Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20204B7181999-03-11011 March 1999 Summary of 990225 Meeting with Abb Combustion Engineering in Rockville,Md to Discuss Issues Re ABB-CE Crossflow Ultrasonic Flow Measurement Device.List of Attendees & Copy of Nonproprietary Matl Handed Out at Meeting Encl ML20198H3151998-12-14014 December 1998 Summary of 981117 Meeting with ABB-Combustion Engineering, Inc (ABB-CE) to Discuss Issues Re Rev of ABB-CE large-break LOCA Evaluation Models.List of Meeting Attendees & Meeting Presentation Slides Encl ML20247N4931998-05-20020 May 1998 Summarizes 980514 Annual Planning Meeting W/Abb Combustion Engineering in Rockville,Md to Discuss Nuclear Power Operations & Licensing Plans for Next 1-3 Years.List of Attendees Encl ML20132D8481996-12-18018 December 1996 Summary of 961212 Meeting w/ABB-CE & GE in Rockville,Md Re Changes to Design Control Documents for ABWR & Sys 80+ Standard Plant Designs.List of Attendees Encl ML20148B5761996-10-0404 October 1996 Summary of 434th Meeting of ACRS on 960912-13 Re Capability of SCAP/RELAP5 Code to Predict SG Temps During Severe Accidents ML20129G4921996-08-29029 August 1996 Summary of 433rd ACRS Meeting on 960808-10 Re Design Changes Proposed by Asea Brown Boveri - C-E Re Certification of Sys 80+ Design,Secy 96-128,proposed Rev 3 to Reg Guide 1.8,revs to Reg Guides 1.84,1.85 & 1.147 & Rev 3 to Reg Guide 1.105 ML20149F4881994-08-0404 August 1994 Summary of 940726 Meeting w/ABB-CE in Rockville,Md Re Form & Content of Design Control Document for ABB-CE Sys 80+ Std Plant Design ML20059F2261994-01-10010 January 1994 Summary of 931221 Meeting W/Util in Rockville,Md Re New Source Term & Application for EQ of Sys 80+ Plant ML20059D0191993-12-28028 December 1993 Summary of 931028-29 Meeting Between ABB-CE & Contractors & Nrc/Consultants from Llnl Re Structural Design Audit for ABB-CE Sys 80+ Std Plant Design.List of Meeting Attendees & Handouts Encl ML20058P5141993-12-17017 December 1993 Summary of 931006-07 Meeting w/ABB-CE & Duke Engineering Svcs,Inc in Windsor,Ct Re Details of Buckling Calculations for Sys 80+ Steel Containment Structure ML20058L8581993-12-13013 December 1993 Notification of 931214 Meeting w/ABB-Combustion Engineering in Rockville,Md to Review & Resolve Remaining Structural/ Geotechnical Design Issues for ABB-CE Sys 80+ ML20058K5941993-12-10010 December 1993 Summary of 931117-19 Meeting w/ABB-CE in Rockville,Md Re Comments on TS for Instrumentation Proposed for Sys 80+.List of Attendees Encl ML20059K2811993-11-10010 November 1993 Summary of 931027 Meeting w/ABB-CE in Rockville,Md Re CE Sys 80+ Protection Against Containment Bypass During SGTR & Fuel Design.List of Meeting Attendees & ABB-CE Handouts Encl ML20059G9631993-10-29029 October 1993 Summary of 930802-03 Meeting w/ABB-CE in Windsor,Ct to Obtain Latest Info on Evolving Design of CE Sys 80+ Hms. List of Meeting Attendees & Handouts Encl ML20057D2071993-09-27027 September 1993 Summary of 930615-16 Meeting w/ABB-CE in Windsor,Ct Re Status of Dser Open Items & Related follow-up Questions ML20057C1221993-09-23023 September 1993 Summary of 930916 Meeting w/ABB-CE in Rockville,Md to Discuss Potential Design Alternatives for CE Sys 80+ Design to Prevent SGTR Containment Bypass ML20057B6581993-09-15015 September 1993 Summary of 930810 & 11 Meeting w/ABB-CE in Windsor,Ct Re Issues Raised in Sys 80+ Dser on Scv Stress & Buckling Analysis.W/List of Attendees & Handouts ML20057B9661993-09-14014 September 1993 Summary of 930902 Public Meeting w/ABB-CE in Windsor,Ct Re Open Issues on Probabilistic Risk Assessment (PRA) for Sys 80+ Std Plant Design.List of Mtg Attendees & Meeting Handouts Encl ML20057A6211993-09-0707 September 1993 Summary of 930812 Meeting w/ABB-CE in Rockville,Md Re Hydrogen Control & 10CFR50.34(f) Requirements for CE Sys 80% Std Plant Design.List of Attendees & Handouts Encl ML20056G9541993-08-30030 August 1993 Summary of 930818 Meeting W/Duke Engineering & Svcs in Charlotte,Nc Re Staff Review of Safeguards Aspects of ABB-CE Sys 80+ Design ML20056G0711993-08-26026 August 1993 Summary of Public Meeting w/ABB-CE on 930809 in Rockville,Md Re Open Issues Involving PRA for Sys 80+ Std Plant Design ML20056G0731993-08-25025 August 1993 Summary of 930816 Senior Mgt Meeting w/ABB-CE in Rockville, MD Re Design Certification Status of CE Sys 80+ Std Plant Design ML20056F9231993-08-25025 August 1993 Summary of 930728 Meeting w/ABB-CE & Consultants from ABB-Impell,Duke Engineering Svcs,Inc & RP Kennedy in Rockville,Md Re System 80+ Sliding & Overturning During Seismic Events.List of Attendees Encl ML20056G2081993-08-19019 August 1993 Summary of 930819 Meeting w/ABB-CE in Rockville,Md Re Potential Design Alternatives for C-E Sys 80+ Design to Steam Generator Tube Rupture Containment Bypass.List of Attendees and Viewgraphs Encl ML20056G2041993-08-19019 August 1993 Summary of 930805 Meeting w/ABB-CE in Rockville,Md Re Containment Bypass During Steam Generator Tube Ruptures.List of Attendees & Viewgraphs Encl ML20056F8021993-08-19019 August 1993 Summary of 930621-25 Public Meeting w/ABB-CE in Windsor,Ct Re Structural,Piping,Mechanical & Matls Open Items for ABB-CE Sys 80+.Listed Info Encl ML20056E1511993-08-17017 August 1993 Summary of 930802 Meeting w/GE,C-E & Westinghouse in Rockville,Md Re Status of Design Certification Reviews for Each Revolutionary & Passive Reactor Design.List of Attendees & Handout Encl ML20056E1931993-07-30030 July 1993 Summary of 930715 Meeting w/ABB-CE in Windsor,Ct Re Differences Between Palo Verde Steam Generators & Sys 80+ Steam Generators in Connection W/Sgtr Event at Palo Verde. List of Attendees & Viewgraphs Encl ML20056E0791993-07-30030 July 1993 Summary of 930614 Meeting w/ABB-CE & BNL in Upton,Ny Re Sys 80+ Human Factors Engineering Verification & Validation Plan.Attendance List,Agenda,Nrc Comments & ABB-CE Responses Encl ML20128F6861993-02-0808 February 1993 Summary of 930111 Meeting w/ABB-CE in Windsor,Ct Re Review Status of CE Sys 80+ Design ML20127H6011993-01-15015 January 1993 Summary of 921209 Meeting w/ABB-CE in Rockville,Md to Discuss Review Status of CE Sys 80+ Design W/Senior Mgt. Associate Director for Insp & Technical Assessment Expressed Concern Re Review Process Between Dser Issues & ITAAC ML20126K0021992-12-30030 December 1992 Summary of 921202-03 Meeting w/ABB-CE in Windsor,Ct to Discuss Review of Submittal Entitled, Sys 80+ Severe Accident Phenomenology & Containment Performance, Dtd Aug 1992 1999-03-11
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20204B7181999-03-11011 March 1999 Summary of 990225 Meeting with Abb Combustion Engineering in Rockville,Md to Discuss Issues Re ABB-CE Crossflow Ultrasonic Flow Measurement Device.List of Attendees & Copy of Nonproprietary Matl Handed Out at Meeting Encl ML20198H3151998-12-14014 December 1998 Summary of 981117 Meeting with ABB-Combustion Engineering, Inc (ABB-CE) to Discuss Issues Re Rev of ABB-CE large-break LOCA Evaluation Models.List of Meeting Attendees & Meeting Presentation Slides Encl ML20247N4931998-05-20020 May 1998 Summarizes 980514 Annual Planning Meeting W/Abb Combustion Engineering in Rockville,Md to Discuss Nuclear Power Operations & Licensing Plans for Next 1-3 Years.List of Attendees Encl ML20132D8481996-12-18018 December 1996 Summary of 961212 Meeting w/ABB-CE & GE in Rockville,Md Re Changes to Design Control Documents for ABWR & Sys 80+ Standard Plant Designs.List of Attendees Encl ML20148B5761996-10-0404 October 1996 Summary of 434th Meeting of ACRS on 960912-13 Re Capability of SCAP/RELAP5 Code to Predict SG Temps During Severe Accidents ML20129G4921996-08-29029 August 1996 Summary of 433rd ACRS Meeting on 960808-10 Re Design Changes Proposed by Asea Brown Boveri - C-E Re Certification of Sys 80+ Design,Secy 96-128,proposed Rev 3 to Reg Guide 1.8,revs to Reg Guides 1.84,1.85 & 1.147 & Rev 3 to Reg Guide 1.105 ML20149F4881994-08-0404 August 1994 Summary of 940726 Meeting w/ABB-CE in Rockville,Md Re Form & Content of Design Control Document for ABB-CE Sys 80+ Std Plant Design ML20059F2261994-01-10010 January 1994 Summary of 931221 Meeting W/Util in Rockville,Md Re New Source Term & Application for EQ of Sys 80+ Plant ML20059D0191993-12-28028 December 1993 Summary of 931028-29 Meeting Between ABB-CE & Contractors & Nrc/Consultants from Llnl Re Structural Design Audit for ABB-CE Sys 80+ Std Plant Design.List of Meeting Attendees & Handouts Encl ML20058P5141993-12-17017 December 1993 Summary of 931006-07 Meeting w/ABB-CE & Duke Engineering Svcs,Inc in Windsor,Ct Re Details of Buckling Calculations for Sys 80+ Steel Containment Structure ML20058L8581993-12-13013 December 1993 Notification of 931214 Meeting w/ABB-Combustion Engineering in Rockville,Md to Review & Resolve Remaining Structural/ Geotechnical Design Issues for ABB-CE Sys 80+ ML20058K5941993-12-10010 December 1993 Summary of 931117-19 Meeting w/ABB-CE in Rockville,Md Re Comments on TS for Instrumentation Proposed for Sys 80+.List of Attendees Encl ML20059K2811993-11-10010 November 1993 Summary of 931027 Meeting w/ABB-CE in Rockville,Md Re CE Sys 80+ Protection Against Containment Bypass During SGTR & Fuel Design.List of Meeting Attendees & ABB-CE Handouts Encl ML20059G9631993-10-29029 October 1993 Summary of 930802-03 Meeting w/ABB-CE in Windsor,Ct to Obtain Latest Info on Evolving Design of CE Sys 80+ Hms. List of Meeting Attendees & Handouts Encl ML20057D2071993-09-27027 September 1993 Summary of 930615-16 Meeting w/ABB-CE in Windsor,Ct Re Status of Dser Open Items & Related follow-up Questions ML20057C1221993-09-23023 September 1993 Summary of 930916 Meeting w/ABB-CE in Rockville,Md to Discuss Potential Design Alternatives for CE Sys 80+ Design to Prevent SGTR Containment Bypass ML20057B6581993-09-15015 September 1993 Summary of 930810 & 11 Meeting w/ABB-CE in Windsor,Ct Re Issues Raised in Sys 80+ Dser on Scv Stress & Buckling Analysis.W/List of Attendees & Handouts ML20057B9661993-09-14014 September 1993 Summary of 930902 Public Meeting w/ABB-CE in Windsor,Ct Re Open Issues on Probabilistic Risk Assessment (PRA) for Sys 80+ Std Plant Design.List of Mtg Attendees & Meeting Handouts Encl ML20057A6211993-09-0707 September 1993 Summary of 930812 Meeting w/ABB-CE in Rockville,Md Re Hydrogen Control & 10CFR50.34(f) Requirements for CE Sys 80% Std Plant Design.List of Attendees & Handouts Encl ML20056G9541993-08-30030 August 1993 Summary of 930818 Meeting W/Duke Engineering & Svcs in Charlotte,Nc Re Staff Review of Safeguards Aspects of ABB-CE Sys 80+ Design ML20056G0711993-08-26026 August 1993 Summary of Public Meeting w/ABB-CE on 930809 in Rockville,Md Re Open Issues Involving PRA for Sys 80+ Std Plant Design ML20056G0731993-08-25025 August 1993 Summary of 930816 Senior Mgt Meeting w/ABB-CE in Rockville, MD Re Design Certification Status of CE Sys 80+ Std Plant Design ML20056F9231993-08-25025 August 1993 Summary of 930728 Meeting w/ABB-CE & Consultants from ABB-Impell,Duke Engineering Svcs,Inc & RP Kennedy in Rockville,Md Re System 80+ Sliding & Overturning During Seismic Events.List of Attendees Encl ML20056G2081993-08-19019 August 1993 Summary of 930819 Meeting w/ABB-CE in Rockville,Md Re Potential Design Alternatives for C-E Sys 80+ Design to Steam Generator Tube Rupture Containment Bypass.List of Attendees and Viewgraphs Encl ML20056G2041993-08-19019 August 1993 Summary of 930805 Meeting w/ABB-CE in Rockville,Md Re Containment Bypass During Steam Generator Tube Ruptures.List of Attendees & Viewgraphs Encl ML20056F8021993-08-19019 August 1993 Summary of 930621-25 Public Meeting w/ABB-CE in Windsor,Ct Re Structural,Piping,Mechanical & Matls Open Items for ABB-CE Sys 80+.Listed Info Encl ML20056E1511993-08-17017 August 1993 Summary of 930802 Meeting w/GE,C-E & Westinghouse in Rockville,Md Re Status of Design Certification Reviews for Each Revolutionary & Passive Reactor Design.List of Attendees & Handout Encl ML20056E1931993-07-30030 July 1993 Summary of 930715 Meeting w/ABB-CE in Windsor,Ct Re Differences Between Palo Verde Steam Generators & Sys 80+ Steam Generators in Connection W/Sgtr Event at Palo Verde. List of Attendees & Viewgraphs Encl ML20056E0791993-07-30030 July 1993 Summary of 930614 Meeting w/ABB-CE & BNL in Upton,Ny Re Sys 80+ Human Factors Engineering Verification & Validation Plan.Attendance List,Agenda,Nrc Comments & ABB-CE Responses Encl ML20128F6861993-02-0808 February 1993 Summary of 930111 Meeting w/ABB-CE in Windsor,Ct Re Review Status of CE Sys 80+ Design ML20127H6011993-01-15015 January 1993 Summary of 921209 Meeting w/ABB-CE in Rockville,Md to Discuss Review Status of CE Sys 80+ Design W/Senior Mgt. Associate Director for Insp & Technical Assessment Expressed Concern Re Review Process Between Dser Issues & ITAAC ML20126K0021992-12-30030 December 1992 Summary of 921202-03 Meeting w/ABB-CE in Windsor,Ct to Discuss Review of Submittal Entitled, Sys 80+ Severe Accident Phenomenology & Containment Performance, Dtd Aug 1992 1999-03-11
[Table view] |
Text
_ _ _ _ _ _ _ _ _ _ - _ _ _ _
~
l
, pn M c u
[ T UNITED STATES
[#;3.kDf }j NUCLEAR REGULATORY COMMISSION wASWNGTON. D.C. 20556 0001
\,}, -
- December 10, 1993 Docket No.52-002 APPLICANT: ABB-Combustion Engineering, Inc. (ABB-CE) l PROJECT: CE System 80+
SUBJECT:
PUBLIC MEETING 0F NOVEMBER 17 THROUGH 19, 1993, TO DISCUSS CE.
SYSTEM 80+ TECHNICAL SPECIFICATIONS (TS) FOR INSTRUMENTATION, !
SECTION 3.3 0F TS, AND SECTION 16.6 0F CESSAR-DC On November 17 through 19, 1993, a public meeting was held at the ABB-CE offices in Rockville, Maryland, among representatives of ABB-CE, the U.S.
Nuclear Regulatory Commission (NRC), and NRC contractors. Enclosure 1 provides a list of attendees.
l The purpose of the meeting was to discuss the NRC staff's and its contractor's comments on TS for instrumentation proposed for System 80+ in Section 16.6 of CESSAR-DC.
Resolutions Reached Durina The Meetina Two changes will be made to the TS to address software errors. First, I the word " software" will be added to the definition of Operabilit;.
Second, Section 5.0 of the TS will be modified to add administrative reporting requirements.
The requirement to perform comprehensive functional tests to determine the operability of the protection system will not be added to TS. This resolution was reached based on the following factors: (1) extensive pre-operational testing will be performed to verify inputs over the I
required range; (2) software does not degrade over time; (3) it is unlikely that multiple trip inputs will be received simultaneously; (4) self-diagnostics will be performed; and (5) periodic surveillances will be performed to exercise each input by periodically forcing the input to a specific value over the trip setpoint.
It is acceptable to eliminate the requirement to perform the functional test on the protection system if the system is in 1-out-of-2 logic during plant operation. Performance of the test at power would result in a plant trip.
The gateways attached to the engineered safety features redundant communication links do not need to be in TS. This resolution was q reached based on the following factors: (1) the communication link has 5
. deterministic behavior; (2) self-diagnostics will be performed; and (3) or,e-way communication of information is adequate.
784222888:8si8a802 A WC FRE CENTER COPY PDR
December 10, 1993 Commitments Made Durina The Meetina ;
ABB-CE will address the issue of redundant components within a j division / channel in the Design Reliability Assurance Program. ,
ABB-CE will explain in the TS bases what a control room intake /-
filtration signal division consists of and how it actuates. Included in :
the actuation discussion will be how closing of the high-efficiency :
particulate air filter bypass valves is initiated. l
- ABB-CE will review the NRC's comments on the TS definitions, and will revise the definitions as deemed appropriate. '
ABB-CE will add a definition of " Trip Leg" to the TS definition section. ,
ABB-CE will revise TS 3.3.6 Require Action B.1 Bases to include a discussion on how to trip the affected trip leg. ,
ABB-CE will clarify, either in the table or the bases, which functions !
back-up each other in the remote shutdown system (TS 3.3.12).
The NRC will pursue the following two issues concerning the heating, ventilation, and air conditioning (HVAC) systems: (1) determine if the containment building and fuel building HVAC systems are Class IE; and (2) determine if the required action and completion time carried forward from limiting condition for operation (LCO) 3.7.13 to Condition D is acceptable.
- The NRC will verify that the instrumentation and control TS include the equipment that is required for shutdown risk. ,
i
- The NRC will determine whether or not engineered safeguards actuation system instrumentation functions for steam line isolation, turbine trip and main feedwater isolation, and startup feedwater isolation are applicable to Mode 5 of operation.
- The NRC will determine the appropriate completion times for the LC0 '
action statements in TSs, 3.3.11.D and 3.6.7.B.
- The NRC will determine if SR 3.3.3.6 is~ required.
Oe'd %et !% .-f ;
Kristine M. Shembarger, Project Manager Standardization Project Directorate
- Associate Directorate for Advanced Reactors :
and License Renewal Office of Nuclear Reactor Regulation
Enclosure:
As stated cc w/ enclosure:
See next page DISTRIBUTION: See next page OFC: LA:PDST:ADAR PM:PDST:ADAR PM:PDST:ADAR SC:PDST:ADAR .
KShembarger:sg MFranovichg. RArchitzel NAME: PShea f4 f DATE: 12/[p/93 12/ 7 /93 % 12/9/934 12/D/93 .
0FFICIAL RECORD COPY: DOCUMENT NAME:CETSIC.KMS
o DISTRIBUTION w/ enclosures- '
< F Docket File; PDR PDST R/F DCrutchfield ,
TWambach '
SMagruder KShembarger MFranovich PShea !
DISTRIBUTION w/o enclosures:
TMurley/FMiraglia,12GlB !
WRussell, 12G18 WTravers :
RBorchardt ^
RArchitzel JMoore, 15818 WDean, 17G21 ACRS (11) ,
i t
1 i
t t
i i
i
.f 140021 1
i I
ABB-Combustion Engineering, Inc. Docket No.52-002 cc: Mr. C. B. Brinkman, Acting Director !
Nuclear Systems Licensing ABB-Combustion Engineering, Inc.
1000 Prospect Hill Road Windsor, Connecticut 06095-0500 :
Mr. C. B. Brinkman, Manager I Washington Nuclear Operations ABB-Combustion Engineering, Inc.
12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Mr. Stan Ritterbusch '
Nuclear Systems Licensing ABB-Combustion Engineering, Inc. +
1000 Prospact Hill Road Post Office Box 500 ,
Windsor, Connecticut 06095-0500 ,
Mr. Sterling Franks U.S. Department of Energy .
NE-42 i Washington, D.C. 20585 i Mr. Steve Goldberg Budget Examiner 725 17th Street, N.W.
Washington, D.C. 20503 ;
Mr. Raymond Ng ,
1776 Eye Street, N.W. l Suite 300 i Washington, D.C. 20006 Joseph R. Egan, Esquire Shaw, Pittman, Potts & Trowbridge i 2300 N Street, N.W. '
Washington, D.C. 20037-1128 Mr. Regis A. Matzie, Vice President i Nuclear Systems Development i ABB-Combustion Engineering, Inc. l 1000 Prospect Hill Road !
Post Office Box 500
Mr. Victor G. Snell, Director Safety and Licensing AECL Technologies -i 9210 Corporate Boulevard Suite 410 Rockville, Maryland 20850 f
)
1 ABB-CE SYSTEM 80+
TS SECTION 3.3 AND CESSAR-DC SECTION 16.6 MEETING '
NOVEMBER 17 THROUGH 19, 1993 ROCKVILLE, MARYLAND ,
f NAME ORGANIZATION M. Waterman NRR/HICB i M. Franovich NRR/PDST K. Shembarger NRR/PDST l C. Shulten NRR/0TSB ,
A. Chu R/0TSB G. Johnson _NL .
J. Palomar LLNL S. Rittenbusch ABB-CE '
J. Rec ABB-CE B. Rescorl ABB-CE S. Wilkosz ABB-CE l i
i I
I f
i l
i Enclosure
.