|
---|
Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20204B7181999-03-11011 March 1999 Summary of 990225 Meeting with Abb Combustion Engineering in Rockville,Md to Discuss Issues Re ABB-CE Crossflow Ultrasonic Flow Measurement Device.List of Attendees & Copy of Nonproprietary Matl Handed Out at Meeting Encl ML20198H3151998-12-14014 December 1998 Summary of 981117 Meeting with ABB-Combustion Engineering, Inc (ABB-CE) to Discuss Issues Re Rev of ABB-CE large-break LOCA Evaluation Models.List of Meeting Attendees & Meeting Presentation Slides Encl ML20247N4931998-05-20020 May 1998 Summarizes 980514 Annual Planning Meeting W/Abb Combustion Engineering in Rockville,Md to Discuss Nuclear Power Operations & Licensing Plans for Next 1-3 Years.List of Attendees Encl ML20132D8481996-12-18018 December 1996 Summary of 961212 Meeting w/ABB-CE & GE in Rockville,Md Re Changes to Design Control Documents for ABWR & Sys 80+ Standard Plant Designs.List of Attendees Encl ML20148B5761996-10-0404 October 1996 Summary of 434th Meeting of ACRS on 960912-13 Re Capability of SCAP/RELAP5 Code to Predict SG Temps During Severe Accidents ML20129G4921996-08-29029 August 1996 Summary of 433rd ACRS Meeting on 960808-10 Re Design Changes Proposed by Asea Brown Boveri - C-E Re Certification of Sys 80+ Design,Secy 96-128,proposed Rev 3 to Reg Guide 1.8,revs to Reg Guides 1.84,1.85 & 1.147 & Rev 3 to Reg Guide 1.105 ML20149F4881994-08-0404 August 1994 Summary of 940726 Meeting w/ABB-CE in Rockville,Md Re Form & Content of Design Control Document for ABB-CE Sys 80+ Std Plant Design ML20059F2261994-01-10010 January 1994 Summary of 931221 Meeting W/Util in Rockville,Md Re New Source Term & Application for EQ of Sys 80+ Plant ML20059D0191993-12-28028 December 1993 Summary of 931028-29 Meeting Between ABB-CE & Contractors & Nrc/Consultants from Llnl Re Structural Design Audit for ABB-CE Sys 80+ Std Plant Design.List of Meeting Attendees & Handouts Encl ML20058P5141993-12-17017 December 1993 Summary of 931006-07 Meeting w/ABB-CE & Duke Engineering Svcs,Inc in Windsor,Ct Re Details of Buckling Calculations for Sys 80+ Steel Containment Structure ML20058L8581993-12-13013 December 1993 Notification of 931214 Meeting w/ABB-Combustion Engineering in Rockville,Md to Review & Resolve Remaining Structural/ Geotechnical Design Issues for ABB-CE Sys 80+ ML20058K5941993-12-10010 December 1993 Summary of 931117-19 Meeting w/ABB-CE in Rockville,Md Re Comments on TS for Instrumentation Proposed for Sys 80+.List of Attendees Encl ML20059K2811993-11-10010 November 1993 Summary of 931027 Meeting w/ABB-CE in Rockville,Md Re CE Sys 80+ Protection Against Containment Bypass During SGTR & Fuel Design.List of Meeting Attendees & ABB-CE Handouts Encl ML20059G9631993-10-29029 October 1993 Summary of 930802-03 Meeting w/ABB-CE in Windsor,Ct to Obtain Latest Info on Evolving Design of CE Sys 80+ Hms. List of Meeting Attendees & Handouts Encl ML20057D2071993-09-27027 September 1993 Summary of 930615-16 Meeting w/ABB-CE in Windsor,Ct Re Status of Dser Open Items & Related follow-up Questions ML20057C1221993-09-23023 September 1993 Summary of 930916 Meeting w/ABB-CE in Rockville,Md to Discuss Potential Design Alternatives for CE Sys 80+ Design to Prevent SGTR Containment Bypass ML20057B6581993-09-15015 September 1993 Summary of 930810 & 11 Meeting w/ABB-CE in Windsor,Ct Re Issues Raised in Sys 80+ Dser on Scv Stress & Buckling Analysis.W/List of Attendees & Handouts ML20057B9661993-09-14014 September 1993 Summary of 930902 Public Meeting w/ABB-CE in Windsor,Ct Re Open Issues on Probabilistic Risk Assessment (PRA) for Sys 80+ Std Plant Design.List of Mtg Attendees & Meeting Handouts Encl ML20057A6211993-09-0707 September 1993 Summary of 930812 Meeting w/ABB-CE in Rockville,Md Re Hydrogen Control & 10CFR50.34(f) Requirements for CE Sys 80% Std Plant Design.List of Attendees & Handouts Encl ML20056G9541993-08-30030 August 1993 Summary of 930818 Meeting W/Duke Engineering & Svcs in Charlotte,Nc Re Staff Review of Safeguards Aspects of ABB-CE Sys 80+ Design ML20056G0711993-08-26026 August 1993 Summary of Public Meeting w/ABB-CE on 930809 in Rockville,Md Re Open Issues Involving PRA for Sys 80+ Std Plant Design ML20056G0731993-08-25025 August 1993 Summary of 930816 Senior Mgt Meeting w/ABB-CE in Rockville, MD Re Design Certification Status of CE Sys 80+ Std Plant Design ML20056F9231993-08-25025 August 1993 Summary of 930728 Meeting w/ABB-CE & Consultants from ABB-Impell,Duke Engineering Svcs,Inc & RP Kennedy in Rockville,Md Re System 80+ Sliding & Overturning During Seismic Events.List of Attendees Encl ML20056G2081993-08-19019 August 1993 Summary of 930819 Meeting w/ABB-CE in Rockville,Md Re Potential Design Alternatives for C-E Sys 80+ Design to Steam Generator Tube Rupture Containment Bypass.List of Attendees and Viewgraphs Encl ML20056G2041993-08-19019 August 1993 Summary of 930805 Meeting w/ABB-CE in Rockville,Md Re Containment Bypass During Steam Generator Tube Ruptures.List of Attendees & Viewgraphs Encl ML20056F8021993-08-19019 August 1993 Summary of 930621-25 Public Meeting w/ABB-CE in Windsor,Ct Re Structural,Piping,Mechanical & Matls Open Items for ABB-CE Sys 80+.Listed Info Encl ML20056E1511993-08-17017 August 1993 Summary of 930802 Meeting w/GE,C-E & Westinghouse in Rockville,Md Re Status of Design Certification Reviews for Each Revolutionary & Passive Reactor Design.List of Attendees & Handout Encl ML20056E1931993-07-30030 July 1993 Summary of 930715 Meeting w/ABB-CE in Windsor,Ct Re Differences Between Palo Verde Steam Generators & Sys 80+ Steam Generators in Connection W/Sgtr Event at Palo Verde. List of Attendees & Viewgraphs Encl ML20056E0791993-07-30030 July 1993 Summary of 930614 Meeting w/ABB-CE & BNL in Upton,Ny Re Sys 80+ Human Factors Engineering Verification & Validation Plan.Attendance List,Agenda,Nrc Comments & ABB-CE Responses Encl ML20128F6861993-02-0808 February 1993 Summary of 930111 Meeting w/ABB-CE in Windsor,Ct Re Review Status of CE Sys 80+ Design ML20127H6011993-01-15015 January 1993 Summary of 921209 Meeting w/ABB-CE in Rockville,Md to Discuss Review Status of CE Sys 80+ Design W/Senior Mgt. Associate Director for Insp & Technical Assessment Expressed Concern Re Review Process Between Dser Issues & ITAAC ML20126K0021992-12-30030 December 1992 Summary of 921202-03 Meeting w/ABB-CE in Windsor,Ct to Discuss Review of Submittal Entitled, Sys 80+ Severe Accident Phenomenology & Containment Performance, Dtd Aug 1992 1999-03-11
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20204B7181999-03-11011 March 1999 Summary of 990225 Meeting with Abb Combustion Engineering in Rockville,Md to Discuss Issues Re ABB-CE Crossflow Ultrasonic Flow Measurement Device.List of Attendees & Copy of Nonproprietary Matl Handed Out at Meeting Encl ML20198H3151998-12-14014 December 1998 Summary of 981117 Meeting with ABB-Combustion Engineering, Inc (ABB-CE) to Discuss Issues Re Rev of ABB-CE large-break LOCA Evaluation Models.List of Meeting Attendees & Meeting Presentation Slides Encl ML20247N4931998-05-20020 May 1998 Summarizes 980514 Annual Planning Meeting W/Abb Combustion Engineering in Rockville,Md to Discuss Nuclear Power Operations & Licensing Plans for Next 1-3 Years.List of Attendees Encl ML20132D8481996-12-18018 December 1996 Summary of 961212 Meeting w/ABB-CE & GE in Rockville,Md Re Changes to Design Control Documents for ABWR & Sys 80+ Standard Plant Designs.List of Attendees Encl ML20148B5761996-10-0404 October 1996 Summary of 434th Meeting of ACRS on 960912-13 Re Capability of SCAP/RELAP5 Code to Predict SG Temps During Severe Accidents ML20129G4921996-08-29029 August 1996 Summary of 433rd ACRS Meeting on 960808-10 Re Design Changes Proposed by Asea Brown Boveri - C-E Re Certification of Sys 80+ Design,Secy 96-128,proposed Rev 3 to Reg Guide 1.8,revs to Reg Guides 1.84,1.85 & 1.147 & Rev 3 to Reg Guide 1.105 ML20149F4881994-08-0404 August 1994 Summary of 940726 Meeting w/ABB-CE in Rockville,Md Re Form & Content of Design Control Document for ABB-CE Sys 80+ Std Plant Design ML20059F2261994-01-10010 January 1994 Summary of 931221 Meeting W/Util in Rockville,Md Re New Source Term & Application for EQ of Sys 80+ Plant ML20059D0191993-12-28028 December 1993 Summary of 931028-29 Meeting Between ABB-CE & Contractors & Nrc/Consultants from Llnl Re Structural Design Audit for ABB-CE Sys 80+ Std Plant Design.List of Meeting Attendees & Handouts Encl ML20058P5141993-12-17017 December 1993 Summary of 931006-07 Meeting w/ABB-CE & Duke Engineering Svcs,Inc in Windsor,Ct Re Details of Buckling Calculations for Sys 80+ Steel Containment Structure ML20058L8581993-12-13013 December 1993 Notification of 931214 Meeting w/ABB-Combustion Engineering in Rockville,Md to Review & Resolve Remaining Structural/ Geotechnical Design Issues for ABB-CE Sys 80+ ML20058K5941993-12-10010 December 1993 Summary of 931117-19 Meeting w/ABB-CE in Rockville,Md Re Comments on TS for Instrumentation Proposed for Sys 80+.List of Attendees Encl ML20059K2811993-11-10010 November 1993 Summary of 931027 Meeting w/ABB-CE in Rockville,Md Re CE Sys 80+ Protection Against Containment Bypass During SGTR & Fuel Design.List of Meeting Attendees & ABB-CE Handouts Encl ML20059G9631993-10-29029 October 1993 Summary of 930802-03 Meeting w/ABB-CE in Windsor,Ct to Obtain Latest Info on Evolving Design of CE Sys 80+ Hms. List of Meeting Attendees & Handouts Encl ML20057D2071993-09-27027 September 1993 Summary of 930615-16 Meeting w/ABB-CE in Windsor,Ct Re Status of Dser Open Items & Related follow-up Questions ML20057C1221993-09-23023 September 1993 Summary of 930916 Meeting w/ABB-CE in Rockville,Md to Discuss Potential Design Alternatives for CE Sys 80+ Design to Prevent SGTR Containment Bypass ML20057B6581993-09-15015 September 1993 Summary of 930810 & 11 Meeting w/ABB-CE in Windsor,Ct Re Issues Raised in Sys 80+ Dser on Scv Stress & Buckling Analysis.W/List of Attendees & Handouts ML20057B9661993-09-14014 September 1993 Summary of 930902 Public Meeting w/ABB-CE in Windsor,Ct Re Open Issues on Probabilistic Risk Assessment (PRA) for Sys 80+ Std Plant Design.List of Mtg Attendees & Meeting Handouts Encl ML20057A6211993-09-0707 September 1993 Summary of 930812 Meeting w/ABB-CE in Rockville,Md Re Hydrogen Control & 10CFR50.34(f) Requirements for CE Sys 80% Std Plant Design.List of Attendees & Handouts Encl ML20056G9541993-08-30030 August 1993 Summary of 930818 Meeting W/Duke Engineering & Svcs in Charlotte,Nc Re Staff Review of Safeguards Aspects of ABB-CE Sys 80+ Design ML20056G0711993-08-26026 August 1993 Summary of Public Meeting w/ABB-CE on 930809 in Rockville,Md Re Open Issues Involving PRA for Sys 80+ Std Plant Design ML20056G0731993-08-25025 August 1993 Summary of 930816 Senior Mgt Meeting w/ABB-CE in Rockville, MD Re Design Certification Status of CE Sys 80+ Std Plant Design ML20056F9231993-08-25025 August 1993 Summary of 930728 Meeting w/ABB-CE & Consultants from ABB-Impell,Duke Engineering Svcs,Inc & RP Kennedy in Rockville,Md Re System 80+ Sliding & Overturning During Seismic Events.List of Attendees Encl ML20056G2081993-08-19019 August 1993 Summary of 930819 Meeting w/ABB-CE in Rockville,Md Re Potential Design Alternatives for C-E Sys 80+ Design to Steam Generator Tube Rupture Containment Bypass.List of Attendees and Viewgraphs Encl ML20056G2041993-08-19019 August 1993 Summary of 930805 Meeting w/ABB-CE in Rockville,Md Re Containment Bypass During Steam Generator Tube Ruptures.List of Attendees & Viewgraphs Encl ML20056F8021993-08-19019 August 1993 Summary of 930621-25 Public Meeting w/ABB-CE in Windsor,Ct Re Structural,Piping,Mechanical & Matls Open Items for ABB-CE Sys 80+.Listed Info Encl ML20056E1511993-08-17017 August 1993 Summary of 930802 Meeting w/GE,C-E & Westinghouse in Rockville,Md Re Status of Design Certification Reviews for Each Revolutionary & Passive Reactor Design.List of Attendees & Handout Encl ML20056E1931993-07-30030 July 1993 Summary of 930715 Meeting w/ABB-CE in Windsor,Ct Re Differences Between Palo Verde Steam Generators & Sys 80+ Steam Generators in Connection W/Sgtr Event at Palo Verde. List of Attendees & Viewgraphs Encl ML20056E0791993-07-30030 July 1993 Summary of 930614 Meeting w/ABB-CE & BNL in Upton,Ny Re Sys 80+ Human Factors Engineering Verification & Validation Plan.Attendance List,Agenda,Nrc Comments & ABB-CE Responses Encl ML20128F6861993-02-0808 February 1993 Summary of 930111 Meeting w/ABB-CE in Windsor,Ct Re Review Status of CE Sys 80+ Design ML20127H6011993-01-15015 January 1993 Summary of 921209 Meeting w/ABB-CE in Rockville,Md to Discuss Review Status of CE Sys 80+ Design W/Senior Mgt. Associate Director for Insp & Technical Assessment Expressed Concern Re Review Process Between Dser Issues & ITAAC ML20126K0021992-12-30030 December 1992 Summary of 921202-03 Meeting w/ABB-CE in Windsor,Ct to Discuss Review of Submittal Entitled, Sys 80+ Severe Accident Phenomenology & Containment Performance, Dtd Aug 1992 1999-03-11
[Table view] |
Text
/ " * %, h CA J f
! [., UNITED STATES j.!;/ %}y PtlUCLEAR REGULATORY COMMISSION WASHINGTON. D C. 20555 0001
, "i ( jb 9.,,,," August 30, 1993 :
Docket No.52-002 APPLICANT: ABB-Combustion Engineering, Inc. (ABB-CE)
PROJECT: CE System 80+
SUBJECT:
PUBLIC MEETING AUGUST 18, 1993, REGARDING SAFEGUARDS ISSUES FOR ABB-CE SYSTEM 80+
On August 18, 1993, a public meeting was held at the offices of Duke Engineering and Services (DE&S) in Charlotte, North Carolina, between representatives of ABB-CE, DE&S, and the U.S. Nuclear Regulatory Commission (NRC). The purpose of the meeting was to discuss issues rehted to the NRC staff's review of the safeguards aspects of ABB-CE's System 80+ design. The main topics of discussion included: (1) insider vulnerability analysis, (2) control room indication of critical manual valves, and (3) the vital equipment list. During the meeting, five draft safety evaluation report (DSER) open items were technically resolved. Enclosure 1 provides a list of attendees. Enclosure 2 contains the material presented by ABB-CE.
The first topic discussed at the meeting was the insider vulnerability analysis. In order to make sure that everyone was clear on the scope of the analysis, some ground rules were agreed upon by the group. An insider was defined as a single individual with no weapons or bombs. It was decided that the purpose of the analysis was to determine what could reasonably be changed in the design to prevent an insider from manipulating valves or damaging equipment such that he or she could cause a core melt. The NRC staff emphasized the importance of being able to detect when an insider is tampering with important equipment, and that the equipment of concern should be determined by probabilistic risk assessment insights.
The insider vulnerability analysis is the only remaining DSER open issue in the safeguards review. During the meeting, the following actions were agreed upon as a path to resolution:
(1) ABB-CE will review the damage control measures listed in CESSAR Appendix 13A, Section 5.1 and state why they were, or were not, implemented.
(2) ABB-CE will add a COL action item to CESSAR Section 13.6 on insider :
vulnerability.
(3) ABB-CE needs to add a more detailed discussion to the CESSAR describing how the design is protected from the accidents of interest.
a,g 9309070367 930830 PDR t\
ADOCK 05200002 PDR
t August 30, 1993 The next topic was the issue of adding indications in the control room for critical manual valves. After a brief discussion, it was agreed that the valves listed in Enclosure 2 should have position indications in the control room.
The last topic was the list of vital equipment and areas. The list provided in the CESSAR was reviewed by the group. It was agreed that the steam generator pressure isolation valves in the wet layup and blowdown systems should be added to the list.
The meeting concluded with a review of the status of all of the DSER open items in the safeguards area. It was agreed that, with the exception of the insider vulnerability analysis, all of the issues have been resolved. The NRC reviewer will continue to interact with ABB-CE m DE&S personnel to resolve this remaining issue.
(Original signed by T. Essig for)
Stewart L. Magruder, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors and License Renewal Office of Nuclear Reactor Regulation
Enclosures:
As stated cc w/ enclosures:
See next page DISTRIBUTION w/ enclosures:
Docket File PDST R/F DCrutchfield PDR PShea SMagruder Distribution w/o enclosures:
TMurley/FMiraglia WTravers RBorchardt MFranovich TWambach TEssig PMcKee, 9D24 FYoung, 9D24 ACRS (11)
[
OFC: LA:PD Q A R PM:PDST:ADAR* PSGB:DRSS* AR NAME: PShea WN SMagruder:sg. FYoung TEssig DATE: 08 L3 08/27/93 08/27/93 08/Jo/93 0FFICIAL RECORD COPY: DOCUMENT NAME: MSUM0818.SLM
r l l
l ABB-Combustion Engineering, Inc. Docket No.52-002 cc: Mr. C. B. Brinkman, Acting Director Nuclear Systems Licensing ABB-Combustion Engineering, Inc.
1000 Prospect Hill Road Windsor, Connecticut 06095-0500 L
Mr. C. B. Brinkman, Manager Washington Nuclear Operations ABB-Combustion Engineering, Inc.
12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Mr. Stan Ritterbusch Nuclear Systems Licensing ABB-Combustion Engineering, Inc.
1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095-0500 Mr. Sterling Franks U.S. Department of Energy NE-42 Washington, D.C. 20585 Mr. Steve Goldberg l Budget Examiner 725 17th Street, N.W. -,
Washington, D.C. 20503 Mr. Raymond Ng 1776 Eye Street, N.W.
Suite 300 Washington, D.C. 20006 Joseph R. Egan, Esquire Shaw, Pittman, Potts & Trowbridge 2300 N Street, N.W. !
Washington, D.C. 20037-1128 Mr. Regis A. Matzie, Vice President Nuclear Systems Development ABB-Combustion Engineering, Inc.
1000 Prospect Hill Road -
Post Office Box 500 Windsor, Connecticut 06095-0500 *
/
ABB-CE SYSTEM 80+
SAFEGUARDS ISSUES MEETING ATTENDEES August 18, 1993 Name Oraanization T. Crom DE&S G. Pollard DE&S L. Davis DE&S D. Finnicum ABB-CE S. Ritterbusch ABB-CE ~
F. Young NRC S. Magruder NRC L
i Enclosure 1 l
w-ye I
a These are manual isolation valves which should have position 4 indication in the control room for security purposes. Please run this list by Joe Longo's people.
SAFETY INJECTION SYSTEM I Safety Injection Pump 1 Suction Isolation Valve SI-470 Safety Injection Pump 3 Suction Isolation Valve SI-130 Safety Injection Pump 2 Suction Isolation Valve SI-402 Safety Injection Pump 4 Suction Isolation Valve SI-131 Safety Injection Pump 1 Discharge Isolation Valve SI-476 Safety Injection Pump 3 Discharge Isolation Valve SI-435 Safety Injection Pump 2 Discharge Isolation Valve SI-478 Safety Injection Pump 4 Discharge Isolation Valve SI-447 NOTE: The valves for pumps 1 and 3 are shown on Figure 6.3.2-1A. The valves for pumps 2 and 4 are shown on Figure 6.3.2-1B. All valves are locked open and have extension stem operators.
EMERGENCY FEEDWATER SYSTEM I
l Steam Driven EFW Pump 1 Suction Isolation Valve EF-208 l Motor Driven EFW Pump 1 Suction Isolation Valve EF-210 Steam Driven EFW Pump 2 Suction Isolation Valve EF-209 Motor Driven EFW Pump 2 Suction Isolation Valve EF-211 Steam Driven EFW Pump 1 Discharge Isolation Valve EF-338 Motor Driven EFW Pump 1 Discharge Isolation Valve EF-340 Steam Driven EFW Pump 2 Discharge Isolation Valve EF-339 Motor Driven EFW Pump 2 Discharge Isolation Valve EF-341 NOTE: These valves are shown on Figure 10.4.9-1.1. All valves are locked open.
l SG 1 Supply to EFW Pump Turbine 1 Isolation Valve EF-238 SG 2 Supply to EFW Pump Turbine 2 Isolation Valve EF-239
[ NOTE: These valves are shown on Figure 10.4.9-1.2. All valves l
are locked open.
h$ 'c n-nnac, ,,,u,i-U h' min Av %ourIn 9 1, YWn Golly fung Sucik +- DbeQ9e 1,1g, 5
0 %Irpen Spy f,w s, B la ch,r g Enclosure 2