|
---|
Category:MEETING MINUTES & NOTES--CORRESPONDENCE
MONTHYEARML20204B7181999-03-11011 March 1999 Summary of 990225 Meeting with Abb Combustion Engineering in Rockville,Md to Discuss Issues Re ABB-CE Crossflow Ultrasonic Flow Measurement Device.List of Attendees & Copy of Nonproprietary Matl Handed Out at Meeting Encl ML20198H3151998-12-14014 December 1998 Summary of 981117 Meeting with ABB-Combustion Engineering, Inc (ABB-CE) to Discuss Issues Re Rev of ABB-CE large-break LOCA Evaluation Models.List of Meeting Attendees & Meeting Presentation Slides Encl ML20247N4931998-05-20020 May 1998 Summarizes 980514 Annual Planning Meeting W/Abb Combustion Engineering in Rockville,Md to Discuss Nuclear Power Operations & Licensing Plans for Next 1-3 Years.List of Attendees Encl ML20132D8481996-12-18018 December 1996 Summary of 961212 Meeting w/ABB-CE & GE in Rockville,Md Re Changes to Design Control Documents for ABWR & Sys 80+ Standard Plant Designs.List of Attendees Encl ML20148B5761996-10-0404 October 1996 Summary of 434th Meeting of ACRS on 960912-13 Re Capability of SCAP/RELAP5 Code to Predict SG Temps During Severe Accidents ML20129G4921996-08-29029 August 1996 Summary of 433rd ACRS Meeting on 960808-10 Re Design Changes Proposed by Asea Brown Boveri - C-E Re Certification of Sys 80+ Design,Secy 96-128,proposed Rev 3 to Reg Guide 1.8,revs to Reg Guides 1.84,1.85 & 1.147 & Rev 3 to Reg Guide 1.105 ML20149F4881994-08-0404 August 1994 Summary of 940726 Meeting w/ABB-CE in Rockville,Md Re Form & Content of Design Control Document for ABB-CE Sys 80+ Std Plant Design ML20059F2261994-01-10010 January 1994 Summary of 931221 Meeting W/Util in Rockville,Md Re New Source Term & Application for EQ of Sys 80+ Plant ML20059D0191993-12-28028 December 1993 Summary of 931028-29 Meeting Between ABB-CE & Contractors & Nrc/Consultants from Llnl Re Structural Design Audit for ABB-CE Sys 80+ Std Plant Design.List of Meeting Attendees & Handouts Encl ML20058P5141993-12-17017 December 1993 Summary of 931006-07 Meeting w/ABB-CE & Duke Engineering Svcs,Inc in Windsor,Ct Re Details of Buckling Calculations for Sys 80+ Steel Containment Structure ML20058L8581993-12-13013 December 1993 Notification of 931214 Meeting w/ABB-Combustion Engineering in Rockville,Md to Review & Resolve Remaining Structural/ Geotechnical Design Issues for ABB-CE Sys 80+ ML20058K5941993-12-10010 December 1993 Summary of 931117-19 Meeting w/ABB-CE in Rockville,Md Re Comments on TS for Instrumentation Proposed for Sys 80+.List of Attendees Encl ML20059K2811993-11-10010 November 1993 Summary of 931027 Meeting w/ABB-CE in Rockville,Md Re CE Sys 80+ Protection Against Containment Bypass During SGTR & Fuel Design.List of Meeting Attendees & ABB-CE Handouts Encl ML20059G9631993-10-29029 October 1993 Summary of 930802-03 Meeting w/ABB-CE in Windsor,Ct to Obtain Latest Info on Evolving Design of CE Sys 80+ Hms. List of Meeting Attendees & Handouts Encl ML20057D2071993-09-27027 September 1993 Summary of 930615-16 Meeting w/ABB-CE in Windsor,Ct Re Status of Dser Open Items & Related follow-up Questions ML20057C1221993-09-23023 September 1993 Summary of 930916 Meeting w/ABB-CE in Rockville,Md to Discuss Potential Design Alternatives for CE Sys 80+ Design to Prevent SGTR Containment Bypass ML20057B6581993-09-15015 September 1993 Summary of 930810 & 11 Meeting w/ABB-CE in Windsor,Ct Re Issues Raised in Sys 80+ Dser on Scv Stress & Buckling Analysis.W/List of Attendees & Handouts ML20057B9661993-09-14014 September 1993 Summary of 930902 Public Meeting w/ABB-CE in Windsor,Ct Re Open Issues on Probabilistic Risk Assessment (PRA) for Sys 80+ Std Plant Design.List of Mtg Attendees & Meeting Handouts Encl ML20057A6211993-09-0707 September 1993 Summary of 930812 Meeting w/ABB-CE in Rockville,Md Re Hydrogen Control & 10CFR50.34(f) Requirements for CE Sys 80% Std Plant Design.List of Attendees & Handouts Encl ML20056G9541993-08-30030 August 1993 Summary of 930818 Meeting W/Duke Engineering & Svcs in Charlotte,Nc Re Staff Review of Safeguards Aspects of ABB-CE Sys 80+ Design ML20056G0711993-08-26026 August 1993 Summary of Public Meeting w/ABB-CE on 930809 in Rockville,Md Re Open Issues Involving PRA for Sys 80+ Std Plant Design ML20056G0731993-08-25025 August 1993 Summary of 930816 Senior Mgt Meeting w/ABB-CE in Rockville, MD Re Design Certification Status of CE Sys 80+ Std Plant Design ML20056F9231993-08-25025 August 1993 Summary of 930728 Meeting w/ABB-CE & Consultants from ABB-Impell,Duke Engineering Svcs,Inc & RP Kennedy in Rockville,Md Re System 80+ Sliding & Overturning During Seismic Events.List of Attendees Encl ML20056G2081993-08-19019 August 1993 Summary of 930819 Meeting w/ABB-CE in Rockville,Md Re Potential Design Alternatives for C-E Sys 80+ Design to Steam Generator Tube Rupture Containment Bypass.List of Attendees and Viewgraphs Encl ML20056G2041993-08-19019 August 1993 Summary of 930805 Meeting w/ABB-CE in Rockville,Md Re Containment Bypass During Steam Generator Tube Ruptures.List of Attendees & Viewgraphs Encl ML20056F8021993-08-19019 August 1993 Summary of 930621-25 Public Meeting w/ABB-CE in Windsor,Ct Re Structural,Piping,Mechanical & Matls Open Items for ABB-CE Sys 80+.Listed Info Encl ML20056E1511993-08-17017 August 1993 Summary of 930802 Meeting w/GE,C-E & Westinghouse in Rockville,Md Re Status of Design Certification Reviews for Each Revolutionary & Passive Reactor Design.List of Attendees & Handout Encl ML20056E1931993-07-30030 July 1993 Summary of 930715 Meeting w/ABB-CE in Windsor,Ct Re Differences Between Palo Verde Steam Generators & Sys 80+ Steam Generators in Connection W/Sgtr Event at Palo Verde. List of Attendees & Viewgraphs Encl ML20056E0791993-07-30030 July 1993 Summary of 930614 Meeting w/ABB-CE & BNL in Upton,Ny Re Sys 80+ Human Factors Engineering Verification & Validation Plan.Attendance List,Agenda,Nrc Comments & ABB-CE Responses Encl ML20128F6861993-02-0808 February 1993 Summary of 930111 Meeting w/ABB-CE in Windsor,Ct Re Review Status of CE Sys 80+ Design ML20127H6011993-01-15015 January 1993 Summary of 921209 Meeting w/ABB-CE in Rockville,Md to Discuss Review Status of CE Sys 80+ Design W/Senior Mgt. Associate Director for Insp & Technical Assessment Expressed Concern Re Review Process Between Dser Issues & ITAAC ML20126K0021992-12-30030 December 1992 Summary of 921202-03 Meeting w/ABB-CE in Windsor,Ct to Discuss Review of Submittal Entitled, Sys 80+ Severe Accident Phenomenology & Containment Performance, Dtd Aug 1992 1999-03-11
[Table view] Category:MEETING SUMMARIES-INTERNAL (NON-TRANSCRIPT)
MONTHYEARML20204B7181999-03-11011 March 1999 Summary of 990225 Meeting with Abb Combustion Engineering in Rockville,Md to Discuss Issues Re ABB-CE Crossflow Ultrasonic Flow Measurement Device.List of Attendees & Copy of Nonproprietary Matl Handed Out at Meeting Encl ML20198H3151998-12-14014 December 1998 Summary of 981117 Meeting with ABB-Combustion Engineering, Inc (ABB-CE) to Discuss Issues Re Rev of ABB-CE large-break LOCA Evaluation Models.List of Meeting Attendees & Meeting Presentation Slides Encl ML20247N4931998-05-20020 May 1998 Summarizes 980514 Annual Planning Meeting W/Abb Combustion Engineering in Rockville,Md to Discuss Nuclear Power Operations & Licensing Plans for Next 1-3 Years.List of Attendees Encl ML20132D8481996-12-18018 December 1996 Summary of 961212 Meeting w/ABB-CE & GE in Rockville,Md Re Changes to Design Control Documents for ABWR & Sys 80+ Standard Plant Designs.List of Attendees Encl ML20148B5761996-10-0404 October 1996 Summary of 434th Meeting of ACRS on 960912-13 Re Capability of SCAP/RELAP5 Code to Predict SG Temps During Severe Accidents ML20129G4921996-08-29029 August 1996 Summary of 433rd ACRS Meeting on 960808-10 Re Design Changes Proposed by Asea Brown Boveri - C-E Re Certification of Sys 80+ Design,Secy 96-128,proposed Rev 3 to Reg Guide 1.8,revs to Reg Guides 1.84,1.85 & 1.147 & Rev 3 to Reg Guide 1.105 ML20149F4881994-08-0404 August 1994 Summary of 940726 Meeting w/ABB-CE in Rockville,Md Re Form & Content of Design Control Document for ABB-CE Sys 80+ Std Plant Design ML20059F2261994-01-10010 January 1994 Summary of 931221 Meeting W/Util in Rockville,Md Re New Source Term & Application for EQ of Sys 80+ Plant ML20059D0191993-12-28028 December 1993 Summary of 931028-29 Meeting Between ABB-CE & Contractors & Nrc/Consultants from Llnl Re Structural Design Audit for ABB-CE Sys 80+ Std Plant Design.List of Meeting Attendees & Handouts Encl ML20058P5141993-12-17017 December 1993 Summary of 931006-07 Meeting w/ABB-CE & Duke Engineering Svcs,Inc in Windsor,Ct Re Details of Buckling Calculations for Sys 80+ Steel Containment Structure ML20058L8581993-12-13013 December 1993 Notification of 931214 Meeting w/ABB-Combustion Engineering in Rockville,Md to Review & Resolve Remaining Structural/ Geotechnical Design Issues for ABB-CE Sys 80+ ML20058K5941993-12-10010 December 1993 Summary of 931117-19 Meeting w/ABB-CE in Rockville,Md Re Comments on TS for Instrumentation Proposed for Sys 80+.List of Attendees Encl ML20059K2811993-11-10010 November 1993 Summary of 931027 Meeting w/ABB-CE in Rockville,Md Re CE Sys 80+ Protection Against Containment Bypass During SGTR & Fuel Design.List of Meeting Attendees & ABB-CE Handouts Encl ML20059G9631993-10-29029 October 1993 Summary of 930802-03 Meeting w/ABB-CE in Windsor,Ct to Obtain Latest Info on Evolving Design of CE Sys 80+ Hms. List of Meeting Attendees & Handouts Encl ML20057D2071993-09-27027 September 1993 Summary of 930615-16 Meeting w/ABB-CE in Windsor,Ct Re Status of Dser Open Items & Related follow-up Questions ML20057C1221993-09-23023 September 1993 Summary of 930916 Meeting w/ABB-CE in Rockville,Md to Discuss Potential Design Alternatives for CE Sys 80+ Design to Prevent SGTR Containment Bypass ML20057B6581993-09-15015 September 1993 Summary of 930810 & 11 Meeting w/ABB-CE in Windsor,Ct Re Issues Raised in Sys 80+ Dser on Scv Stress & Buckling Analysis.W/List of Attendees & Handouts ML20057B9661993-09-14014 September 1993 Summary of 930902 Public Meeting w/ABB-CE in Windsor,Ct Re Open Issues on Probabilistic Risk Assessment (PRA) for Sys 80+ Std Plant Design.List of Mtg Attendees & Meeting Handouts Encl ML20057A6211993-09-0707 September 1993 Summary of 930812 Meeting w/ABB-CE in Rockville,Md Re Hydrogen Control & 10CFR50.34(f) Requirements for CE Sys 80% Std Plant Design.List of Attendees & Handouts Encl ML20056G9541993-08-30030 August 1993 Summary of 930818 Meeting W/Duke Engineering & Svcs in Charlotte,Nc Re Staff Review of Safeguards Aspects of ABB-CE Sys 80+ Design ML20056G0711993-08-26026 August 1993 Summary of Public Meeting w/ABB-CE on 930809 in Rockville,Md Re Open Issues Involving PRA for Sys 80+ Std Plant Design ML20056G0731993-08-25025 August 1993 Summary of 930816 Senior Mgt Meeting w/ABB-CE in Rockville, MD Re Design Certification Status of CE Sys 80+ Std Plant Design ML20056F9231993-08-25025 August 1993 Summary of 930728 Meeting w/ABB-CE & Consultants from ABB-Impell,Duke Engineering Svcs,Inc & RP Kennedy in Rockville,Md Re System 80+ Sliding & Overturning During Seismic Events.List of Attendees Encl ML20056G2081993-08-19019 August 1993 Summary of 930819 Meeting w/ABB-CE in Rockville,Md Re Potential Design Alternatives for C-E Sys 80+ Design to Steam Generator Tube Rupture Containment Bypass.List of Attendees and Viewgraphs Encl ML20056G2041993-08-19019 August 1993 Summary of 930805 Meeting w/ABB-CE in Rockville,Md Re Containment Bypass During Steam Generator Tube Ruptures.List of Attendees & Viewgraphs Encl ML20056F8021993-08-19019 August 1993 Summary of 930621-25 Public Meeting w/ABB-CE in Windsor,Ct Re Structural,Piping,Mechanical & Matls Open Items for ABB-CE Sys 80+.Listed Info Encl ML20056E1511993-08-17017 August 1993 Summary of 930802 Meeting w/GE,C-E & Westinghouse in Rockville,Md Re Status of Design Certification Reviews for Each Revolutionary & Passive Reactor Design.List of Attendees & Handout Encl ML20056E1931993-07-30030 July 1993 Summary of 930715 Meeting w/ABB-CE in Windsor,Ct Re Differences Between Palo Verde Steam Generators & Sys 80+ Steam Generators in Connection W/Sgtr Event at Palo Verde. List of Attendees & Viewgraphs Encl ML20056E0791993-07-30030 July 1993 Summary of 930614 Meeting w/ABB-CE & BNL in Upton,Ny Re Sys 80+ Human Factors Engineering Verification & Validation Plan.Attendance List,Agenda,Nrc Comments & ABB-CE Responses Encl ML20128F6861993-02-0808 February 1993 Summary of 930111 Meeting w/ABB-CE in Windsor,Ct Re Review Status of CE Sys 80+ Design ML20127H6011993-01-15015 January 1993 Summary of 921209 Meeting w/ABB-CE in Rockville,Md to Discuss Review Status of CE Sys 80+ Design W/Senior Mgt. Associate Director for Insp & Technical Assessment Expressed Concern Re Review Process Between Dser Issues & ITAAC ML20126K0021992-12-30030 December 1992 Summary of 921202-03 Meeting w/ABB-CE in Windsor,Ct to Discuss Review of Submittal Entitled, Sys 80+ Severe Accident Phenomenology & Containment Performance, Dtd Aug 1992 1999-03-11
[Table view] |
Text
.
Docket No.52-002 January 10, 1994 APPLICANT: ABB-Combustion Engineering, Inc. (ABB-CE)
PROJECT: CE System 80+
SUBJECT:
PUBLIC MEETING 0F DECEMBER 21, 1993, TO DISCUSS (1) THE NEW SOURCE TERM AND ITS APPLICATION FOR ENVIRONMENTAL QUALIFICATION (EQ) 0F PLANT EQUIPMENT, AND (2) EQUIPMENT SURVIVABILITY FOR SEVERE ACCIDENT CONDITIONS On December 21, 1993, a public meeting was held at the U.S. Nuclear Regulatory Commission (NRC) in Rockville, Maryland, between representatives of ABB-CE and its contractor and the NRC. A list of the attendees is enclosed.
The purpose of the meeting was to discuss the new source term and its applica-tion for EQ of System 80+ plant equipment. Equipment survivability for severe; accident conditions was also discussed.
Source Term Application For E0:
ABB-CE presented the System 80+ equipment that they have determined will be required to meet the equipment qualification requirements in accordance with Regulatory Guide 1.97. In addition, they discussed the proposed mission times of equipment, which in some cases, deviates from current practices. Since the basis for the reduced mission times has not yet been provided in the standard ,
safety analysis report, the NRC staff has not yet determined if the deviations are acceptable. ABB-CE will provide the NRC staff with the associated-basis in January 1994.
jlquioment Survivability For Severe Accident Conditions:
ABB-CE and the NRC staff discussed briefly the issue of equipment surviva- i bility for severe accident conditions and the ABB-CE position on the issue.
The NRC staff will review ABB-CE's position and determine if it is acceptable.
(Original signed by)
Kristine M. Shembarger, Project Manager Standardization Project Directorate Associate Directorate for Advanced Reactors i 2 O C'[,O and License Renewal Office of Nuclear Reactor Regulation
Enclosure:
As stated cc w/ enclosure:
See next page DISTRIBUTION w/ enclosure:
e Docket File: PDST R/F DCrutchfield TMurley/FMiraglia 1 I
PDR KShembarger PShea DISTRIBUTION w/o enclosures:
RBorchardt JMoore SMagruder MFranovich 1 TWambach RArchitzel ACRS (11) EJordan, MNBB3701 )
JMoore, 15B18 WDean, EDO WTravers 7
0FF: PM:PDST:ADAR PM:PD DAR SC:PDST:ADAR /
NAME:
LA:PDST:A[DAR PShea KShembarger MFrali fch RArchitzel s 4V/ l DATE: ] //o/9Y l /10/97 P'@ //A 9y , /f 0/9'4 !
0FFICIAL RECORD COPY: CE1221.KMS I 9401130208 940110 PDR ADOCK 05200002 ilBMWPvG EM z G.
%9
%&AVD$ [S O.5 @I I
4 P PDR ]
i .
J ABB-Combustion Engineering, Inc. Docket No.52-002
- cc: Mr. C. B. Brinkman, Acting Director Nuclear Systems Licensing ABB-Combustion Engineering, Inc.
1000 Prospect Hill Road Windsor, Connecticut 06095-0500 Mr. C. B. Brinkman, Manager Washington Nuclear Operations ABB-Combustion Engineering, Inc.
12300 Twinbrook Parkway, Suite 330 Rockville, Maryland 20852 Mr. Stan Ritterbusch Nuclear Systems Licensing ABB-Combustion Engineering, Inc.
1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095-0500 Mr. Sterling Franks U.S. Department of Energy _
NE-42 Washington, D.C. 20585-Mr. Steve Goldberg Budget Examiner 725_17th Street, N.W.
Washington, D.C. 20503 Mr. Raymond Ng 1776 Eye Street, N.W.
Suite 300 Washington, D.C. 20006 Joseph R. Egan, Esquire Shaw, Pittman, Potts & Trowbridge 2300 N Street, N.W.
Washington, D.C. 20037-1128 Mr. Regis A. Matzie, Vice President Nuclear Systems Development ABB-Combustion Engineering, Inc.
1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095-0500 Mr. Victor G. Snell, Director Safety and Licensing AECL Technologies 9210 Corporate Boulevard Suite 410 Rockville, Maryland 20850
o
')
ABB-CE SYSTEM 80+
EQ AND SOURCE TERM MEETING December 21, 1993 Rockville, Maryland UAME ORGANIZATION H. Franovich NRR/PDST R. Architzel NRR/PDST K. Shembarger NRR/PDST H. Walker NRR/SPLB L. Cunningham NRR/PRPB T. Essig NRR/PRPB R. Barrett NRR C. McCracken NRR J. Lyons NRR/SPLB T. Collins NRR/SRXB M. Snodderly HRR/SCSB
-S. Ritterbusch ABB-CE R. Schneider ABB-CE F. Carpentino ABB-CE J. Metcalf Stone & Webster P. Lang DOE Enclosure