.36 ML20196L1481999-07-0707 July 1999 Forwards Info Provided by Licensee to Facilitate Conference Calls Re Licensee Desire to Propose Emergency Technical Specification Changes on Fuel Handling Building Exhaust Air Sys ML20212J2641999-06-24024 June 1999 Forwards Addl Info from Licensee Re Clarification of Sentence in Util (on Page 4 of 7) Which States That, Isolation Valves in This Sys Designed to Be Operated remote-manually from Control Room ML20195J0441999-06-14014 June 1999 Refers to Discussions with Licensee on Future Suppl to Application on Replacement Steam Generator Reactor Coolant Flow Differences ML20195J0841999-06-14014 June 1999 Forwards Info Re Suppl to Application on TS 3.6.3,action B, to Clarify Use of Check Valve with Flow Through Valve Secured as Means to Isolate Affected Containment Penetration,To Be Placed in PDR ML20207E8961999-06-0303 June 1999 Discusses Which Submitted Relief Request RR-ENG-2-8 Which Requested Relief from ASME Code Based on Provisions of Code Case N-491-2.Requests That Encl Be Placed Into PDR ML20207D9911999-05-28028 May 1999 Informs That NRC Requested That Licensees Respond to Survey on Hydrogen Storage Facilities,To Support Preliminary Evaluation to Determine If Addl Study Warranted.South Texas Project Licensee Response Encl for Placement in PDR ML20207A6671999-05-20020 May 1999 Notification of 990602 & 03 Meeting with Util in South Texas Project Nuclear Support Ctr,Southwest of Bay City,Tx,In Order for Licensee to Present low-power Shutdown Risk Model ML20207A3381999-05-19019 May 1999 Informs of Discussions with Licensee on 980831 Application for License Amend to TS 3.4.9.3 to Reflect Revised Cold Overpressure Mitigation Curve Associated with Replacement Sgs.Request That Encl Documents Be Placed in PDR ML20206N6411999-05-13013 May 1999 Refers to Discussions with Licensee on Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20206G5041999-05-0404 May 1999 Requests That Enclosures 1 & 2 Re 990412 Conference Call, Discussing Preliminary Results of SG Insp,Be Placed in PDR ML20206G2041999-05-0404 May 1999 Discusses 981201 Telcon Between NRC Staff & STP Re 10CFR50.59 Evaluation of MSLB Reanalysis & Effect on Isolation Valve Cubicle & Rcb.Requests That Encl Draft Info Be Placed in PDR ML20206A4851999-04-26026 April 1999 Informs That Staff Needs to Conduct Phone Call with Licensee on Licensee Response to GL 95-07.In Order to Conduct Phone Call,Staff Needs to Provide Licensee with Attached Info ML20205Q8251999-04-15015 April 1999 Forwards Documentation on Licensee 980928 Proposed Changes to TS on Control Room & Fuel Handling Bldg Ventilation Sys, Per 990304 Discussion with Util ML20205Q7961999-04-15015 April 1999 Forwards Documentation from Preliminary Discussions with Licensee on Proposed Changes to Atmospheric Steam Relief Valve Tss.Licensee Subsequently Made Formal Application on 990322 (Accession Number 9903300195) ML20205Q8111999-04-15015 April 1999 Forwards Draft Undated Rev 6 to Operations QA Plan Independent Technical Review, Per Discussions with Licensee on 990407 Re Proposed Change to TSs on Independent Safety Engineering Group ML20204H7731999-03-22022 March 1999 Notification of Significant Licensee Meeting with Util on 990419 in Arlington,Tx to Present Overview of Licensee Emergency Plan ML20207G8201999-03-0404 March 1999 Notification of Significant Licensee Meeting with Util on 990325 to Discuss Plant Performance Review Results ML20207K2301999-03-0404 March 1999 Notification of 990315 Meeting with STP Nuclear Operating Co in Rockville,Md So Licensee May Present risk-informed Exemptions Util Need for Implementation of Graded Quality Assurance at South Texas Project ML20199D1891999-01-11011 January 1999 Notification of 990126 Meeting with STP Nuclear Operating Co to Discuss C/As for Incomplete Control Rod Insertion Anomaly & to Discuss Need for Future mid-cycle Control Rod Drop Testing ML20198H3281998-12-15015 December 1998 Forwards Draft Info Submitted by Util Re 980728 Application for Amend Concerning Operator Action to Mitigate Sbloca,Per 981117 Telcon & for Placement in PDR ML20196G1521998-12-0303 December 1998 Forwards Draft Outline to NRC to Facilitate Discussions Between Util & NRC Re Actions Believed Needed to Address Restraints to Implementation of Graded QA ML20196F1751998-11-27027 November 1998 Notification of Licensee Meeting with Util on 981210 in Arlington,Tx to Discuss Certain Issues of Comprehensive Cultural Assessment for South Texas Project Site ML20196A8641998-11-24024 November 1998 Notification of 981208 Meeting with Util in Rockville,Md to Discuss Status of Current & Proposed Licensing Actions & Activities for Plant ML20195B9251998-11-10010 November 1998 Forwards,For Placement in Pdr,Draft Proposals That Were Provided by Licensee at Request of Staff,In Order to Assist Staff in Developing Commission Paper on Options for Making 10CFR50 More risk-informed ML20155H7471998-11-0505 November 1998 Notification of 981117 Meeting with STP Nuclear Operating Co in Arlington,Tx Re Presentation by Rosen,Manager,Risk Mgt& Industrial Relations on Licensee Perspective on Probablistic Risk Analysis ML20155C2651998-10-29029 October 1998 Forwards SG Insp Results Conducted in Oct 1998,to Be Placed in Pdr.Licensee Provided Info to Facilitate 981015 Conference Call ML20155C2231998-10-29029 October 1998 Forwards Draft Ltr from STP Nuclear Operating Co on Action Needed for Implementation of Graded QA for Plant Units 1 & 2 for Placement in PDR ML20155C2171998-10-26026 October 1998 Notification of 981109-10 Meeting with Util to Obtain Info from Licensee for NRC Proposed risk-informed Insp & Assessment Program.Agenda Encl ML20154L4101998-10-0909 October 1998 Forwards NRC Operator Licensing Exam Repts 50-498/98-301 & 50-499/98-301,including Completed Graded Tests Administered on 980602-04 ML20154L9261998-10-0909 October 1998 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980602-04 ML20154A0331998-09-24024 September 1998 Informs That Based on Review of Licensee 10CFR50.59 Evaluation of Environ Qualification of Mechanical Components,Staff Found That Proposed Change to UFSAR to Eliminate Meq Program Would Not Alter Any Plant Sys ML20151Y7231998-09-12012 September 1998 Notification of Licensee Meeting with Util on 981013 in Arlington,Tx Re Licensee Presentation Concerning Graded Quality Assurance Program at Plant ML20239A0941998-09-0303 September 1998 Notification of 980915 Meeting W/Util in Rockville,Md to Discuss Problems W/Implementing Graded QA,10CFR50.59,impact on risk-informed Applications & Comments on NRC Proposed Rev to 10CFR50.59 ML20239A1171998-09-0202 September 1998 Notification of 980915 Meeting W/Stp Nuclear Operating Co in Rockville,Md Re Licensee Presentation of Uses of Probabilistic Safety Assessment ML20151T6061998-09-0101 September 1998 Notification of Significant Licensee Meeting W/Util on 980918 to Discuss Licensee Insp Plans for Units 1 & 2 Replacement Steam Generators ML20236X8171998-08-0303 August 1998 Notification of Licensee Meeting W/Util on 980820 in Arlington,Tx to Discuss Certain Issues Ongoing at STP Site ML20249A6781998-06-16016 June 1998 Forwards Confirmatory Order Modifying Licenses NPF-76 & NPF-80 (Effective Immediately),For Transmittal to Ofc of Fr for Publication.W/O Encl ML20216J4491998-04-16016 April 1998 Notification of 980506 Meeting W/Util in Rockville,Md to Discuss Proposed Merger Between Aep & Central Southwest ML20217K9381998-04-0303 April 1998 Notification of 980413 Meeting W/Util in Rockville,Md to Discuss Licensee Desire for Update on Schedule for NRC Review of Licensee Application for Conversion to Improved Std TSs ML20197B0551998-03-0505 March 1998 Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam submittal,2nd & 3rd Exam Submittal as Given Operating Exam Administered on 971020-1205 1999-09-21
[Table view] Category:MEMORANDUMS-CORRESPONDENCE
MONTHYEARML20217D7031999-10-0707 October 1999 Informs That USNRC Had Dicussions with Licensee on 990908 Application for License Amend to Relocate 18-month Standby Diesel Generator Insp Sr.Forwards Preliminary Info Submitted by Licensee Re Supplement to Application ML20212L3481999-10-0101 October 1999 Forwards Document Re Replacement SG Water Level Trip Setpoint Differences to Be Placed in PDR ML20216F9021999-09-21021 September 1999 Notification of 991005-07 Meeting with STP Nuclear Operating Co in Bay City,Tx,To Review Plant Categorization & Feedback Process of Risk Ranking Components ML20211J2141999-08-27027 August 1999 Notification of 990831 Meeting with Util to Discuss Issues Associated with STPNOC Recent Request to Exclude safety- Related Low Risk Significant & non-risk Significant Components from Scope of Special Treatment Requirements ML20211G2501999-08-25025 August 1999 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 990706-15 ML20211G7001999-08-25025 August 1999 Forwards Examination Rept with as Given Written Exam Administered on 990706-15 for Distribution Under Rids Code IE42 ML20211F3801999-08-20020 August 1999 Notification of 990831 Meeting with Util in Rockville,Md to Discuss Issues Associated with STPNOC Recent Request to Exclude safety-related low-risk Significant & non-risk Significant Components, Designated Under Gqa Program ML20210P9351999-08-0909 August 1999 Notification of 990923 Meeting with Util in Arlington,Tx to Introduce New Director,Safety Quality Concerns Program & Status of Activities to Support Confirmatory Order Modifying License ML20210M6841999-08-0505 August 1999 Notification of Licensee Meeting with Util on 990914 in Arlington,Tx to Discuss New Mgt Team Introduction & Site Status ML20209D5751999-07-0909 July 1999 Notification of 990722 Meeting with Util in Rockville,Md to Discuss Licensee Proposed SG Water Level Trip Setpoint TS & Setpoint Impact on Pressurizer Water Level TS Per 10CFR50.36 ML20196L1481999-07-0707 July 1999 Forwards Info Provided by Licensee to Facilitate Conference Calls Re Licensee Desire to Propose Emergency Technical Specification Changes on Fuel Handling Building Exhaust Air Sys ML20212J2641999-06-24024 June 1999 Forwards Addl Info from Licensee Re Clarification of Sentence in Util (on Page 4 of 7) Which States That, Isolation Valves in This Sys Designed to Be Operated remote-manually from Control Room ML20195J0841999-06-14014 June 1999 Forwards Info Re Suppl to Application on TS 3.6.3,action B, to Clarify Use of Check Valve with Flow Through Valve Secured as Means to Isolate Affected Containment Penetration,To Be Placed in PDR ML20195J0441999-06-14014 June 1999 Refers to Discussions with Licensee on Future Suppl to Application on Replacement Steam Generator Reactor Coolant Flow Differences ML20207E8961999-06-0303 June 1999 Discusses Which Submitted Relief Request RR-ENG-2-8 Which Requested Relief from ASME Code Based on Provisions of Code Case N-491-2.Requests That Encl Be Placed Into PDR ML20207D9911999-05-28028 May 1999 Informs That NRC Requested That Licensees Respond to Survey on Hydrogen Storage Facilities,To Support Preliminary Evaluation to Determine If Addl Study Warranted.South Texas Project Licensee Response Encl for Placement in PDR ML20207A6671999-05-20020 May 1999 Notification of 990602 & 03 Meeting with Util in South Texas Project Nuclear Support Ctr,Southwest of Bay City,Tx,In Order for Licensee to Present low-power Shutdown Risk Model ML20207A3381999-05-19019 May 1999 Informs of Discussions with Licensee on 980831 Application for License Amend to TS 3.4.9.3 to Reflect Revised Cold Overpressure Mitigation Curve Associated with Replacement Sgs.Request That Encl Documents Be Placed in PDR ML20206N6411999-05-13013 May 1999 Refers to Discussions with Licensee on Response to GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions ML20206G2041999-05-0404 May 1999 Discusses 981201 Telcon Between NRC Staff & STP Re 10CFR50.59 Evaluation of MSLB Reanalysis & Effect on Isolation Valve Cubicle & Rcb.Requests That Encl Draft Info Be Placed in PDR ML20206G5041999-05-0404 May 1999 Requests That Enclosures 1 & 2 Re 990412 Conference Call, Discussing Preliminary Results of SG Insp,Be Placed in PDR ML20206A4851999-04-26026 April 1999 Informs That Staff Needs to Conduct Phone Call with Licensee on Licensee Response to GL 95-07.In Order to Conduct Phone Call,Staff Needs to Provide Licensee with Attached Info ML20205Q8251999-04-15015 April 1999 Forwards Documentation on Licensee 980928 Proposed Changes to TS on Control Room & Fuel Handling Bldg Ventilation Sys, Per 990304 Discussion with Util ML20205Q8111999-04-15015 April 1999 Forwards Draft Undated Rev 6 to Operations QA Plan Independent Technical Review, Per Discussions with Licensee on 990407 Re Proposed Change to TSs on Independent Safety Engineering Group ML20205Q7961999-04-15015 April 1999 Forwards Documentation from Preliminary Discussions with Licensee on Proposed Changes to Atmospheric Steam Relief Valve Tss.Licensee Subsequently Made Formal Application on 990322 (Accession Number 9903300195) ML20204H7731999-03-22022 March 1999 Notification of Significant Licensee Meeting with Util on 990419 in Arlington,Tx to Present Overview of Licensee Emergency Plan ML20207G8201999-03-0404 March 1999 Notification of Significant Licensee Meeting with Util on 990325 to Discuss Plant Performance Review Results ML20207K2301999-03-0404 March 1999 Notification of 990315 Meeting with STP Nuclear Operating Co in Rockville,Md So Licensee May Present risk-informed Exemptions Util Need for Implementation of Graded Quality Assurance at South Texas Project ML20199D1891999-01-11011 January 1999 Notification of 990126 Meeting with STP Nuclear Operating Co to Discuss C/As for Incomplete Control Rod Insertion Anomaly & to Discuss Need for Future mid-cycle Control Rod Drop Testing ML20198H3281998-12-15015 December 1998 Forwards Draft Info Submitted by Util Re 980728 Application for Amend Concerning Operator Action to Mitigate Sbloca,Per 981117 Telcon & for Placement in PDR ML20196G1521998-12-0303 December 1998 Forwards Draft Outline to NRC to Facilitate Discussions Between Util & NRC Re Actions Believed Needed to Address Restraints to Implementation of Graded QA ML20196F1751998-11-27027 November 1998 Notification of Licensee Meeting with Util on 981210 in Arlington,Tx to Discuss Certain Issues of Comprehensive Cultural Assessment for South Texas Project Site ML20196A8641998-11-24024 November 1998 Notification of 981208 Meeting with Util in Rockville,Md to Discuss Status of Current & Proposed Licensing Actions & Activities for Plant ML20195B9251998-11-10010 November 1998 Forwards,For Placement in Pdr,Draft Proposals That Were Provided by Licensee at Request of Staff,In Order to Assist Staff in Developing Commission Paper on Options for Making 10CFR50 More risk-informed ML20155H7471998-11-0505 November 1998 Notification of 981117 Meeting with STP Nuclear Operating Co in Arlington,Tx Re Presentation by Rosen,Manager,Risk Mgt& Industrial Relations on Licensee Perspective on Probablistic Risk Analysis ML20155C2231998-10-29029 October 1998 Forwards Draft Ltr from STP Nuclear Operating Co on Action Needed for Implementation of Graded QA for Plant Units 1 & 2 for Placement in PDR ML20155C2651998-10-29029 October 1998 Forwards SG Insp Results Conducted in Oct 1998,to Be Placed in Pdr.Licensee Provided Info to Facilitate 981015 Conference Call ML20155C2171998-10-26026 October 1998 Notification of 981109-10 Meeting with Util to Obtain Info from Licensee for NRC Proposed risk-informed Insp & Assessment Program.Agenda Encl ML20154L9261998-10-0909 October 1998 Forwards NRC Approved Operator Licensing Exam (Facility Outline & Initial Exam Submittal & as-given Operating Exam) for Tests Administered on 980602-04 ML20154L4101998-10-0909 October 1998 Forwards NRC Operator Licensing Exam Repts 50-498/98-301 & 50-499/98-301,including Completed Graded Tests Administered on 980602-04 ML20154A0331998-09-24024 September 1998 Informs That Based on Review of Licensee 10CFR50.59 Evaluation of Environ Qualification of Mechanical Components,Staff Found That Proposed Change to UFSAR to Eliminate Meq Program Would Not Alter Any Plant Sys ML20151Y7231998-09-12012 September 1998 Notification of Licensee Meeting with Util on 981013 in Arlington,Tx Re Licensee Presentation Concerning Graded Quality Assurance Program at Plant ML20239A0941998-09-0303 September 1998 Notification of 980915 Meeting W/Util in Rockville,Md to Discuss Problems W/Implementing Graded QA,10CFR50.59,impact on risk-informed Applications & Comments on NRC Proposed Rev to 10CFR50.59 ML20239A1171998-09-0202 September 1998 Notification of 980915 Meeting W/Stp Nuclear Operating Co in Rockville,Md Re Licensee Presentation of Uses of Probabilistic Safety Assessment ML20151T6061998-09-0101 September 1998 Notification of Significant Licensee Meeting W/Util on 980918 to Discuss Licensee Insp Plans for Units 1 & 2 Replacement Steam Generators ML20236X8171998-08-0303 August 1998 Notification of Licensee Meeting W/Util on 980820 in Arlington,Tx to Discuss Certain Issues Ongoing at STP Site ML20249A6781998-06-16016 June 1998 Forwards Confirmatory Order Modifying Licenses NPF-76 & NPF-80 (Effective Immediately),For Transmittal to Ofc of Fr for Publication.W/O Encl ML20216J4491998-04-16016 April 1998 Notification of 980506 Meeting W/Util in Rockville,Md to Discuss Proposed Merger Between Aep & Central Southwest ML20217K9381998-04-0303 April 1998 Notification of 980413 Meeting W/Util in Rockville,Md to Discuss Licensee Desire for Update on Schedule for NRC Review of Licensee Application for Conversion to Improved Std TSs ML20197B0551998-03-0505 March 1998 Forwards NRC Approved Operator Licensing Exam Facility Outline & Initial Exam submittal,2nd & 3rd Exam Submittal as Given Operating Exam Administered on 971020-1205 1999-09-21
[Table view] |
Text
- - __,_ _ __ , _ _ _
3
?* k: < NUCLEAR RESULATCRY COMMISSl3N :
~' t c neesom nr -
i tit RYAN MtA DRfvt. $UffE 1989 -
- ARumston.TaxAs nett ;
l u
P WGvember'26, 1986 hs AnW: s >
Memorandum ' For t Mark E. Resner, Assistant Director p ,
for Investigations u office of Inspector and Auditor
Subject:
Review of Transcript ,
Y Returned is the transcript of my November 9,1988 interview with a representative of the of fice of Inspector and Auditor which you forwarded to me under a memo dated November 17,.1988.
l- ,The copy is clean and accurately reflects my answers as to the best of l lty recollection. However, the main issue remains unanswered. Ms.
Connelly, who-was conducting the interview, stated that an allegation i had' been made that I applied f or a job at the south Texas Project L during the summer of 1987. Ms. connelly gave me the impression that Loince I denied that I applied for a job she was seeking to have me indicted for perjury. She started that the basis- of that charge was' a i
handwritten memo- from Larry George to Andy- Hill. It was dated August ,
21,.1987. The. memo' was read into the record and appears starting on t page 23 line 10. Larry George is.an employee of the south Texas L
c - SGcurity Department. who had been a confident of the NRC inspectors.
'The 'memonseems to raise more questions than it answered. I had conversations with Mr. George on almost a daily basis. The memo is
- cluttered with ideas and responses to questions raised by Mr. George during theseLintervening weeks. Note that he starts his memo with
'Sentor about the week of August 10th, 1987". Why is he writing this culti-topical meno to Andy Hill who is apparently no longer in the job of; security penager? After-reflection some thoughts come to mind. In on' ef fort to clarify sone of this, I include those reflections. ;
12 did respond-to Mr. George's request for ideas about where STP might
' find personnel for the Sergeant and Lieutenant jobs' that they needed to fill. I' recommended that they recruit at the junior and senior colleges that were _ graduating young criminal justice and police coministration ' majors. That is one isolated. topic which relates to !
' n31ther Mr. caldwell or myself nor to Mr. Hill's vacated position.
Why George is1 belatedly conveying that information to the dismissed-Mr. Hill, I can't even venture a guess.
"Concerning the headhunters making contact with me and other security :
< professionals, I. did: share that information with Mr. George and maybe-Mr.' Kern. However, Mr. George is mistaken when he says that I spoke 1 _obout myself as a replacement for Mr. Hill. However, if you replace the word " him " which appears on line 16, page 23, with the phrase JMRC inspector we are approaching accuracy. It was more like me m
coying,: a can you imagine that your management would consider another MRC: 1nspector for Hill's job ?" I was referring to the caldwell contact sof which I thought that Mr. George was aware.
l [ _ hW 9007240105 900720
/
PDR- FOIA
- . , e s . .
V I have. stated earlier that I thought the Caldwell contact, however legal,,was a mistake. This was all in the context that-both Andy Hill ond- Dave Moore were former NRC inspectors hired by. HL&P and that did not'workiout. Notice on line 18, that Mr. George acknowledges that I sold'it-was a bad idea. All-in all this is an academic discussion anyhow because Mr. George was not in a position to hire or recommend any. senior candidates. He was concerned with his ownI survival and had in the past asked me to put in a good word for him. was happy to- i
. consider that because I thought that Mr. George and Mr. Kern were !
icportant assets to the development of the security program. This is o significant point because I had almost daily contacts and meetings !
with Mr. Vaughn. Mr. Vaughn was the vice President of Nuclear-
' Production and the hiring authority for the security department. I never atehinted nor asked for a job, filled out an application, oubmitted- a resume or otherwise had any communication about employment for any individual with Mr. Vaughn, the hiring authority, of the STP !
Decur ity department. If I was interested in such a position, I had t
dolly- onsite personal opportunity to approach Mr. Vaughn. I do not R
mean to insult Mr. George, but if I was inclined to seek employment at STP I would have contacted Mr. Vaughn directly and not Mr. George.
I have become suspicious of the real intent of this process as conducted by Ms. Conne11y's office.of Inspection and Auditor. It has '
.bscone quite clear to me that if an NRC inspector finds and reports oecurity or safety risks, it is his own security that is placed at risk. .Lest we forget, this whole otA overview began because.the cliegers, who had f alsified documents to coverup their tremendous cistakes in the development of the ' security program at STP, attempted to: shif t blame to the NRC Inspectors. The inspection findings were verified.by investigations conducted by the NRC Office-of Investigations and the State of Texas. Findings by the HL&P Auditors brought-about.the dismissals of the allegers.. The NRC has declined to
.cct against those perpetrators and instead has turned against those NRC? inspectors who found the acts of wrong doing. Whether it is i intended or not, these nonjudicial personal attacks on the. integrity of the: Inspectors is debilitating to the overall inspection process.
I find that I have a moral responsibility to go beyond my own defense i in defense:of regulated quality security programs at licensed nuclear power reactors. I intend to resist this intimidating oal process, as the frightening of corried out: by OI A, which appears' to have as a MRC. Inspectors-into overlooking wrongdoing by a ents of licensees, cc: L. ~ 2eck, Chairman, NRC ,
R. Martin, Regional Administrator, RIV R. Bangart, Division Director, RPSO, RIV W. Dressler, NTEU, Attorney
u.s NuctsAn atoutAtony couuissioN .
ott.ce et imoeooe ano Am December 1, 1988 f ........ .......
1 Report of interview lations and Assessments, Nuclear David MOORE, former Supervisor for Investi f Security Department, Safeguards Services Dtvision, NuclearHL&P, Security and currently, tranch, Tennessee Supervisor of Security, Compliance Sectionwasinterviewedtelephonicallyregardinghisknowle v
- Valley Authority (TVA) flame retardant material in the area above the control of the testini) of the room. In addttion,1100RE responded to Questions concerning the reorganizatio's MOORE stated plan that was alleged to have beu drafted by James A.F. KtLLY. ;
essentially the following:
- MOORE related that he was not 1was Gdrosil, resent with initially A.B. EARNEST scratched. Hydrosil-is and David SHEESLE during the time the material, ,
the material that was used to seal several unused pgnetrations that existed MOORE l between the control room and the cable spreading room directly below.
said the titility engineering staff aged the material and Rex N00RE was in '
charge of the actual bullet-resistance testing and video taped the procedures.
He stated that he and the utility's QA personnel were present during the testing which occurred on the firing range and involved shooting through the MOORE further explained that because Hydrosil with a high-powered rifle.
Region IV would not accept the responsibility that the material was acce) table L (could not be penetrated) and met the UL 752 standard (level 4), they (tu i
utility) contacted Mr. SKELTON and Mr. BUSH of the NRC Headquarters, who resolved the matter and other security related issues during an onsite visit.
CIA asked MOORE to address the allegation that KELLY " drafted a reorganization plan for the STP security personnel that was subsequently implemented by HL&P management. MOORE recalled that when the staff was informed of the impending MOORE reorganization An@ HILL was manager, Nuclear Security De>artment.
further related that HILL called a meeting and presented' tie plan in a manner such that, ' effective today, this is the new reorganization.' He said they were also informed of new procedures, e.g., they would start wearing ties. i MOORE opined that HILL was probably directed by HL&P management to reorganize. a He affirmed that he obtained the plan from David SHEESLEY, who had been given the plan from KELLY. MOORE was not certain, however, about the He speculated thatmanner KELLY in .
which the plan was presented to SHEESLEY by KELLY.
may have said something similar to "this is what you guys should look like.'
MOORE added that he understood if SHEESLEY was reluctant to address the matte *
. Specifically because SHEESLEY is currently involved in the STP inspection effer.s t for Unit 2.
l cedesca, s $7-5
.....e ucemoer4hvne w
A
. W Do f M. Howe", Invest 19% tor o e. _
DecemDer 3, 430c
/ o . . . .o. .
D'.*aW?.** '!"U?!A"L'e 'i10.f#??,'.".^oi'.T"Oiain?.Ta'a " " '""*"*
- u &
l
i U s. nucle AR AtoVL ATORY cOMMisslON Office of Inspeciot and Avcito. .
December 6, 1988 o.................
Report of Interview l
David telephonica LAMB,lly regarding his knowledge of the allegation tiat KELLY drafted proposal to reorganize the nuclear security organization at SOUTH TEXAS. LAMB .
. stated essentially the following: j LAMB related that during July 1987, HILL had been removed from his position as Manager, Nuclear Security Department, and reassigned to a position in another L building. Within this time frame, LAMB recalled that executive management, specifically, Mr. Larry KERN and Mr. Gerald VAVGHN, decided to recrganize the >
nuclear group to improve management effectiveness. LAMB said to his knowledge.
James KELLY was not involved in the development of the plan or personnel decisions relative to the implementation of the plan. He further stated to- '
his knowledge-that other than possible suggestions offered in the spirit of
" assistance," KELLY was not involved in any meetings that HL&P held concerning .
this matter. LAMB related that he did not remember what the reorganization chart dated July 5,1987 said, nor did he recall receiving it. However he was aware that KELLY was extremely concerned about STP's poor management to the point that their management effectiveness was an open item until just a few I months ago. On a personal note, LAMB related that KELLY was probably the finest of all the _NRC inspectors, and he found KELLY to be knowledgeable and '
. helpful.
l 1
1
-.-.,.n_,_ , - . .
m'er o o, T nethesda, MD 07- 5 e / WD _....=. _
vecemoer o, noo o a . Howe,Investigaty
.. c....<i..
$!,'s(m oi Ci iclI" 1* 'c'"Ibe' bod, .Ta' sis o'O'~,'l 'o '.7c'il'. Os '""'""d ic','2'**~'o"**v'
'" ~ I u ho...o, _ ..e _ouuissc December 6, 1988 Report of Interview Mark ItcBURNETT Manatter Operations Support Licensing Department, HL&P, was interviewed telephon'ca$1y regarding his knowledge of the discussions between l
HL&P management and the Region IV inspectors about reorganizing the nuclear security organization. McBURNETT also provided information about the testing ?
procedures em)1oyed by A.B. EARNE$7 and the alleged threat by EARNE$T to David
$HEESLEY and .arry GEORGE. McBURNETT stated essentially the following:
McBURNETTrelatedthatduringthemiddleofthesunnerof1987(June-July),
the Licensing Department became aware that the Nuclear Security Department was not gettinti the job done. He recalled several discussions with Andy HILL about spectfic problems - one of which was Larry RYLEY, Panager,ization toOperations Division. Together, he and HILL presented the idea of a reorgan l executive management. Initially, the focus o. to~ remove RYLEY from his position to a different slot and thereby facilitate more direct reporting to t HILL rather than to RYLEY. He said that the current organization was not j
working well because RYLEY was 'a people problem when it came to i
interarsonal relations particularly with the NRC. McBURNETT further related J that ie and HILL wanted to ' flatten the organization out' particularly in the He added that they met with Mr. GOLD 8 ERG and Mr. VAUGHN and area of training. !
collectively finalized the reorganization. McBURNETT stated that the NRC was '
I not involved in any meetings or discussions with the' utility relative to the but he did i reorganization. He recalled that HILL had some sketches of a plani
' not know where HILL hed obtained them. Mc8URNETT opfned that were suggested to HILL oct he did not know He thisadded to tsat be factual.
as the reorttanization materialized executive management decided to remove HILLfromh'spositionaswellaskVLEY. However, this occurred later in the
HcBURNETT also related that he was present during the testing of the flame retardant
- ontrol room when t material,he material was scratched.Hydrosil, With regard to testing, on the firing ran he said he witnessed testing by EARNEST that he considered to be 'potentially -
destructive,' particularly, in the area of the vnel area doors. He explained that there are metal fire doors that access the control room. The doors are supposed to be resistant to penetration, but how that system is tested raises the issue of what is appropriate and what is not. Mc8URNETT said that EARNE$T -
used crowbars on the doort to determine whether they could be,g g d.
iMcBURHETT viewed thLs as excessivt, although he said that thqy Nhe utilit;r)
- through conversation with other ttilities in the Region, tgatHe 1 earned later,is apparently, th is the way Region IV normally conducts their inspections.
added "I guess we would just have to repair or replace the doors',if necessary, oi a^
^
6.u mo., m m MNc%.
r o,
.. ,,,*b,o a R nowe n nvestigatoT
- vecenser o, noo
/ .........
k,,.?#if.'i' e'..r!Z#??LO,'M'u'#t!",'." t'.'?!';! it.M'4'%'.S'Jf,'.; "* " """"'
iG N b
.: .g g .. . ... . . _ . . . _ . _ . . _ . . . _
E
.* ,. , .. j i
J McBURNETT expressed another concern regarding EARNE$T's testing of the with "E* field." Herelatedthatthereappearedtobe'hazardoustestinp'of
their personnel. The utility was very uncomfortable with the leve performance required by EARNEST, such as hurdling between two wires and falling into broken rocks as a direct result. McBURNETT further stated that by conducting these tests, EARNEST apparently had a hidden agenda to discredit the E. field, to show that it was not an acceptable system.
McBURNETT recalled the aftermath of the alleged physical threat by EARNEST directed at LAMB and SHEE5 LEY. He stated that although he did not witness the incident (not sure exactly) af ter it occurred, the subject surfaced during a meeting McBURNETT attended with Mr. VAUGHN and Mr. YANDELL. He could not recall specifics about what was said because it had happened over a year ago, i but ha offered that perhaps a few of the utility's instrument controls I technicians may have witnest.ed the incident. McBURNETT said that EARNE$T can be extremely intimidating for a host of reasons he is very loud and vocal l
and he is fairly large in stature (LAftB was described as 5'7*-5'8' tall and !
SHEESLEY, 5'10*-5'11 tall; and both men are under 200 lbs) and he is from the l NRC.
l l
l l
t l
l 1
(
- -. -