ML20155C217

From kanterella
Jump to navigation Jump to search
Notification of 981109-10 Meeting with Util to Obtain Info from Licensee for NRC Proposed risk-informed Insp & Assessment Program.Agenda Encl
ML20155C217
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 10/26/1998
From: Alexion T
NRC (Affiliation Not Assigned)
To: Hannon J
NRC (Affiliation Not Assigned)
References
NUDOCS 9811020145
Download: ML20155C217 (5)


Text

._ - _ _ _ _ _ . . - . . . . _ . . . _ -. _ . . _ _ . _ . - .___._ . _ __ . = _ . . . _ . -_. . . _ . _

g;. .

October 26, 1998 MEMORANDUM TO: John N. Hannon, Director Project Directorate IV-1 Division of Reactor Projects Ill/IV Office of Nuclear Reactor Regulation FROM: Thomas WcAlexion

' Project Directorate IV Original signed bye Division of Reactor Projects Ill/IV Office of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING MEETING WITH STP NUCLEAR OPERATING COMPANY DATE & TIME: Monday and Tuesday, November 9 and 10,1998 8:00 a.m. - 5:00 p.m.

LOCATION
South Texas Project Nuclear Support Center (Southwest of Bay City, Texas)

PURPOSE: To obtain information from the licensee for NRC's proposed risk-informed

l. inspection and assessment programs (agenda attached).

L PARTICIPANTS:* N8G UTILITY

P. Prescott R. Grantom, et al.

, R. Lloyd, et al.

l l Docket Nos. 50-498 L

and 50-499

cc
See next page l-

' CONTACT: T. Alexion, NRR 301-415-1326

  • Meetings between NRC technical staff and applicants or licensees are open for interested l ' members of the public, petitioners, intervenors, or other parties to attend as observers pursuant i

to " Commission Policy Statement on Staff Meetings Open to the Public" 59 Federal Reaister 48340,9/20/94.

DISTRIBUTION: See attached page DOCUMENT NAME: G:\STPFINAL\ST110498.NOT

" To receive a copy of this document, indicate in the box C= Copy w/o attachment / enclosure E= Copy with attachment / enclosure N = No copy OFFICE PM:M E LA:PD41 E D:F7tMJ ,

I NAME- TAI b CHawes U@ J M on DATE fh /h /98 j0 f$ /98 /v /M /98 {Ok

. OFFICIAL RECORD COPY c i , a, l 9811020145 981026 r? e e rU DR L.

- +, n .- - - -w < . - - . - , <-.no- n>-e . + - - - - , - -a *-e--= n,

,. . . - - . - . . . . .. . . .. - = . .-

.- s& >

DISTRIBUTION FOR MEETING NOTICE DATED: October 26, 1998 ,

l HARD COPY ~

l

[. Docket FNe.1f l PUBLIC PD#41 RF - l TAlexion  !

OGC I ACRS E-MAIL '

SCollins/FMiraglia (SJC1/FJM)

BBoger (BAB2)

EAdensam (EGA1)

JHannon (JNH)

CHawes TMartin (SLM3)

PPrescott RLloyd THiltz (TGH)

l

. 43. .

i .

1. .

Y STP Nuclear Operating Company South Texas, Units 1 & 2 l

cc:

1 Mr. Cornelius F. O'Keefe Jack R. Newman, Esq.

Senior Resident inspector Morgan, Lewis & Bockius j U.S. Nuclear Regulatory Commission 1800 M Street, N.W. '

P. O. Box 910 Washington, DC 20036-5869 Bay City, TX 77414 Mr. Lawrence E. Martin A. Ramirez/C. M. Canady Vice President, Nuc Assurance & Licensing Cityof Austin STP Nuclear Operating Company Electric Utility Department P. O. Box 289 721 Barton Springs Road Wadsworth,TX 77483 Austin,TX 78704 Office of the Governor Mr. M. T. Hardt ATTN: John Howard, Director Mr. W. C. Gunst Environmental and Natural City Public Service Board Resources Policy P. O. Rox 1771 P. O. Box 12428 San Antonio,TX 78296 Austin,TX 78711 Mr. G. E. Vaughn/C. A. Johnson Jon C. Wood Central Power and Light Company Matthews & Branscomb P. O. Box 289 One Alamo Center Mail Code: N5012 106 S. St. Mary's Street, Suite 700 Wadsworth,TX 74483 San Antonio, TX 78205 3692 INPO Arthur C. Tate, Director Records Center Division of Compliance & Inspection 700 Galleria Parkway Bureau of Radiation Control Atlanta, GA 30339 3064 Texas Depa1 ment of Health 1100 West 49th Street

' Regional Administrator, Region IV Austin,TX 78756 U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Jim Calloway Arlington,TX 76011 Public Utility Commission of Texas Electric Industry Analysis D. G. Tees /R. L. Balcom P. O. Box 13326 Houston Lighting & Power Co. Austin, TX 78711-3326 P. O. Box 1700 Houston,TX 77251 Mr. William T. Cottle President and Chief Executive Officer Judge, Matagorda County STP Nuclear Operating Company.

Matagorda County Courthouse South Texas Project Electric 1700 Seventh Street Generating Station Bay City, TX 77414 P. O. Box 289 Wadsworth, TX 77483

. 4 .

\

  • tj INFORMATION GATHERING FOR NRC'S RISK-INFORMED INSPECTION AND ASSESSMENT PROGRAMS November 9 - 10,1998 OBJECTIVES 1 Obtain information from the licensee for the proposed NRC risk-Informed inspection and assessment programs by gaining an understanding of the licensee's risk feedback and corrective action programs through interviews and presentations provided by licensee personnel.

2 Obtain information from the licensee as to how risk performance information could be used to partially or largely replace plant performance information that is currently being obtained through the NRC's core inspection program.

3 Obtain information from the licensee as to when increased licensee and NRC audit / inspection activities would be appropriate based on risk performance information.

4 Obtain information regarding risk-informed performance indicators used by South Texas, to include data availability, confidence levels, leading vs lagging, etc.

ONSITE INFORMATION GATHERING PROCf13 Have the licensee provide a presentation on their Risk and Reliability system. Include information regarding its evolution over time, its capabilities, and the confidence of its risk calculations.

' Have the licensee focus presentations using actual examples associated with the top five risk /safet./ significant systems as identified by the licensee's Maintenance Rule Program.

Have the Fcensee correlate output from their Risk and Reliability system with actual operating experience / material condition and the component, train, and system availability (for the top five risk / safety significant systems). Include presentations by licensee system engineers for the systems discussed.

Have the licensee discuss established or proposed performance indicators that are used to determine risk during operations or shutdown conditions, include a presentation on how the various risk performance indicator thresholds were established, and the necessary actions to lower risk to an acceptable level.

Have the licensee discuss how the licensee's work control / problem identification / corrective action program is used in the risk assessment process.

ATTACHMENT

. . . . - ~ . . . . . . . _ - . . .-- - -. - - - -

. s..

.A -

2 Presentations should be provided by licensee PRA experts, System Engineers, and operators as appropriate.

DOCUMENTATION REQUESTS PRIOR TO TRIP

' Program documents and procedures developed to implement cornerstone assessment loop System Health Reports Problem Identification / Corrective Action Program documents Risk and Reliability program procedures Licensee Lessons Learned Information NRC PARTICIPANTS Ron Lloyd Pete Prescott, et al.

ATTACHMENT

- - - - . , .