Summary of 931117-19 Meeting w/ABB-CE in Rockville,Md Re Comments on TS for Instrumentation Proposed for Sys 80+.List of Attendees Encl
ML20058K594
Person / Time
Site: 05200002
Issue date: 12/10/1993
From: Shembarger K
Office of Nuclear Reactor Regulation
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 9312150328
Download: ML20058K594 (5)


Text

_ _ _ _ _ _ _ _ _ _ - _ _ _ _

~

l

, pn M c u

[ T UNITED STATES

[#;3.kDf }j NUCLEAR REGULATORY COMMISSION wASWNGTON. D.C. 20556 0001

\,}, -

  1. December 10, 1993 Docket No.52-002 APPLICANT: ABB-Combustion Engineering, Inc. (ABB-CE) l PROJECT: CE System 80+

SUBJECT:

PUBLIC MEETING 0F NOVEMBER 17 THROUGH 19, 1993, TO DISCUSS CE.

SYSTEM 80+ TECHNICAL SPECIFICATIONS (TS) FOR INSTRUMENTATION,  !

SECTION 3.3 0F TS, AND SECTION 16.6 0F CESSAR-DC On November 17 through 19, 1993, a public meeting was held at the ABB-CE offices in Rockville, Maryland, among representatives of ABB-CE, the U.S.

Nuclear Regulatory Commission (NRC), and NRC contractors. Enclosure 1 provides a list of attendees.

l The purpose of the meeting was to discuss the NRC staff's and its contractor's comments on TS for instrumentation proposed for System 80+ in Section 16.6 of CESSAR-DC.

Resolutions Reached Durina The Meetina Two changes will be made to the TS to address software errors. First, I the word " software" will be added to the definition of Operabilit;.

Second, Section 5.0 of the TS will be modified to add administrative reporting requirements.

The requirement to perform comprehensive functional tests to determine the operability of the protection system will not be added to TS. This resolution was reached based on the following factors: (1) extensive pre-operational testing will be performed to verify inputs over the I

required range; (2) software does not degrade over time; (3) it is unlikely that multiple trip inputs will be received simultaneously; (4) self-diagnostics will be performed; and (5) periodic surveillances will be performed to exercise each input by periodically forcing the input to a specific value over the trip setpoint.

It is acceptable to eliminate the requirement to perform the functional test on the protection system if the system is in 1-out-of-2 logic during plant operation. Performance of the test at power would result in a plant trip.

The gateways attached to the engineered safety features redundant communication links do not need to be in TS. This resolution was q reached based on the following factors: (1) the communication link has 5

. deterministic behavior; (2) self-diagnostics will be performed; and (3) or,e-way communication of information is adequate.

784222888:8si8a802 A WC FRE CENTER COPY PDR

December 10, 1993 Commitments Made Durina The Meetina  ;

ABB-CE will address the issue of redundant components within a j division / channel in the Design Reliability Assurance Program. ,

ABB-CE will explain in the TS bases what a control room intake /-

filtration signal division consists of and how it actuates. Included in  :

the actuation discussion will be how closing of the high-efficiency  :

particulate air filter bypass valves is initiated. l

- ABB-CE will review the NRC's comments on the TS definitions, and will revise the definitions as deemed appropriate. '

ABB-CE will add a definition of " Trip Leg" to the TS definition section. ,

ABB-CE will revise TS 3.3.6 Require Action B.1 Bases to include a discussion on how to trip the affected trip leg. ,

ABB-CE will clarify, either in the table or the bases, which functions  !

back-up each other in the remote shutdown system (TS 3.3.12).

The NRC will pursue the following two issues concerning the heating, ventilation, and air conditioning (HVAC) systems: (1) determine if the containment building and fuel building HVAC systems are Class IE; and (2) determine if the required action and completion time carried forward from limiting condition for operation (LCO) 3.7.13 to Condition D is acceptable.

- The NRC will verify that the instrumentation and control TS include the equipment that is required for shutdown risk. ,

i

- The NRC will determine whether or not engineered safeguards actuation system instrumentation functions for steam line isolation, turbine trip and main feedwater isolation, and startup feedwater isolation are applicable to Mode 5 of operation.

- The NRC will determine the appropriate completion times for the LC0 '

action statements in TSs, 3.3.11.D and 3.6.7.B.

- The NRC will determine if SR 3.3.3.6 is~ required.

Oe'd %et !% .-f  ;

Kristine M. Shembarger, Project Manager Standardization Project Directorate

  • Associate Directorate for Advanced Reactors  :

and License Renewal Office of Nuclear Reactor Regulation

Enclosure:

As stated cc w/ enclosure:

See next page DISTRIBUTION: See next page OFC: LA:PDST:ADAR PM:PDST:ADAR PM:PDST:ADAR SC:PDST:ADAR .

KShembarger:sg MFranovichg. RArchitzel NAME: PShea f4 f DATE: 12/[p/93 12/ 7 /93  % 12/9/934 12/D/93 .

0FFICIAL RECORD COPY: DOCUMENT NAME:CETSIC.KMS

o DISTRIBUTION w/ enclosures- '

< F Docket File; PDR PDST R/F DCrutchfield ,

TWambach '

SMagruder KShembarger MFranovich PShea  !

DISTRIBUTION w/o enclosures:

TMurley/FMiraglia,12GlB  !

WRussell, 12G18 WTravers  :

RBorchardt ^

RArchitzel JMoore, 15818 WDean, 17G21 ACRS (11) ,

i t

1 i

t t

i i

i

.f 140021 1

i I

ABB-Combustion Engineering, Inc. Docket No.52-002 cc: Mr. C. B. Brinkman, Acting Director  !

Nuclear Systems Licensing ABB-Combustion Engineering, Inc.

1000 Prospect Hill Road Windsor, Connecticut 06095-0500  :

Mr. C. B. Brinkman, Manager I Washington Nuclear Operations ABB-Combustion Engineering, Inc.

12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Mr. Stan Ritterbusch '

Nuclear Systems Licensing ABB-Combustion Engineering, Inc. +

1000 Prospact Hill Road Post Office Box 500 ,

Windsor, Connecticut 06095-0500 ,

Mr. Sterling Franks U.S. Department of Energy .

NE-42 i Washington, D.C. 20585 i Mr. Steve Goldberg Budget Examiner 725 17th Street, N.W.

Washington, D.C. 20503  ;

Mr. Raymond Ng ,

1776 Eye Street, N.W. l Suite 300 i Washington, D.C. 20006 Joseph R. Egan, Esquire Shaw, Pittman, Potts & Trowbridge i 2300 N Street, N.W. '

Washington, D.C. 20037-1128 Mr. Regis A. Matzie, Vice President i Nuclear Systems Development i ABB-Combustion Engineering, Inc. l 1000 Prospect Hill Road  !

Post Office Box 500

Mr. Victor G. Snell, Director Safety and Licensing AECL Technologies -i 9210 Corporate Boulevard Suite 410 Rockville, Maryland 20850 f

)

1 ABB-CE SYSTEM 80+

TS SECTION 3.3 AND CESSAR-DC SECTION 16.6 MEETING '

NOVEMBER 17 THROUGH 19, 1993 ROCKVILLE, MARYLAND ,

f NAME ORGANIZATION M. Waterman NRR/HICB i M. Franovich NRR/PDST K. Shembarger NRR/PDST l C. Shulten NRR/0TSB ,

A. Chu R/0TSB G. Johnson _NL .

J. Palomar LLNL S. Rittenbusch ABB-CE '

J. Rec ABB-CE B. Rescorl ABB-CE S. Wilkosz ABB-CE l i

i I

I f

i l

i Enclosure

.